BTI Delta AKKU 06-25PD Operating Manual

Battery testers

Advertisement

Do not operate this tester unless you have read and understood
the details of this operating manual.
INTRODUCTION:
With the Delta AKKU units you can measure the capacity of lead-acid batteries.
Discharging current, cut-off voltage and charging time between discharges can be
adjusted.
The tester measures the charged/discharged Ah and the elapsed time of each cycle.
By discharging using a known C3 or C5 current for a given battery, you will get a
capacity result you can compare to the manufacturers published rating. You can also
test at 25A to determine reserve capacity.
WARNINGS
Never disconnect the battery while discharging or charging: this could
cause sparks. Always stop the tester before disconnecting.
Never use the equipment in the rain, in areas used for washing or in
damp areas.
Caution: the gases generated during charging are explosive. Do not
smoke in the vicinity of the batteries. When working with cables and electrical
equipment, avoid open flames and sparks.
Pay attention to any remarks of the battery manufacturer.
Attention: Use protective glasses and gloves during battery testing. Battery acid
causes injuries. In case of contact with battery acid, wash the affected parts with fresh
water and consult a doctor if necessary.
During discharge, elements inside unit may be visibly red due to resistive load. This
is normal operation.
Tester generates heat during use. Allow at least 6" space around unit
for proper cooling. Do not place items on top of unit. Do not use unit on
or near combustible surfaces.
CAUTION: Case of unit can get hot during use. Do not touch during use as
personal injury could result.
E-Mail
info@bti-chargers.com
Delta AKKU
BATTERY TESTERS
Models 06-25PD / 12-25PD / 24-25PD
OPERATING MANUAL
Ph: 905.636.9865 Fax: 905.636.9879
Web:
www.bti-chargers.com
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Delta AKKU 06-25PD and is the answer not in the manual?

Questions and answers

Summary of Contents for BTI Delta AKKU 06-25PD

  • Page 1 Do not place items on top of unit. Do not use unit on or near combustible surfaces. CAUTION: Case of unit can get hot during use. Do not touch during use as personal injury could result. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 2: Front Panel Controls

    After that, you can see the voltage of the battery on the display. Menu System: The main menu consists of 6 different screens. You can change between the screens with the black Toggle Display button. Screen 1 - Voltage Screen 2 - Test Parameters Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 3: Setting The Test Parameters

    ↓ buttons. By depressing and holding the ↑ or ↓ button, the values change more rapidly. Set the desired number of cycles. You can change the values between 1 and 200. Skip to the Charging time screen with the Toggle Display button. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 4 If you record a very long test, then the resolution will be not very high. After finishing the setting of the parameters, press the START/STOP button to go back to the main menu screen. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 5: Connecting A Battery Charger

    Before the tester starts the process it checks if there is a charger connected to it. If not it will ask “Charger Ready?? “. During the test: During the test you can see the following screen (sample data shown): Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 6 If you have programmed 4 cycles, after the 4th cycle the tester connects the charger to battery and does the charging. When reading the test result of this last cycle you see only charged Ah (A*h). To go back to the main menu press the START/STOP button. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 7 The test file on the pendrive is finished when the test finishes automatically OR when it is stopped by the user using the START/STOP button. Removing the pendrive or disconnecting the battery from the tester during the test will cause the loss of all test data. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com Web: www.bti-chargers.com...
  • Page 8: Technical Data

    REPAIRS • Repairs must only be carried out by qualified personel. • Only use parts supplied by BTI for repairs. Programming and specifications subject to change without notice. V2.0 – Feb 01 2024 © 2024 Brierly Technologies, Inc. Ph: 905.636.9865 Fax: 905.636.9879 E-Mail info@bti-chargers.com...

This manual is also suitable for:

Delta akku 12-25pdDelta akku 24-25pd

Table of Contents