2
10
6
8
4
10
1
Important Notice for Purchaser/Installers
Installation Guide
Check the contents of the pack carefully before installation.
18
CONVEX will not be held responsible for any de- t/re- t costs where faulty product has been tted.
1
Code: V10 - S
If any fault is found with materials or workmanship, it must be reported immediately to the CONVEX.
Remedial action will be taken, based on information received, on condition that:
1. Full details are supplied to the CONVEX;
2. The screen has not been modi ed or malicious/intentional damage or neglect;
Attach rail to wall brackets by sliding wall bracket outer
3. The CONVEX is informed of any damage/shortages prior to installation.
Door Panel
sleeves over the wall blocks and secure with grub screws.
Fit door stabiliser guides to door and adjust to prevent door from lifting.
We do NOT accept responsibility for any problems that may occur through incorrect installation.
The success of the installation and operation of any shower screen is, of course,
5
4
dependant on the squareness, alignment and construction of the walls to which xing is to be carried out.
Glass Breakage Warning
CONVEX's shower glass panels are made from Grade A Toughened Safety Glass that complies with relevant
Australian Standards. The glass can be damaged and broken if it is handled incorrectly, even if it is tough
Pre-Drilled Rail
and hard to break. Always TWO persons install the panels with care. Toughened Safety Glass can NOT
be cut, drilled or grinded like other ordinary glass.
9
Attach Fixed Panel-Rail Connector to connect rail to fixed panel.
We do NOT accept responsibility for glass breakage after dispatch from Convex.
The purchaser/installer acknowledge that it is their responsibility of checking
7
if the glass at the time of handover was undamaged and free from any defects.
9
a
Safety Matters
3
Wall-Rail Bracket
5
ALWAYS :
Check there is no electrical wires or hoses before you drill or mount anything.
13
Wear safety glasses and gloves when handling chemicals, silicone or such.
Work in a safe manner & comply with OHS requirements.
Enter the shower slowly with care to avoid slipping, open & close
a
Position and level the
the shower door gently to avoid any potential damage or injury.
wall channels. Mark
Tools & Equipments Required
DO NOT:
the fastening holes.
Take measurement between internal
Stand on the shower screen package or any other objects or xings. It could cause injury or physical harm.
Allen Key
blocks on wall and return panel.
Rest or place the glass panels on hard surfaces like tiles, concrete, other glass panels or metal surfaces.
c
Cushion the edges with cardboard, soft timber or rubber mat.
Cut rail to suit width
17
Impact or scratch the glass panels with any sharp metallic objects or tools.
between wall bracket blocks.
Allow children to use the shower alone or to play i n the shower to prevent any injury.
Use shower within 24 hours before the silicone fully dry.
Cleaning & Maintenance
Door Bumper Stopper
c
Many household cleaners contain abrasive and chemical substances and should not be used for cleaning
If no studs are behind
painted, plated or plastic ttings. These nished should be cleaned with a mild washing up detergent and
the wall covering, use wall
wiped dry using a soft cloth.Regular cleansing with a biodegradable cleanser prevents stubborn stains and
plugs when fastening
Place door panel inside the shower
ensures a clean and hygienic surface for many years. Do NOT use scouring or caustic cleansers under any
the wall channels.
safely before connecting rail.
circumstances. These can damage the surface nish of this product.
Tips
Parts list
2
x 1
6
Fixed Panel
8
14
6
x 1
3
Door Roller
10
Fit knob to the door.
12
17
x 2
Stopper
14
x 3
L Shape Con guration
End Cap
(with screw)
18
x 2
Plastic Wedge
To level door panel,
use allen key to
Slide 2x stoppers and 2x wall bracket sleeves
adjust roller.
onto the rail before fitting to the blocks.
3
Side view
Facing the wall
Silicone along wall channel
and bottom of the fixed panel.
7
Please allow at least 24 hours
x 1
for the silicone to fully cure
Inside shower
Wall profile of this screen
before using the shower.
Return Panel
can be channel or bracket.
7
Inside shower
Wall rail
rail
The wall profile in this guide
bracket block
is wall channel as example.
x 2
16
Insert the plastic wedge
square block
Fixed Panel-Rail Connector
between fixed panel &
1
Fit the internal block of the wall
wall channel.
11
bracket inline with the fixed
Recommend apply silicone
panel top holes on the wall.
inside the channel.
x 2
b
Floor Guide
15
11
This shower system is projected to offer
15
maximum aesthetics united to optimum
Ensure the floor guide is set to suit your
functionality, assuring water tightness
b
Drill the wall covering.
Fit side water seal on fixed panel.
desired composition (left or right). Then
during showering, and quick rinsing
x 1
Proceed to use the grub screw to secure
operations. Only correct installation
the guide to the bottom leading corner
assures adequate water tightness.
Water Bar
Fit end cap with rail
of the fixed panel.
d
bracket on return panel.
19
Fit door bumper seals on the
x 2
both sides of door panel.
Screws & Plugs
d
Fasten the wall channel
with ST4*30 screws.
Hang door on the rail while fitting
Measure and cut water bar to fit under the
bottom edge into the floor guide
door panel. Silicone around the water bar.
Fit door rollers on the door panel.
and adjust wheel cam until level.
view from outside
9
4
23
10
5
10
x 1
x 2
Wall Channel
8
24H
x 2
x 2
2
Door Stabiliser Guide
13
x 1
x 1
Round Knob
16
x 1
x 1
Panel Water Seal
x 7
NO
8
9
6
7
5
4
3
1 2
19
Need help?
Do you have a question about the V10-S and is the answer not in the manual?
Questions and answers