Do you have a question about the PROQ 2 and is the answer not in the manual?
Questions and answers
Summary of Contents for GWS PROQ 2
Page 1
QUICK CHANGE 5 STAGE REVERSE OSMOSIS + ALKALINE WATER SYSTEM Installation Instructions Pure & Alkaline Water for a Healthier You GENERAL WATER SOLUTION California, USA www.gws-store.com support@gws-store.com...
DO NOT INSTALL THIS PRODUCT UNTIL YOU READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY, PROPERTY DAMAGE, OR PRODUCT FAILURE. Specifications Model PROQ 2 Stage 2QSF-25201 Sediment Filter Stage 2QGA-25202 Pre-carbon GAC Filter Replacement Filter Stage 2QCB-25203 Carbon Block Filter Stage 2QME-25250 RO Membrane Stage 2QPC-25258 Alkaline &...
Step 1 – Part List and Accessories Kit Parts List 1st Stage Stage System Cap x 1 Sediment Filter x 1 Pre-carbon GAC Filter x 1 Stage Stage Stage Post-carbon GAC Carbon Block Filter x 1 RO Membrane Filter x 1 &...
Step 2 - Required Tools Step 3 - Step Install PROQ 2 Filters Remove the dust cover from the filters and inspect each O-ring for any deformities. Install the filters in sequence according to the numbers on the RO system caps. (Figure 1) Twist and lock the filter from left to right.
Step 4 - Install the RO Faucet Note: If there is no hole in your kitchen sink or countertop, you will need to drill a 1/2" hole or use the hole for the soap dispenser. You may skip the drilling step if you intend on using the sprayer hole. Faucet Installation Overview Turn off the cold water supply valve and turn on the kitchen tap faucet until the water stops flowing to release the...
Figure 4 Figure 5 Step 5 - Install the Feed Water Adapter (Cold Water Only) Determine the Under Sink Compression Water Inlet Size You will find either a 1/2” or 3/8” OD compression inlet valve under your sink. 3/8” Compression Outlet 1/2”...
Note: If you have 1/2” water inlet valve, screw the 2 converters (1/2” FIP to 3/8” compression and 3/8” compression to 1/2” FIP) to the feed water adapter and then implement step 3. Connect the original faucet hose to the feed water adapter. Insert the orange tubing into the feed water adaptor and firmly pull on the tube to make sure it is secure.
Step 7 - Install the Drain Saddle Find a spot on the drain pipe to install the drain saddle. Note: It is recommended to install the drain saddle on the vertical drainpipe. Drill a 1/4" hole, making sure not to drill through to the other side of the pipe.
Step 8 - Connect Tubing to The Ports on the System Under Sink PROQ 2 Installation Overview Install the RO Faucet Tubing (Blue Tubing) Insert the blue tubing into the “FAUCET” port on the system. Pop the lock-in clip on the fitting to prevent water leaks.
Step 9 - Start up the System Ensure none of the tubings are kinked. Make sure the tank ball valve is in the closed position. Turn on the cold water supply valve and feed water adapter, make sure there are no leaks coming from the connectors or any components/valves at the points of connection.
We promise a risk-free shopping experience backed by our reliable customer service and technical support team. Please feel free to contact us with any questions or problems. GWS will be glad to assist you with any assembly, missing parts or questions that you may have about your product.
Page 13
QUICK CHANGE 5 STAGE REVERSE OSMOSIS + ALKALINE WATER SYSTEM GENERAL WATER SOLUTION California, USA www.gws-store.com support@gws-store.com...
Need help?
Do you have a question about the PROQ 2 and is the answer not in the manual?
Questions and answers