TMG WORKSTATION COMBO PRO 9-PC GREY Series Product Manual

TMG WORKSTATION COMBO PRO 9-PC GREY Series Product Manual

Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WORKSTATION COMBO PRO 9-PC GREY Series and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG WORKSTATION COMBO PRO 9-PC GREY Series

  • Page 2: Safety Guidelines

    Important When you open the cartons, carefully check the contents and make sure there is no damage. If you have any problems or you find any parts damaged or missing, please contact with us. Do not return the product to the store before contacting us. Do not dispose of your cartons until you are completely satisfied with your products.
  • Page 3: Tools Required

    CAUTION BE CAREFUL when opening more than one drawer. The product could become unstable and tip, which may cause product damage or personal injury. CAUTION High risk of tipping if the product is not installed correctly. Securely attach the product to the wall to avoid serious injury. Unpacking 1.
  • Page 4: Parts List

    Parts List Description M5 x 50 Hex Tapping Bolt Flat Washer 1-Drwaer 2-Door Base Cabinet 4-Drawer Base Cabinet M6x12 Flat-Head Bolt M6 Hex Flange Nut Locker Wall Cabinet 71” Wooden top www.tmgindustrial.com 3 / 12 Toll Free:1-877-761-2819 ►...
  • Page 5 Locker Parts List Description Body Shelf Hardware Feet M6x12 Flat-Head Bolt Adjustable Leveling Feet www.tmgindustrial.com 4 / 12 Toll Free:1-877-761-2819 ►...
  • Page 6 4-Drawer Cabinet Parts List Description Body 4” Caster with brake 4” Caster M8x20 Hex Flange Bolt www.tmgindustrial.com 5 / 12 Toll Free:1-877-761-2819 ►...
  • Page 7 Wall Cabinet Parts List Description Body 1-Drawer 2-Door Base Cabinet www.tmgindustrial.com 6 / 12 Toll Free:1-877-761-2819 ►...
  • Page 8: Installing The Feet

    Parts List Description Body Shelf Hardware Feet M6x12 Flat-Head Bolt Adjustable Leveling Feet Setup Installing the Feet Carefully set the locker / base cabinet on its back or then attach the adjustable leveling feet to the locker or the cabinet using M6x12 flat-head bolts with a Philips screw driver. Repeat for the other locker and base cabinets.
  • Page 9: Installing The Shelves

    Installing the Shelves Check the location needed, carefully put the shelf into the slot. Please make sure that the shelf is stable.A center shelf must be installed levelled with the lock on the locker door in order for the lock to work. Installing the Caster Securely locked all the drawers of the rolling cabinet.
  • Page 10 Installing the Worktop Open the doors or remove the drawers to make sure that you have enough space to install the worktop. Carefully place the 71’’ worktop on the cabinets and fasten it with cordless power drill and four screws in the parts package of base cabinet . Setup 1.
  • Page 11 E. Make sure that the cabinets will be at a suitable height and the wall cabinets are not out of reach. Height Floor Note: Make sure that there are two studs to mount the locker on as it is easiest to start the installation with the locker first.
  • Page 12: Operation

    3. Connecting the cabinets and lockers together For the cabinet set, open all the doors and remove the top drawer. Push the base/wall cabinet and locker together. Insert two M6x12 flat-head bolts through the two interior holes and secure them together with two M6 Hex flange nuts using a Phillips screw driver and wrench. Repeat for the other locker and cabinets.
  • Page 13: Maintenance

    Maintenance 1. Lubricate the slides twice a year with a quality lubricant. This is especially necessary when the temperature drops, which may cause the bearings to be stiff. 2. Periodically clean the drawer fronts, doors, handles and other surfaces with mild detergent and water.

This manual is also suitable for:

Tmg-gcc09bWorkstation combo pro seriesTmg-gcc08b

Table of Contents