Qualification of Staff ..................4 Additional Documents ................... 4 Functional Description of ETL DataView ..........5 How will ETL DataView be used? ..............5 What you need to take care of! ..............5 The Navigation....................5 Layout of the User Interface ................. 5 3.4.1...
Used Symbols WARNING Information to prevent extensive material and ecological damage. PRECAUTION Information on handling and usage. Disregard may lead to malfunctioning or marginal material damage. Information to prevent extensive material and ecological damage. ETL DataView 3 Quickstart Guide Version 3.22.52...
Additional Documents For operating the device also the manual Automatic Test System ATS400 Instruction Manual Base device is neccessary. ETL DataView 3 Quickstart Guide Version 3.22.52...
This manual is for ETL DataView version 3.22.52. How will ETL DataView be used? The software ETL DataView is either installed on your test system (X4, X5, X6, X8) or must be installed on your PC (eg. For remote controlling the X2 variant). You will find the necessary information in the detailed instruction.
The main area changes depending on the chosen menu. The operating philosophy will be common to a theme and allows a save usage. The Main Menu After turning on the system rsp. starting ETL DataView, will be Main menu displayed. ETL DataView 3 Quickstart Guide Version 3.22.52...
Create / Edit can be changed, copied or deleted. Using the button a manual device check with a test dummy can be Dummytest started. ETL DataView 3 Quickstart Guide Version 3.22.52...
Start. Each signal can have one of four states. Active: The signal must be set that a start can occur. active: The signal must not be set that a start can occur. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 9
For the overall result the step is Skip estimated as passed. allows the test personal to start the test. Start Choosing both buttons will be displayed. Start and Skip ETL DataView 3 Quickstart Guide Version 3.22.52...
Use the button Edit. The window to configurate the protective leads test will be shown. Mostly, the default values fit the case of application. If necessary, modify the values. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 11
Advance to tab page Start. The dialog will be shown. Start Configure the settings so that the status of and of all others PE-Testprobe Active Ignore. Set the time in to 0.0. Delay ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 12
The background colour changes to yellow. During the test, the current measurements are shown. The progress bar visualizes the test time. Test in is shown as status. operation... ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 13
You can exit the window in two ways. With the button you will reach the Menu Main menu. With the button you will reach the menu individual. From there you can Back Test reach the as well. Main menu ETL DataView 3 Quickstart Guide Version 3.22.52...
Press the button plan. You get to the menu plan. Here, press the button Test Test Edit. The window will be opened. Create / Create / Edit No test plans will be shown yet. ETL DataView 3 Quickstart Guide Version 3.22.52...
The test steps will be added in the order they will be used later. Every new and pasted test step will be added after the selected test step. The test plan will be executed top down. ETL DataView 3 Quickstart Guide Version 3.22.52...
Switch-on and –off time is not part of the testing time. I: Test current [A]. U: Maximum test voltage [V]. This test voltage will not be exceeded if the resistance of the test object is too high. ETL DataView 3 Quickstart Guide Version 3.22.52...
In an overview of a test step you can find the parameters, the starting conditions and further settings. 5.2.2 Configuring High Voltage Testing Press Add, select and confirm with Ok. HV-AC...High voltage AC ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 18
Off, Coarse, bigger sparks are detected, if you select Normal, the sensitivity is medium and if you select even smallest sparks are detected. Feine Change the values so they fit your test object. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 19
Test: Testing time in seconds. Duration which the voltage is applied to the test object. It is the same value as t in the configuration view. Down: Time in seconds from test voltage to 0 volt. ETL DataView 3 Quickstart Guide Version 3.22.52...
The test step was Create / Edit added and an overview of the test step will be shown. 5.2.3 Configuring Insulation test Press the button Add, select and confirm with Ok. ISO..Insulation ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 21
Change the values so they fit your test object. If necessary you can create a ramp by pressing the Ramp-button. This is the same dialog as in Fehler! Verweisquelle konnte nicht gefunden werden.. ETL DataView 3 Quickstart Guide Version 3.22.52...
Press Close. Again, the window will be shown. The test step was Create / Edit added and an overview will be shown. 5.2.4 Configuring Function Testing Press Add, select and confirm with Ok. FCT-I... FCT-Current ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 23
U max Start Graphic: Here you can select whether a graphic should be shown during the function test or not, and whether it should be saved or not. In case you select None, ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 24
Otherwise the test will be Timeout declared a failure. Change the values so they fit your test object. Advance to tab page Start. The configuration page for the starting conditions will be shown. ETL DataView 3 Quickstart Guide Version 3.22.52...
Press Close. The window with the overview of the test plans will be shown. On the left, a list of all test plans will be shown. If you select a plan, you can see the test steps at the top in the middle. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 26
If you select a test step in this control element, a summary of the test step will be displayed at the lower center. Confirm the button to come back to the Menu Main menu. ETL DataView 3 Quickstart Guide Version 3.22.52...
In the new menu click on Test Select manual. A list of the test plans will be shown. Select the test plan 203123. At the top in the middle, a list of all test steps will be shown. ETL DataView 3 Quickstart Guide Version 3.22.52...
Mount the test object in the test cage and contact it. Start the test by pressing the start-button on the PE-Testprobe. The test will be started. Resistance, test current and test time will be displayed. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 29
The test stops and waits for the safety circuit to be closed. Lay the PE-Testprobe into the tray and close the test cage. Afterwards, the remaining tests will be performed. During the high voltage test, current, test voltage and test time are displayed. ETL DataView 3 Quickstart Guide Version 3.22.52...
Page 30
After the insulation test, the test step is colour-coded according to its result. You can find the value of the result in the second column. The function test will be started. During the function test, current, supply voltage and test time are displayed. ETL DataView 3 Quickstart Guide Version 3.22.52...
Exiting DataView To exit DataView go to the menu. Press on Workstation, and subsequently on Main DataView. In the following dialog, you press on Yes. Therewith, you get back Exit to the Windows Desktop. ETL DataView 3 Quickstart Guide Version 3.22.52...
Technical Support Technical Support You can find further topics on how to use ETL DataView in our detailed instruction. You can download all current documents on ftp://ETL- FTP:d0wn10ad@134.98.90.37/Manuals/DataView_3_en.zip. If you have questions on how to use the program please contact us via support@etl- prueftechnik.de.
Need help?
Do you have a question about the DataView 3 and is the answer not in the manual?
Questions and answers