Advertisement

Installation Manual
SMP
GENERATION 1.5
SMP-12
SMP-15
SMP-18
SMP-21
If you have any questions, please contact us at 450-902-1355,
toll-free at 1-833-717-1355, or by email at support@rve.ca.
rve.ca
V6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GENERATION 1.5 and is the answer not in the manual?

Questions and answers

Summary of Contents for SMP GENERATION 1.5

  • Page 1 Installation Manual GENERATION 1.5 SMP-12 SMP-15 SMP-18 SMP-21 If you have any questions, please contact us at 450-902-1355, toll-free at 1-833-717-1355, or by email at support@rve.ca. rve.ca...
  • Page 2 INSTALLATION  CHECKLIST Make sure that you have received the right SMP as per your order and packing list. If you receive a damaged product, please contact RVE by email at support@rve.ca as soon as possible.
  • Page 3: Table Of Contents

    INTRODUCTION TABLE OF CONTENTS The Smart Metering Panel, hereafter referred to as SMP, ma- nages Electric Vehicle Supply Equipment (EVSE) power flow Introduction to optimize existing electrical assets and maintains opera- tional power limits. The SMP consists of a meter module, Diagram of Panel Enclosure relay controller and relay panel (see image below).
  • Page 4: Diagram Of Panel Enclosure

    DIAGRAM OF PANEL ENCLOSURE IMAGE 2. SMP-15 BOTTOM GROUDING RELAYS RELAYS LUGS SMP-21 EXITS ENTRANCES GROUNDING TERMINAL BLOCK FOR EV ENTRANCES RELAYS 01 TO 21 CT43, L1 CT43, L1 GROUNDING CT44, L2 CT44, L2 CT45, L3 CT45, L3 POWER POWER...
  • Page 5: Dimensions

    DIMENSIONS IMAGE 3. DIMENSIONS OF THE SMP GENERATION 1.5 24 " 8 " 48 " 24 " 8 " RECHARGE VÉHICULE ÉLECTRIQUE...
  • Page 6: Description

    2.2 Install the SMP on the wall ; LOAD CONTROL 2.3 Check solidity. The SMP is designed to optimize the use of the building’s STEP 3 electrical infrastructure by ensuring that it does not exceed the operational limits of the building’s electrical infrastruc- Switch off the power supply to the distribution panel.
  • Page 7 Check that the SMP is properly powered; if the screen in- side the SMP is lit, the panel is powered. If this is not the case, please contact RVE technical support by phone at * For larger capacity current transformers, please contact us.
  • Page 8: Restart Of The Smp Following A Power Outage

    The hardware required to allow the SMP to be locked with a lock is supplied (lock not included). If needed, please refer We suggest that you always keep the vehicles plugged in.
  • Page 9: Installation Examples

    INSTALLATION EXAMPLES Panel Electricity Transformer meter 3 phases 208/120V EVSE up to 21, depending on the model) 3-pole circuit breaker ELECTRICAL CHARGING INFRASTRUCTURE INFRASTRUCTURE Panel EVSE (up to 21, depending on the model) Panel Electricity Transformer meter 3 phases 208/120V EVSE (up to 21, depending on the model)
  • Page 10 Techncial Support To report any problems, please contact RVE by email at support@rve.ca.

This manual is also suitable for:

Smp-12Smp-15Smp-18Smp-21

Table of Contents