Hide thumbs Also See for HEATFORCE DC:

Advertisement

HEATFORCE DC
HEATFORCE DC BOOST
MODELS: HEA2W and HEA2W-B
Please read all instructions before commencing installation.
IMPORTANT
This integrated bathroom heat-fan-light unit must be installed
by a registered electrician and its installation and connection to
the power supply must comply with all current Australian and
New Zealand electrical and building regulations including
AS/NZS3000, or latest edition thereof.
The power supply cable must be suitably rated by a registered
electrician to satisfy the total load on that circuit.
READ AND SAVE THESE INSTRUCTIONS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HEATFORCE DC and is the answer not in the manual?

Questions and answers

Summary of Contents for Ventair HEATFORCE DC

  • Page 1 HEATFORCE DC HEATFORCE DC BOOST MODELS: HEA2W and HEA2W-B Please read all instructions before commencing installation. IMPORTANT This integrated bathroom heat-fan-light unit must be installed by a registered electrician and its installation and connection to the power supply must comply with all current Australian and New Zealand electrical and building regulations including AS/NZS3000, or latest edition thereof.
  • Page 2 INSTALLATION INSTRUCTIONS OPTIONAL FUNCTION SETTINGS This Ventair Heatforce 3 in 1 includes additional functions that can be engaged by moving the toggle switch located on the back of the unit. PLEASE NOTE: For activation of '24/7 Continuous' or '10min Run On' functions, the toggle switch should be set prior to connecting the power supply.
  • Page 3: For Your Safety

    INSTALLATION INSTRUCTIONS FOR YOUR SAFETY Use this heat-fan-light unit only as described in this manual. Any other use not recommended by the manufacturer may cause fire, electric shock, or injury to persons. If you have questions, contact the manufacturer or local agent. To prevent electrical shock, please ensure that power is DISCONNECTED before installing.
  • Page 4: Ventilation Requirements

    This unit must be mounted at least 250mm away from vertical walls. Additionally a minimum of 50mm clearance is required between any part of the Heatforce DC and Joists, walls insulation and/or overhead building material. Do Not Cover: The Unit must not be covered with building insulation or similar.
  • Page 5 INSTALLATION INSTRUCTIONS INSTALLATION/MOUNTING: 1. This unit must be mounted at least 2.3 meters above the floor and at least 250mm away from vertical walls. 2. Ensure the area behind the installation location is clear of all cables, pipes, joists or hidden utilities. 3.
  • Page 6 INSTALLATION INSTRUCTIONS 6. Remove all heat lamps and unclip springs to release fascia. 7. Carefully disconnect the LED connector from the heater. 8. Remove the terminal cover and connect all wires as per the ‘CONNECTION TO ELECTRIC MAINS' section on page 8. READ AND SAVE THESE INSTRUCTIONS...
  • Page 7 INSTALLATION INSTRUCTIONS 9. Connect ducting (if required) and gently insert the unit into the pre-cut hole ensuring to move the side clamping arms inwards so that the body can pass through the hole without damaging the plasterboard. To maximize airflow, cut the duct to size ensuring it is in a fully expanded state with minimal bends or corners.
  • Page 8: Connection To Electric Mains

    INSTALLATION INSTRUCTIONS CONNECTION TO ELECTRIC MAINS 1. Ensure the power is switched "OFF" at the mains before commencing installation. 2. Remove the terminal cover and make all connections as per the "Electrical Diagram" and markings adjacent to terminal block. 3. Refit cover removed earlier. ELECTRICAL DIAGRAM: NOTE: A hard, unswitched active to the L terminal of the unit is required.
  • Page 9: Care And Maintenance

    INSTALLATION INSTRUCTIONS HOW TO CHANGE LED LIGHT COLOUR: Using a Standard 3 Gang Wall Control 1. Flick light switch to 'ON' - LED light will be at Natural 4000K white (Factory Default setting). 2. While 'ON', flick light switch to 'OFF'' then 'ON' again within 8 seconds - LED light will change to Warm 3000K white.
  • Page 10 INSTALLATION INSTRUCTIONS AIRFLOW AND PRESSURE PERFORMANCE DATA HEA2W 24/7 continuous. HEA2W-B 24/7 continuous. READ AND SAVE THESE INSTRUCTIONS...
  • Page 11 INSTALLATION INSTRUCTIONS DIMENSIONS 380mm 21mm 443mm READ AND SAVE THESE INSTRUCTIONS...
  • Page 12: Main Technical Parameters

    853 lumens (Avg) 853 lumens (Avg) Heat Lamps 275 Watt 275 Watt Instructions are subject to change without notice. Ventair Pty Ltd 4 Capital Place, Carrum Downs, VIC, 3201, Australia e: info@ventair.com.au I w: www.ventair.com.au READ AND SAVE THESE INSTRUCTIONS...

This manual is also suitable for:

Heatforce dc boostHea2wHea2w-b

Table of Contents