Safety Information Warning! • Use this product ONLY in accordance with these instructions and for its intended purpose, locking gates with automatic openers. Install and operate it only in full compliance with your gate’s separate instruction manual. Ensure the electrical supply is compatible with the rated voltage indicated on the control board of your gate.
Package List Receiver Main Body Padlock 2 Keys Zip Ties Operation Single Gate 1. Use your manual release key to allow the gate to move freely. Release Key Swing Door Opener...
Page 4
2. With the gate in its closed position, determine the best location for the lock and receiver. They must be level and aligned with the opener. If your gate opens inwards, the lock body should be mounted on the edge of the gate and the receiver should be mounted on the adjacent gate post.
Page 5
6. Secure the wiring from the lock to your gate opener’s control box. Underground wiring is recommended. Make all necessary connections to your gate’s circuit board and/or power supply in accordance with its separate manual. 7. Insert the pin through the holes in the receiver. Insert the padlock through the hole at the bottom of the pin to secure it and hold it in place.
Page 6
3. Use the provided zip ties to hold the lock body in the approximate mounting position. (The lock body will be moved to its exact position later.) 4. Find a location on the gate post that is level with the lock body and tie the receiver so that its holes align with the slot on the lock body.
Maintenance • Check the condition of this product at least once a month and immediately if any irregularity is noticed. Tighten, repair, or replace any loose, worn, or damaged components before further use. • The exterior of this product can be cleaned with a soft, damp cloth. Do not use abrasive cleaners or caustic chemicals.
Need help?
Do you have a question about the AGO-DS00-0Z and is the answer not in the manual?
Questions and answers