ATESS Batt-Master Cabinet 9R Installation Manual

Dc cabinet

Advertisement

Quick Links

Shenzhen ATESS Power Technology Co.,Ltd
ADD: 1st Floor of Building 3 at Sector B and 3rd Floor of Building 9,
Henglong Industrial Park, No.4 Industrial Zone, Shuitian Community, Shiyan
Street, Baoan District, Shenzhen.
Simple installation manual
T: +86 755 2998 8492
of DC cabinet
F: +86 755 2998 5623
E: info@atesspower.com
W: www.atesspower.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the Batt-Master Cabinet 9R and is the answer not in the manual?

Questions and answers

Summary of Contents for ATESS Batt-Master Cabinet 9R

  • Page 1 Shenzhen ATESS Power Technology Co.,Ltd ADD: 1st Floor of Building 3 at Sector B and 3rd Floor of Building 9, Henglong Industrial Park, No.4 Industrial Zone, Shuitian Community, Shiyan Street, Baoan District, Shenzhen. Simple installation manual T: +86 755 2998 8492...
  • Page 2: Basic Components

    5. LCD 1. Basic components The DC cabinet mainly collects and distributes current to each battery cluster to Category Specification Number realize charge and discharge management function. The DC cabinet consists of 1 DC cabinet, 9 DC circuit breaker, copper bar, AC isolation transformer, MBMS, LCD, Size 7 inches isolation power module and wire, etc.
  • Page 3 9.DC cabinet installation 3) Connect from left to right to prevent misconnection and short-circuit. 9.1 DC cabinet power cable installation 1) Two positive and negative cables of 35 square meters are made respectively. One end of the cables is connected with PCS+/ PCS- of different battery cluster high- voltage boxes, and the other end of the cables is connected with the positive and negative connection inlet of the circuit breaker corresponding to the main cabinet.
  • Page 4 1) AC input wiring: according to the field AC voltage level, such as AC 400V, prepare Precautions: two AC cables, the input is connected to the AC400V-4-red and 0V-1-black end of When engaged in the assembly of energy storage system, they must wear labor the isolation transformer;...
  • Page 5 Use tools with insulated handles. positive/negative poles, models and line sequence; •Repair are to be performed only by qualified technical personal authorized by ATESS. The field wiring should be consistent with the factory wiring diagram. Check whether the cable of each interface is tight after installation;...