Apollo OMBRA Installation Manual

External awnings

Advertisement

Quick Links

OMBRA EXTERNAL AWNINGS
Installation Guide
Straight Drop
1800 007 321
apollopatios.com.au

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OMBRA and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Apollo OMBRA

  • Page 1 OMBRA EXTERNAL AWNINGS Installation Guide Straight Drop 1800 007 321 apollopatios.com.au...
  • Page 2: Table Of Contents

    ........................16 DISCLAIMER INTRODUCTION This Installation manual for OMBRA | Straight Drop has been produced by Apollo Patios to supply the necessary information for the safe and correct installation of OMBRA | Straight Drop. DISCLAIMER Apollo Patios has used reasonable care in preparing the information included in this document, but makes no representations or warranties as to the completeness or accuracy of the information.
  • Page 3: Section A | Tools And Additional Items Required

    Mallet • Scissors ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED) To install a OMBRA | Straight Drop, the following non-stocked items are required: • Fixings for Box/Open Brackets/Hardware (ensure appropriate fixings are used to suit application) • Trims to conceal packing (if required)
  • Page 4: Blind Items Required

    Section A | Tools and Additional Items Required SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED BLIND ITEMS REQUIRED BOX (FULL OR SEMI) COVER Fascia Bracket (RE03-0101-xxx000) may be required as a centre support for larger spans NOTE: Store clip until required (can be left in adaptor as shown) COVER (FULL OR SEMI) NOTE: Store clip until required (can be left in adaptor as shown)
  • Page 5 Section B | Installation Guide SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED BLIND STRAP DOWN HARDWARE...
  • Page 6: Section B | Installation

    Section B | Installation Guide SECTION B | INSTALLATION PART A – PREPARING INSTALLATION SPACE STEP 1. - CHECK FOR OBSTRUCTIONS Check for any obstructions that may interfere in installation. BLIND WIDTH = W2 STEP 2. - CHECK VERTICAL & HORIZONTAL INSTALLATION DIMENSIONS VERTICAL DIMENSIONS Check if top of installation space is level.
  • Page 7: Part B - Box Installation

    Section B | Installation Guide SECTION B | INSTALLATION PART B – BOX INSTALLATION STEP 1 – INSTALL BOX TO WALL/CEILING FACE FIX Note: Use appropriate fixings to suit application. Ensure Box is Aligned and Level. TOP FIX Note: Use appropriate fixings to suit application. Ensure Box is Aligned and Level. SIDE FIX Note: Use appropriate fixings to suit application.
  • Page 8: Part C - Cover Installation

    Section B | Installation Guide SECTION B | INSTALLATION PART C – COVER INSTALLATION STEP 1 – INSTALL END PLATES TO WALL/CEILING USING APPROPRIATE FIXINGS TO SUIT APPLICATION FACE FIX Fascia Bracket (RE03-0101-xxx000) may be required as a centre support for larger spans Note: 1.
  • Page 9: Part D - Open Bracket Installation

    Section B | Installation Guide SECTION B | INSTALLATION PART D – OPEN BRACKET INSTALLATION STEP 1 – INSTALL BRACKETS TO WALL/CEILING USING APPROPRIATE FIXINGS TO SUIT APPLICATION FACE FIX Note: 1. Use appropriate fixings to suit application. 2. Ensure brackets are Aligned and Level. 3. Measure brackets end to end to confirm measurement is correct TOP FIX Note: 1.
  • Page 10: Part E - Blind Installation

    Section B | Installation Guide SECTION B | INSTALLATION PART E – BLIND INSTALLATION STEP 1 – INSERT BLIND INTO BOX User effort will be required to push the booster head/Idler pin into the adapter, a noticeable “click” will indicate that the component is correctly located. STEP 2 –...
  • Page 11 Section B | Installation Guide SECTION B | INSTALLATION STEP 3 – UNLOCK PRE-TENSION HEAD AT SPRING END (FOR SPRING ONLY) STEP 4 – FEED THROUGH MOTOR CABLE (FOR MOTOR ONLY) STEP 5 – RUN BLIND DOWN + CENTRE Page. 11 VEUE Straight Drop Installation Manual | March 2019 2019 ©Copyright All Rights Reserved Rollease Acmeda...
  • Page 12 Section B | Installation Guide SECTION B | INSTALLATION STEP 6 – TEST BLIND OPERATION For spring operation, blind should creep up slowly when pulled down. If blind does not creep up, add more pre-turns. Refer steps 7 - 10 For motor operation, ensure wiring is correct and motor is operating correctly.
  • Page 13: Part F - Attach Clip/Strap

    Section B | Installation Guide SECTION B | INSTALLATION PART F – ATTACH CLIP/STRAP OPTION 1 - CLIP STEP 1 – MARK OUT POSITION OF SADDLES (SUGGESTED 100MM NOMINAL FROM END CAP), FIX WITH APPROPRIATE SCREWS STEP 2 – ATTACH CLIP IN CORRECT ORIENTATION...
  • Page 14 Section B | Installation Guide SECTION B | INSTALLATION OPTION 2 - STRAP STEP 1 – MARK OUT POSITIONING OF SADDLES (SUGGESTED 100MM FROM END CAP), FIX WITH APPROPRIATE SCREWS STEP 2 – ATTACH STRAP NOTE: Ensure straps are adjusted so that the weight bar is level...
  • Page 15: Part G - Insert Box / Cover

    Section B | Installation Guide SECTION B | INSTALLATION PART G – INSERT BOX / COVER STEP 1 – MARK OUT POSITIONING OF SADDLES (SUGGESTED 100MM FROM END CAP), FIX WITH APPROPRIATE SCREWS STEP 2 – SECURE COVER AT BOTH ENDS Note: It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged...
  • Page 16: Installed Straight Drop

    Section B | Installation Guide SECTION B | INSTALLATION INSTALLED STRAIGHT DROP OPEN...
  • Page 17 Section B | Installation Guide SECTION B | INSTALLATION PROBLEM CAUSE SOLUTION Ripples along sides of fabric This occurrence is inherent to roller systems and is more Blind rolled up for an extended period prevalent in some fabrics. Leave blind down for 1 – 4 hours; of time most ripples should disappear.
  • Page 18 Notes |...
  • Page 19 Notes |...
  • Page 20 OMBRA EXTERNAL AWNINGS 1800 007 321 apollopatios.com.au...

Table of Contents