GE ASH06LL - 6000 BTU Air Conditioner Owner's Manual & Installation Instructions page 12

Owners manual
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
[] PREPARE AIR CONDITIONER
(CONT.)
[]
Insert
the frames
of the accordion
panels
into the top and bottom
mounting
rails.
Attach
the accordion
panels
to the side
of the case using
6 type A screws,
Top mounting
Accordion
panels
[] INSTALL AIR CONDITIONER
IN
WINDOW
[]
Cut the window
sash seal to the window
width
and stick the adhesive
side to the
bottom
of the sash.
--Window
sash seal
[]
Place the air conditioner
on the sill
with
the bottom
mounting
rail against
its back edge.
Center
it and close the
window
securely
behind
the top mounting
rail. It should
be level
or slightly
tilted
to the outside.
Use a level; about
a 1/3
bubble
will
be the correct
case slant to
the outside.
12
[] INSTALL AIR CONDITIONER
IN
WINDOW
(CONT.)
[]
Extend
the left and right
accordion
panels
to the vertical
window
sashes
and
attach
with
4 type
B screws.
Type B
screws
Type B
screws
[]
Attach
the brackets
to the sill on both
sides
using
two type
B screws.
[]
Tighten
the screws
to secure
the brackets
in place
on each side of the air conditioner.
[] INSTALL SECURITY
BRACKET
AND FOAM TOP WINDOW
GASKET
[]
Attach
a security
bracket
with
a type
B
screw.
[]
Cut the foam
top window
gasket
to the
window
width.
[]
Stuff the foam
between
the glass and the
window
to prevent
air and insects
from
getting
into the room.
/
Caulk or weather-strip
any gaps or
openings
to the outside
to seal the
installation.
The installation
is now
complete,

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asr05Arh06

Table of Contents