Page 3
Patz Belt Feeders or elevation and type of material moved. attachments previously delivered. Any length 2410 Belt Feeder from 20' (6.1 m) to 400' In this manual some guards have been removed and (121.9 m) is possible by field cutting standard parts.
Feeder Mounting CONVEYOR PORTION SUPPORT INSTALLING SUPPORT BRACKET OR MOUNT PIPE CAUTION: 2410 Belt Feeder must be supported at both ends with additional supports no more than 10 ft. (3 m) apart. Support brackets are required anywhere a belt feeder rests on something. Consult...
Feeder Mounting CONVEYOR PORTION SUPPORT INSTALLING CABLE SUSPENSION PKG. CAUTION: 2410 Belt Feeder must be supported at both ends with additional supports no more than 10 ft. (3 m) apart. Support brackets are required anywhere a belt feeder rests on something. Consult...
Feeder Mounting CONVEYOR PORTION SUPPORT INSTALLING FLOOR MOUNT CAUTION: 2410 Belt Feeder must be supported at both ends with additional supports no more than 10 ft. (3 m) apart. The drive end frame should be supported and holes are provided for that purpose in the bottom flange.
Feeder Mounting FEEDER SUPPORT INSTALLING CEILING MOUNT BRACKET CAUTION: 2410 Belt Feeder must be supported at both ends with additional supports no more than 10 ft. (3 m) apart. 48” (1219 mm) Consult a building contractor or architect 24” (610 mm) 24”...
Feeder Mounting FEEDER SUPPORT INSTALLING SIDE MOUNT BRACKETS Fig. 1 CAUTION: 2410 Belt Feeder must be supported at both ends with additional supports no more than 10 ft. (3 m) apart. Consult a building contractor or architect before installing on existing structures.
Failure to heed may result in personal in- jury or death. NOTE: The 2410 cable drive with snub pulley is de- signed to be able to raise the upper cable up away from the feeder to separate the cables and provide additional cable wrap on the drive pulley to minimize cable driving tension.
Failure to heed may result in personal in- jury or death. NOTE: The 2410 cable drive with snub pulley is de- signed to raise the upper cable up away from Fig. 1 the feeder to separate the cables and provide additional cable wrap on the drive pulley to minimize cable driving tension.
1-Way and 2-Way plows for the operate, service, inspect, or otherwise han- 2410 feeders in either a MANual mode or a AUTO-LOT dle this belt feeder unless you have read mode by utilizing proximity sensors positioned along the operators manual and have been prop- the conveyor as “Lot Limits”.
Operation CONTROL PANEL The controls for the 2410 belt feeder plows are lo- cated on the plow control panel (Fig. 1). Carefully read the instructions outlined in the Plow Control Panel Installation and Operator’s Manual before attempting to operate the 2410 belt feeder.
Maintenance Maintenance MAINTENANCE SCHEDULE 2410 Belt Feeder Every 2 Every Every 2 Years or Check and Inspect the Following Daily Page 50 hrs Weeks 6000 hrs ........Check Plows for Build Up ...... Check Oil Level in Speed Reducer Grease Fittings on Drive & Idler End ...................
CONVEY SIDES AND CONVEYOR COVERS Use the following diagram as an aid for installing the return wheel assembly, convey sides and conveyor cov- ers. Figure 1 is a front view of the 2410 Belt Feeder. 1. Bolt, Carr 5/16-18NC x 5/8 2.
ASSEMBLY: Surface: Smooth interwoven polyester Equipment supplied partially assembled for shipping impregnated with polyvinyl chloride (PVC). Low stretch belt (required for 2410) available for cold purposes, additional field assembly required. temp and longer (over 100 ft) feeders. ELECTRIC MOTOR: 3, 5, and 7-1/2 hp. depending on conveyor speed, length, elevation and type of material conveyed;...
Need help?
Do you have a question about the 2410 and is the answer not in the manual?
Questions and answers