Summary of Contents for Joyonway P68B123

  • Page 1 P68B123 SPA CONTROL SYSTEM V1.0...
  • Page 2 Revised version Version Revised content Revised by Revision date V1.0 New revision Sun Hydraulics (China) co.,Ltd. Dongguan Branch 2024/01/02...
  • Page 3: Table Of Contents

    Contents Warning 02~03 1、Product overview 2、Product dimensions 2.1、P68B123 Control System Dimensions and Installation Instruction 05~07 3、Basic Information 3.1、Wiring diagram 3.2、Power supply and load 09~15 3.3、Configure load 16~17 3.3.1、Configuring functions with Dip switch 18~26 3.3.2、Configuring functions with the control panel 3.3.3、Power configuration of the lamp 4、Replaceable parts...
  • Page 4 Cautious for electric shock! Please carefully read the following items before installation or connection. 1、Appliances must be permanently connected to fixed wiring. 2、Parts incorporating electrical components, except remote control devices, must be located or fixed so that they cannot fall into the bath. 3、The appliance must be supplied through a residual current device (RCD/GFCI) having a rated residual operating current not exceeding 30 mA.
  • Page 5 Maintenance Warning When repairing and replacing the heating wire, professional operation is required, be sure to use JOYON- WAY's certified O-rings to ensure that no O-rings are missed and installed to ensure that the heating tube is sealed and does not leak. As shown in the following figure: O ring After repairing and replacing the heating element, install the sealing parts back to place.
  • Page 6: 1、Product Overview

    1、Product overview Power input: 220-240V~ 32A 50Hz 380-415V 3N~ 22A 50Hz 120V~ 32A 60Hz Model: P68B123 240V~ 32A 60Hz 240V~ and 120V~ 32A 60Hz Output for one set of ON/OFF type or RGB type SPA light(+5V/2A or +12/1A) 1 set of single-speed pump (10.5A) 1 set of blower (10.5A)
  • Page 7: 2、Product Dimensions

    2、Product dimensions 2.1、P68B123 Control System Dimensions and Installation Instruction [14.96"] 380.00 mm Designs of P68B123 control system 100.00 mm [3.94"] Plumbing Plumbing [16.53"] 420.00 mm 128.00 mm [5.04"] [17.71"] 450.00 mm The distance between the product and obstacles should be above 20mm Minimum space reserved W: 140.00mm...
  • Page 8 Installation Instruction Installation Instruction Fixed installation P68B123 power cord connection The exposed copper wire cannot be scattered M6*30 X 4pcs screw X 4pcs M6 washer M6 spring X 4pcs gasket X 4pcs M6 nut 70mm PH2 cross Wrenches 10-12mm 3mm slotted...
  • Page 9 Installation Instruction Installation Instruction Wire installation P68B123 Power Cable Specifications 220 - 240V~ It is recommended to use - L BROWN Water 32A 50Hz Water 3 * 6mm² cable when the BLUE J2 - J3 J4 - J5 total load current is 32A...
  • Page 10: 3、Basic Information

    *2 USE PANEL TO SETUP THE LOAD 250V~/T10A CONFIGURATION WHEN A4▲. POWER LIMIT POWER NOT LIMIT *3 SWITCH A4 SHOULD BE SETTED T B1 P68B123 P68B TO OFF UPON FINAL BLOWER OUTPUT PUMP2 OUTPUT INSTALLATION A4▼. Wiring Diagram Wiring Diagram...
  • Page 11: Power Supply And Load

    3.2、Power supply and load POWER INPUT AND LOAD OUTPUT PAY ATTENTION TO THE DIFFERENT CONNECTIONS BETWEEN J1/J2/J3/J4/J5/J6/J7 IN EACH POWER TYPE. PUMP1(1 SPEED) * 4 PUMP1(2 SPEED) * 4 BLOWER POWER INPUT OZONE HEATER LIGHT CIRC PUMP PUMP1 (PUMP2) PUMP1(1 SPD) (HEATER PUMP) (HEATER PUMP) CN10...
  • Page 12 J6 - J7 220-240V~ 3.5A 220-240V~ 10.5A 220-240V~ 10.5A 220-240V~ 1A 220-240V~ 10.5A 220-240V~ 220-240V~ 10.5A J4-J5 J2-J3 J6-J7 CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23 T F M CN21M CN22 LIGHT CN20 CN19 S.T P .
  • Page 13 Load carried by L1 phase: PUMP1 / CIRC PUMP / BLOWER / OZONE / AUX Load carried by L2 phase: HEATER J1-J7 J4-J5 J2-J3 CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23 T F M CN21M...
  • Page 14 240V~ 10.5A 240V~ 3.5A 240V~ 10.5A 240V~ 10.5A 240V~ 1A 240V~ 10.5A 240V~ J4-J5 J2-J3 J6-J7 CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23 T F M CN21M CN22 LIGHT CN20 CN19 S.T P . S.T W...
  • Page 15 Load carried by N line: CIRC PUMP / OZONE Load carried by L2 line: PUMP1 / BLOWER / AUX / HEATER J1-J3 J6-J7 J4-J5 CN10 250V~/T10A T B1 P68B P68B123 Wiring Diagram Wiring Diagram 131482 CN23 T F M CN21M CN22 LIGHT...
  • Page 16 Load carried by N line: PUMP1 / CIRC PUMP / BLOWER / OZONE / AUX Load carried by L2 line: HEATER J1-J5 J2-J3 J6-J7 CN10 250V~/T10A T B1 P68B123 P68B123 Wiring Diagram Wiring Diagram CN23 T F M CN21M CN22...
  • Page 17 120V~ 10.5A 120V~ 3.5A 120V~ 10.5A 120V~ 1A 120V~ 10.5A 120V~ 10.5A 120V~ J4-J5 J2-J3 J6-J7 CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23 T F M CN21M CN22 LIGHT CN20 CN19 S.T P . S.T W...
  • Page 18: Configure Load

    Use the Dip switch for load configuration: set the Dip switch positions A1-A6 according to the Dip switch S1 configuration table on the control system PCB Dip switch CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23...
  • Page 19 HOST SYS: When there is only one SPA control pack, please set this pack as the main control system. SLAVE SYS: When set as a slave control system, it can form a multi-pack SPA control system with the main control system. POWER NOT LIMIT POWER LIMIT:...
  • Page 20: Configuring Functions With The Control Panel 18~26

    Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. PB562 Plus control panel Connection P68B123 control system Step 1: Connect the PB562 control panel to the P68B123 control system. Step 2: Turn the Dip switch A4 to ON.
  • Page 21 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Power ON Step 3: Power ON, the PB562 control panel will Step 4: Press the button " "...
  • Page 22 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Press the " " or " " buttons to select the item that needs to be changed, and then press the button "...
  • Page 23 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. PB563 Plus control panel Connection P68B123 control system Step 1: Connect the PB563 control panel to the P68B123 control system. Step 2: Turn the Dip switch A4 to ON.
  • Page 24 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Power ON Step 3: Power ON, the PB563 control panel will Step 4: Press the button“ “ to activate the function automatically turn on, and then operate on the menu, press the buttons”...
  • Page 25 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Use the " " or " " buttons to select the item that needs to be changed, and then press the button "...
  • Page 26 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. PB565 Plus control panel Connection P68B123 control system Step 1: Connect the PB565 control panel to the P68B123 control system. Step 2: Turn the Dip switch A4 to ON.
  • Page 27 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Power ON Step 3: Power ON, the PB565 control panel will Step 4: Find the " " icon in the menu interface and press automatically turn on, and then switch to the the icon to enter the Settings interface.
  • Page 28 Note: The operation of configuring functions using the control panel must be completed within 60 seconds after the control system being powered on. Swipe the screen to select. Press the icon or text to switch Function It cannot be configured here (Dip switch setting is required, reference 3.3.1) Jets 1 1 SPD Press...
  • Page 29: Power Configuration Of The Lamp

    3.3.3、Power configuration of the lamp The power configuration of the lamp is set according to the S2 configuration table on the PCB board of the control system. CN10 250V~/T10A T B1 P68B123 P68B Wiring Diagram Wiring Diagram 131482 CN23 T F M...
  • Page 30: Pb562/Pb562 Plus Control Panel Shortcut Buttons

    PB562/PB562 Plus control panel 2.4 inch TFT color display screen, 8 capacitive touch buttons. Confirm Used to activate the cursor in the function area, Screen reverse change the function status, or enter the function Used to reverse the display content upside down 180 degrees, and page;...
  • Page 31: Pb563/Pb563 Plus Control Panel Shortcut Buttons

    PB563/PB563 Plus control panel control panel 3.5 inch TFT color display screen, 10 capacitive touch buttons Pump 1 Navigation (Up) If pump 1 is a single speed pump, it is used to control the on/off of pump 1; If pump 1 Used to select functions upwards or adjust parameters is a dual speed pump, continuous button pressing can switch between low speed, high upwards in the menu interface.
  • Page 32: Pb565/Pb565 Plus Control Panel Main Interface

    PB565/PB565 Plus control panel control panel 5.0 inch TFT color display screen, screen touch operation The current time and status of the running Press to enter and display the current functions. system's time, voltage, and power. Screen reverse icon Used to reverse the display content upside down 180 degrees.

Table of Contents