Download Print this page

Mara FOLLOW MEETING LARGE 298ML Installation Instructions

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
/ ISTRUZIONI DI MONTAGGIO
FOLLOW MEETING LARGE 298ML
A
X8
B
X12
TCEi M10 x 16
C
X12
D
X8
TSPEi M6 x 16
2
Remove the screws inserted in the two bases
Rimuovere le viti inserite nelle due basi
5
ATTENTION
!
Always assemble leg and beam identified by the
same colour sticker.
ATTENZIONE
Montare sempre gamba e traversa contrassegnate
dal bollino dello stesso colore.
E
X8
F
X8
G
X4
H
X1
3
x2
1
A
TSPEi M6 x 16
TSPEi M8 x 16
TSP 4X19
KEY FOR FOOT
Insert the foot levelers into the two bases
LEVELLING
Inserire i piedini livellatori nelle due basi
4
x2
B
C
Insert the screws in the two bases
Inserire le viti nelle due basi
x2
x2

Advertisement

loading
Need help?

Need help?

Do you have a question about the FOLLOW MEETING LARGE 298ML and is the answer not in the manual?

Questions and answers

Summary of Contents for Mara FOLLOW MEETING LARGE 298ML

  • Page 1 INSTALLATION INSTRUCTIONS / ISTRUZIONI DI MONTAGGIO FOLLOW MEETING LARGE 298ML TSPEi M6 x 16 TCEi M10 x 16 TSPEi M8 x 16 TSP 4X19 KEY FOR FOOT Insert the foot levelers into the two bases TSPEi M6 x 16 LEVELLING...
  • Page 3 ONLY AFTER MOUNTING THE TOP / SOLO DOPO AVER MONTATO IL PIANO Remove the release spacer from the mechanism (11a) Rimuovere il distanziale di sicurezza inserito nella maniglia (11a) ONLY IF NECESSARY / SOLO SE NECESSARIO Unscrew the nut (11b) and adjust the handle cable (11c): a clockwise rotation will loosen it, while a counter clockwise rotation will tighten it out Svitare il dado (11b) e regolare il cavo della maniglia (11c): una rotazione oraria lo allenterà...