Summary of Contents for Sieyuan swatten SiH-3.6kW-SL
Page 1
User Manual SiH-(3.6kW-6kW)-SL Shanghai Sieyuan Watten Technology Co., Ltd. www.swatten.com Powered by Sieyuan Electric Co., Ltd.
Page 2
All Rights Reserved All Rights Reserved No part of this document can be reproduced in any form or by any means without the prior written permission of Shanghai Sieyuan Watten Technology Co., Ltd.(hereinafter "Swatten"). Trademarks Swatten and other Swatten trademarks used in this manual are owned by Swatten.
Page 3
Swatten without written authorization. The contents of this manual may be periodically updated or revised, and the specifications of the actual product purchased should take precedence. Issue 1 (2023-07-10) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 4
Changes b etween document issues are cumulative, meaning that each subsequent document issue includes all the changes made in earlier issues. Issue 1 (2023-07-10) This issue is the first official release. Issue 1 (2023-07-10) Shanghai Sieyuan Watten Technology Co., Ltd.
Additionally, compare the contents of the packaging with the ordered product to ensure consistency. If there are problems with the above inspection items, do not install the device and contact your distributor first. If the problem persists, contact Swatten for further assistance. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Batteries deliver electrical power and can cause burns or fire hazards when short-circuited or incorrectly installed. Lethal voltages are present at the battery terminals and cables connected to the inverter. Avoid touching the cables and terminals to prevent severe injuries or death. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Touching the power grid or the contact points and terminals on the inverter connected to the power grid can result in electric shock! The power grid side may have voltage. Always use a standard voltmeter to ensure there is no voltage before touching. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Failure to do so may result in losses that are not covered by the warranty. 1.6 Disposal Safety WARNING Please dispose of the product in accordance with the applicable local regulations and standards to prevent property losses or injuries Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
The model description is follows (take SiH-6kW-SH as an example): SiH: Swatten Hybrid inverter 6kW: Power level SL: Single phase, Low voltage Appearance The image shown here is for reference only. The actual product received may differ. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 13
Hanger Used to hang the inverter on the wall-mounting bracket. Dimensions The following figure shows the dimensions of the inverter. figure 2-2 Dimensions of the Inverter Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
There is a deadly high pressure danger! Only professional and qualified personnel are allowed to install and operate! RoHS mark of conformity. Regulatory compliance mark. UKCA mark of conformity. CE mark of conformity. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
In the event of no user activity for 5 minutes, the display screen will automatically turn off to conserve power. Users can reactivate the display screen by simply touching the LED indicator. The following chart description of the LED indicator LED color State Definition Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
2.6 PV Energy Storage System (PV ESS) 2.6.1 PV Energy Storage System (PV ESS) The following figure shows inverter application in a PV energy storage system. figure 2-4 PV Energy Storage System Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Do not connect loads that require a stable energy supply for reliable operation. Do not connect loads whose total capacity exceeds the maximum EPS capacity. Do not connect loads that may cause high start-up current surges, such as air conditioners, high-power Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Battery Discharge: With available energy, the battery will discharge to provide power for the loads. It acts as the primary source of power during this time. Grid Power Supply: If the discharge power of the battery is insufficient to meet the load requirements, the Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 19
With current No current During night, when the battery is empty, it will enter into standby mode. In this case, the grid will supply all power for loads. With current No current Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
If the voltage level deviates from the defined operational levels, the inverter will disconnect from the grid Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
This value can be configured as the Import Power Limit, which can be conveniently adjusted using the SOLARMAN Smart App. 3.4 Battery Management Please find out more in the LV Battery Management files. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
When unpacking the product, exercise caution to avoid causing any damage, especially if using tools. Take care to handle the product with care and ensure that no unintentional harm is inflicted upon it. 4.2 Scope of Delivery Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
To ensure the safekeeping of the inverter and maintain warranty coverage, please adhere to the storage guidelines provided. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Install the inverter in a location that allows for easy electrical connection, operation, and maintenance. This will facilitate access to the inverter for any necessary maintenance or troubleshooting tasks. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
The mounting structure for the inverter must adhere to local/national standards and guidelines. The installation surface should be sufficiently sturdy to support four times the weight of the inverter and be suitable for its Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Allow ample clearance around the inverter to ensure proper heat dissipation. Install the inverter at a suitable height for convenient viewing of the LED indicator and easy access to the operating switch(es). Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Avoid placing the inverter directly on a hard surface, as it may damage the metal enclosure. Instead, use protective materials such as a sponge pad or foam cushion underneath the inverter. When moving the inverter, hold it by the designated handles and avoid gripping the terminals for transportation. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Use a hammer drill with a 10mm diameter drill bit to drill holes into the wall to a depth of 80mm. Step 3 Insert the expansion bolts into the drilled holes and secure the mounting plate firmly against the wall. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 29
Check the level of the mounting bracket and make adjustments as necessary until the bubble in the level is positioned in the middle. Ensure that the holes drilled into the wall have a depth of approximately 70mm. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
The cable colors shown in the figures in this manual are for reference only. Select cables according to the local cable standards. 6.2 Terminal Description All electrical terminals are located at the bottom of the inverter. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 31
BAT-COM port is used for communication BAT-COM between battery and inverter and communication between energy meter and inverter. Communication connection allowing you to view the real-time status of the inverter and modify Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
The same as that of the PE wire in the AC Grounding cable wire cable cable In case local regulations impose specific requirements for cables, follow the cable specifications mandated by Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Note 5: The AC port takes power from the grid and is set according to the grid circuit breaker. For other countries For other countries with grid systems that do not have specific requirements for wiring connections, the Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 34
In the TT system, : The diagram provided is an example for grid systems in the TT system. Please ensure compliance with local regulations and guidelines for wiring connections in your specific location. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
The inverter does not have a transformer, so neither the negative nor positive electrode of the PV string can be grounded. Grounding these electrodes will result in abnormal operation of the inverter. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Please note that the external grounding cable needs to be prepared by the customers. Step 1: Prepare the cable and OT/DT terminal. (1) Heat shrink tubing (2) OT/DT terminal Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
However if an external residual current device (RCD) (type A is recommended) is mandatory, the switch must be triggered at a residual current of 300 mA (recommended). RCD of other specifications can also be used according to local standard. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
6.7 Sieyuan Energy Meter Connection WARNING wires from the Sieyuan energy meter must be connected to the GRID port in a one-to-one correspondence. Failure to adhere to this wiring arrangement may result in improper functioning or permanent damage to the machine. Swatten holds no responsibility for any damage caused to the machine due to this...
Page 39
Wiring must be correct!!! 1. The power lines should be connected to the electricity meter in a one-to-one corresponding order and must not be connected incorrectly. 2.Sieyuan Energy Meter' pin21 connect to BAT-COM' Pin6. Meter' pin22 connect to BAT-COM' Pin5. Issue 1 (2024-03-01)
The PV strings to two DC input areas may differ from each other, including PV module type, number of PV modules in each string, angle of tilt, and installation orientation. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Step 2: Assembling the Crimp contact and cable, use the crimping pliers to securely assemble the cable ends. Step 3: Lead the cable through the cable gland and insert the crimp contact into the insulator until it audibly Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
2 Check the cable connection of the PV string for polarity correctness and ensure that the open circuit voltage in any case does not exceed the inverter input limit of 600V. step 3 Connect the PV connectors to corresponding terminals until there is an audible click. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
A two-pole DC circuit breaker with overcurrent protection (voltage rating not less than 100 V and current rating not less than 110 A) should be installed between the inverter and the battery. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
6.9 Communication Connection 6.9.1 BAT-COM Connection NOTICE BAT-COM port is used for communication between battery and inverter, and communication between Sieyuan Energy Meter and inverter, BAT-COM must be install corectly.(Pin1-Pin6 must be installed, Pin7&Pin8 are not mandatory.) Step 1 Strip the insulation from each cable and install the terminals.
Page 45
Pin2 connects to the battery CAN_L, Pin3&Pin4 are connected to the battery 12V interface positive and negative (some batteries need to be connected to the 12V power supply, see the battery manual); Pin5&Pin6 are connected to the Sieyuan meter Pin21&Pin22. Pin7&Pin8 use for DO or Backup-RS485 (depending on the model).
SiH-(3.6kW-6kW)-SL User Manual 6 Electrical Connection 6.9.2 Sieyuan Energy Meter Communication Connection Please refer to chapters 6.7 and 6.9.1 for details 6.9.3 Battery Communication Connection Pin5&Pin6 of the COM port can also be used for the CAN communication of the inverter and the battery.The function is the same as Pin1&Pin2 of BAT-COM, just choose one of the two.
Sink reactive power if capable DRM 8 Increase power generation (subject to constraints from other active DRMs) Step 1: The network cable for DRM-COM follows the specifications outlined in the provided diagram. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
7.3 Download App If you are a residential user, please scan the QR code provided below to download the SOLARMAN Smart app. Alternatively, you can visit the website https://home.solarmanpv.com to access the app. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Click on "Sign up" and create your account here. Please note that use an email address to register for an account. 7.5 Create a Plant Click "Add Now" to create your solar installation. Please provide the necessary information about your solar plant, including basic details and any additional relevant information. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
You can locate the logger serial number on the external packaging or on the body of the logger itself. 7.7 Network Configuration Step 1: Click on "Go to Configure" to access the network settings. (Ensure that Bluetooth and WiFi are turned ON.) Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 51
Warning: Before leaving the site, it is crucial to ensure that the stick logger is functioning correctly. If you notice any abnormal behavior or issues, please refrain from leaving the site and immediately contact customer service. You can reach customer service at the following number: 400-181-0512 Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
2. Inverter does not 2. Check inverter s communication match with stick rate to see if it matches with stick logger s logger s. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 53
1. Exit automatically after 1mins. 2. Long press Reset button for 5s, Fast Restore factory Normal reboot stick logger. state state flash settings 3. Long press Reset button for 10s, restore factory settings. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
8.1.3 Disposal of the Inverter Users are solely responsible for the proper disposal of the inverter. WARNING Please ensure that the inverter is disposed of in accordance with the relevant local regulations and standards to Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Swatten does not assume liability for the disposal of the battery. The responsibility for proper battery disposal rests with the user. Please ensure that the battery is disposed of in accordance with applicable local regulations and standards to avoid any property damage or harm. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
2. Disconnect the AC and DC switches, and if there is a battery, disconnect the battery-side switch. After 10 minutes, turn off the AC and DC switches in System Fault rotation and restart the system. 3. If the fault still persists, please contact Swatten. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 57
Check if the inverter is placed in a well-ventilated area. Check if the inverter is exposed to direct sunlight. If so, avoid direct sunlight. Check if the fan is operating properly. If not, replace the fan. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 58
Swatten. 3. If the fault still persists, please contact Swatten. Please perform the appropriate checks and maintenance procedures based on the specific situation, and if necessary, contact the relevant manufacturers or Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 59
Handling the PCB (Printed Circuit Board) or other components sensitive to static electricity can lead to device damage. Avoid unnecessary contact with the circuit board. Adhere to regulations for protecting against electrostatic discharge and use an anti-static wrist strap. 9.2.2 Routine Maintenance Item Method Period Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 60
- Check any abnormal noise during General status of the system the operation. Every 6 months - Check each operation parameter. Be sure that nothing covers the heat sink of the inverter. Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 61
Power factor at Rated 0.99 power Adjustable power factor 0.8 leading to 0.8 lagging AC Type L/N/PE Efficiency Max. efficiency 97.50% 97.70% 97.70% European efficiency 97.00% 97.30% 97.30% Protection & Function LVRT Grid monitoring Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 62
AC connection type Screws & Fasteners Screws & Fasteners Screws & Fasteners EPS Data off-grid mode Rated voltage 220V/230V/240V(±2%) Frequency range 50Hz(±0.5%) Total hamonic factor output voltage Switch time to emergency mode Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.
Page 63
SiH-(3.6kW-6kW)-SL User Manual 10 Appendix Rated output power 5000 W /5000 VA 5000 W /5000 VA 6000 W /6000 VA 8400 VA,10s 8400 VA,10s 8400 VA,10s Peak output power Issue 1 (2024-03-01) Shanghai Sieyuan Watten Technology Co., Ltd.