Do you have a question about the SOL 25 S and is the answer not in the manual?
Questions and answers
Summary of Contents for STIEBEL ELTRON SOL 25 S
Page 1
Flat Collector SOL 25 S English Operating and Assembly Instructions 04/02 Assembly (water and electrical installation) as well as the initial start-up and maintenance of the appliance may be performed only by authorised, skilled personnel in accordance with these instructions.
1.3 Equipment provisions and function 07 42 74 SOL 25 SR1 frame laths for a corrugated sheet roofs. of the SOL 25 S collector system . . 4 SOL 25 S collector. Contents: 1.4 Control and operation ... 4...
1.2 Technical data SOL 25 S TYPE Order no. 07 42 72 Design certification no. 02-328-038 Dimensions/weight Height 2233 Width 1223 Depth Grid dimension (incl. fitting) 1223 x 2327 Weight, empty Standstill temperature (at 1000W/m²) °C Operating pressure, min. Permissible operating overpressure...
2. Assembly Instructions for the Professional 2.1 Safety Information General Installation and assembly work must Use a safety harness even on flat roof Never leave the collector loose and only be performed by authorized edges and gabled edges. unsecured. If the collector falls, the glass technical personnel.
The seals must be resistant to Storage system to use automatic venting devices. glycol and temperatures up to 180 °C. For the standard Stiebel Eltron storage water heater solar system the in series Safety Roof passage switched collectors are switched to the...
Page 7
Thermal insulation Pressure expansion container The pressure expansion container is to be designed according to the Stiebel Eltron Roof passage planning documentation. The pressure (corrugated pipe hose) expansion containers offered as accessories are suitable for an operating overpressure of 6 bar and resistant to H -30 L and H -30 LS.
2.3 Fitting the assembly frame Do not fasten the rope to the pipe ends! General The existing roof construction must be checked for a perfect condition (statical check necessary, possibly construction research). All work on the roof must be performed by a roofer.
2.4 On-roof installation for a pantiled roof up to a 20 m mounting height Two collector frame types are available: -- On-roof assembly frame for 1 collector (07 42 74) -- On-roof assembly frame for 2 collectors (07 42 75) In addition, two roof hook kits (07 42 78) are required for mounting one collector on a pantiled roof;...
Page 10
The top roof hooks are set vertically to the roof hooks. Between the bore holes the distance to the bottom roof hooks is 2152 mm. Two slots have been provided on each angle. They can be used for TYPE B adjustments, depending on the roof TYPE A structure.
2.5 Installation on a flat roof up to a 20 m mounting height Top support Cross strut Two collector frame types are available: -- On-roof assembly frame for 1 collector Angle prop (07 42 74) -- On-roof assembly frame for 2 collectors Bottom support (07 42 75) In addition, two flat roof/wall assembly kits...
Installation on a Force data for one collector! Shearing force: corrugated sheet roof up to Mounting height Shearing force Tensile force Recommendation: a 20 m mounting height Up to 8 m 2.1 kN 1.1 kN 6 fixing means on Up to 20 m 3.5 kN 3.1 kN which the shearing...
Fix the underlying M12 nut with a Position the drilled corrugated sheets on Then tighten all screws. the roof and refasten them. lock nut. Position the plain washer and slightly The head assembly frame is mounted on tighten with the M16 nut on the the top adapters and the base assembly corrugated sheet.
2.10 Lightning protection Lightning protection SOL 25 S The collector housing, the assembly frame and the pipework must incorporated by a professional in the lightning protection measures in possibly existing lightning protection equipment. Collector housing Spot drill the underside of every collector and incorporate it in the lightning protection equipment using screw devices.
It is especially important to wear The Stiebel Eltron solar installation may be Therefore, the installation may also not be protective gloves and goggles when filled only with the H -30 L or the H -30 LS topped up with water.
Street, number _______________________________________________ Manufacture no. Factory no. Guarantee Certificate: Postal code, city ______________________________________________ You will find these details on the appliance's type plate. SOL 25 S SOL 25 S Type: 07 42 72 07 42 72 07 42 72 07 42 72 07 42 72 Manufacture no.
3. Guarantee For guarantees please refer to the respective terms and conditions of supply for your country. The installation, electrical connection and first operation of this appliance should be carried out by a qualified installer. The company does not accept liability for failure of any goods supplied which have not been installed and operated in accordance with the manufacturer's...
1.09 Is the collector temperature sensor mounted at the specified position and electrically connected? 1.10 Has the electrical wiring been performed in accordance with the Stiebel Eltron wiring diagram (SOM 6K, SOM 7/2 and SOM 6/3 D assembly instructions)? 1.11 Is the solar control set according to the assembly and operating instructions? 1.12 Has the test run of the circulation pump been performed –...
Internet www.stiebel-eltron.hu Internet www.stiebel-eltron.se Nederland Thailand Belgique Stiebel Eltron Nederland B.V. Stiebel Eltron Ltd. Stiebel Eltron Sprl / Pvba Daviottenweg 36 469 Building 77, Bond Street Rue Mitoyenne 897 B-4840 Welkenraedt Postbus 2020 NL-5202 CA's-Hertogenbosch Tambon Bangpood 087-88 14 65...
Need help?
Do you have a question about the SOL 25 S and is the answer not in the manual?
Questions and answers