Do you have a question about the JDEM 100 and is the answer not in the manual?
Questions and answers
Summary of Contents for H2OPro JDEM 100
Page 1
JDEM 100 User Manual Do not connect the jug with water inside to the base up to point 4. (Final step), always make sure that the base is connected to the Tower or has the appropriate cap inserted in the fitting.
Page 2
JDEM 100 User Manual 4. Final step Place the JUG onto the base using both the guiding and From this point you can fill the Jug. Look carefully at the image. the water output valve. Jug handle Base connectcor 5. Filter status Test the performance and the state of the filter by using the supplied TESTER, housed in the handle.
Page 3
3. Montaggio base STEP 1. STEP 2. In caso di collegamento della base JDEM 100 al Inserire uno dei due tipi di raccordi compresi nel kit, Tower, spingere l’anello di raccordo e togliere il avendo cura di inserirlo dal lato senza scanalature.
Page 4
JDEM 100 Manuale Utente 4. Passaggio finale Posizionare la caraffa sulla base utilizzando sia la guida che la Da questo punto in poi è possibile riempire la caraffa Osserva attentamente l’immagine. valvola di uscita dell’acqua. Manico caraffa Raccordo base 5. Controllo filtro Testare le prestazioni e lo stato del filtro utilizzando il TESTER in dotazione, alloggiato nell’impugnatura.
Need help?
Do you have a question about the JDEM 100 and is the answer not in the manual?
Questions and answers