WATTCH INSTALLATION GUIDE
MODEL: WDAS -L1
VERSION 2.1 | SEPT. 8, 2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wattch WDAS -L1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Electric AVENUE Wattch WDAS -L1

  • Page 1 WATTCH INSTALLATION GUIDE MODEL: WDAS -L1 VERSION 2.1 | SEPT. 8, 2023...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS Getting Started....................Mounting..........................Conduit............................ Power and Measurement................... Voltage............................. Neutral Requirement......................Current Transformers (CTs)....................Paralleling CTs........................Devices........................Antennas..........................Ethernet........................... RS485 Devices........................RS485 Shield Drain......................Conduit........................... Final Checklist...................... Checkouts..........................Power Up..........................BOX CONTENTS A materials bag containing: PLEASE NOTE: Two antennas CTs may be required based on your Mounting hardware...
  • Page 3: Getting Started

    If mounted outside, ingress conduit only from the bottom of the enclosure to prevent water ingress as well as issues from condensation Pot the conduit penetrations according to your typical guidelines in order to prevent water and moisture ingress NEED ASSISTANCE? Electric Avenue Technical Support: 1-888-353-2283 support@goelectricave.com...
  • Page 4: Power And Measurement

    POWER AND MEASUREMENT...
  • Page 5: Voltage

    CURRENT TRANSFORMERS (CTS) The WDAS-L1 only supports 333mV CTs. If you are using CTs not provided by Electric Avenue and have any questions, please contact support@goelectricave.com to determine compatibility. The Source arrow of the CTs should face towards the electrical service...
  • Page 6: Paralleling Cts

    Ethernet switch in the L1 in order to connect these. Electric Avenue does not provide the switch by default with the L1 so you will need to source a switch that can be powered with 24V.
  • Page 7: Rs485 Devices

    The shield should not be connected to any other devices, as this can cause ground loops or other undesirable behavior. CONDUIT To protect the RS-485 bus, any outside cable runs should be protected by earthed conduit according to local codes. NEED ASSISTANCE? Electric Avenue Technical Support: 1-888-353-2283 support@goelectricave.com...
  • Page 8: Final Checklist

    FINAL CHECKLIST CHECKOUTS 1. Connected all system voltage phases in the right order 2. Connected the CTs and verify their mappings to their respective phases 3. Confirm the internal Ethernet cable to the Digi modem from the Strato Pi/WEC 4. Check Antennas 5.