Download Print this page

Advertisement

Quick Links

Booster Kit: Thermo-Shield
assembly guide
version 221222
© 2022 HOMEBIOGAS
TG1B2/WKS221222
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Thermo-Shield and is the answer not in the manual?

Questions and answers

Summary of Contents for HOMEBIOGAS Thermo-Shield

  • Page 1 Booster Kit: Thermo-Shield assembly guide version 221222 © 2022 HOMEBIOGAS TG1B2/WKS221222...
  • Page 3 Thermo-Shield Dimensions: Frame & Cover: 3.0 x 2.0 x 1.4m Insulation Layer: 2.2 x 1.2m Ground Sheet: 3.6 x 2.4m...
  • Page 4 62cm pipe (frame) 31cm pipe (side brace) 55cm pipe (frame) 15cm pipe (side brace) pipe insert (side brace) orientation marking stickers Thermo-Shield Cover (transparent) ground sheet (black) sink velcro strip fertilizer pipe support strap duct tape strips zip-tie (for sink velcro)
  • Page 5 Assemble & install Thermo-Shield System not yet assembled Go to page 7 Select site (Refer Homebiogas User Manual) Place Groundsheet & Insulation sheets Install & activate system (Refer Homebiogas User Manual) Install Thermo-Regulator (If available. Refer Thermo-Regulator Manual) Assemble & install Thermo-Shield...
  • Page 6 The Groundsheet prevents growth of vegetation under the Thermo-Shield groundsheet U-stake...
  • Page 7 insulation sheet (3x 70cm, 6x 75cm) 75cm 75cm 70cm place 3x shorter (70cm) sheets in the same row tape strips...
  • Page 8 The Groundsheet prevents growth of vegetation under the Thermo-Shield Select site according to Homebiogas User Manual Insulation layer prevents heat loss to the ground Assemble system according to Homebiogas User Manual...
  • Page 9 First install Thermo-Regulator, if available, according to user manual provided short pipes (55cm) 5-way ‘star’...
  • Page 10 long pipes (62cm) x36 6-way ‘X’...
  • Page 11 (62cm) HomeBiogas logo facing outside...
  • Page 12 HomeBiogas logo facing outside 4x connectors in between side orientation marking stickers front back 3 connectors between each side sticker...
  • Page 13 5-way ‘star’...
  • Page 14 6-way ‘X’...
  • Page 15 long pipes (62cm) x4...
  • Page 17 6-way ‘X’ do not over-bend pipes - this can damage connectors...
  • Page 18 5-way ‘star’ do not over-bend pipes - this can damage connectors long pipes (62cm) x6...
  • Page 19 6-way connector long pipes (62cm)
  • Page 20 new fertilizer pipe (65cm) original fertilizer pipe new fertilizer pipe...
  • Page 21 ensure that the frame is centered around the system. sink velcro strip & zip-tie...
  • Page 22 fertilizer pipe support strap...
  • Page 23 Side braces help to secure the Thermo-Shield in place even in extreme weather conditions 4-way connector 15cm pipe pipe insert de ated gas tank: in ated gas tank: 30cm pipe 30cm pipe...
  • Page 24 Thermo-Shield Cover remove paper liners from cover front (sink)
  • Page 25 fertilizer pipe elbow...
  • Page 26 ensure cover seams are aligned with the frame below pull hard before fastening velcro - straps should be tight cover peg front (sink)
  • Page 28 © 2022 HOMEBIOGAS TG1B2/WKS221222...