Universal Condenser Bracket
series
● Use the wall bracket C-WG-S/C-WG/C-WG-L for split type air
conditioner that weight less than 80kgs or 176lbs.
After installing, please review the contents of the provided
Warning.
●If disassembling or disposing of the bracket, please consult with
Specialist or the seller
Never sit or swing on the item, as it may break
Never sit or swing on the item, as it may break
!
Do not remodel. The items lifespan will shorten if the strength is
W
insufficient
A
R
Tighten the screws securely. Failure to tighten the screws may result in
N
disassembly
I
N
Never sit or swing on the item, as it may break
G
How to assemble(Back side for use as a two-tiered installation)
How to assemble(Back side for use over existing air conditioner)
Extend the ① Frame Connector to form a frame
①Frame Connector
自然保護のため、この説明書はリサイクルペーパーを使用しています。
3.
Reffering to the dimension scale
On the ① Frame Connector, hook
the ③ Base on the opposite side
of frame and then fix the front side
of ③ Base with ④ Metal Fitting for base.
③Base
Dimension scale
④Metal Fitting for
Base
If the ③ Base is shifting, lightly hit the ④ Metal Fitting for
Base gently with such a hammer in the direction of depth
For installation
Fix the upper left and right sides of the pillars from the
columns on the wall with ⑥ Retaining Stay, ⑦ Coach Bolt,
⑧ Hex Bolt, and ⑨ Nuts.
Pillar
Bend it if it is long
● If there is a point to notice with this products, please inform us the product number printed on the side of carton box
HIGH FLAT and DOUBLE MOUTHING type
C-WG-S・C-WG・C-WG-L
04-15
For a two-
tiered
installation
, use the
four long
holes below.
When attaching with commercially
available anchor bolts, fix with
the dimensions shown in the
figure below.
※⑦Coach bolts should
Anchor Dimension
be fastened to pillars
Inch(mm)
or other solid
structures.
C
O
N
T
E
N
T
S
2.
Raise up the ② Leg Connector set on the ① Frame Connector and fix
it with the ⑧ Hex Bolts(+ M8-20)
※Please note that there are (R) and (L) Leg Connectors.
※If Hex bolts are
tightened too
much ,the thread
may break
(Tightening torque
12N-m)
Install A/C Outdoor unit
1.
Tighten each bolts of
the bracket firmly
again
2.
Set ⑤ insulation nut,
install and fix A/C
outdoor unit with ⑧
Hex bolts.
This instruction manual uses recycled paper for protection of the natural environment.
NISSEI METALS CO.LTD.
INSTALLATION MANUAL
R
L
①Frame Connector
②Leg Connector
Effective dimension
of lower section
⑧Hex Bolts
The mounting holes for ② Leg Connector will change depending
on the height of the air conditioner installed in the lower
section.
Air conditioner Foot Dimensions (mm and inch)
③ Base
2
pcs
2
set
18
pcs
2
pcs
⑤Insulation
nuts
04-15

Advertisement

loading
Need help?

Need help?

Do you have a question about the go Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nissei go Series

  • Page 1 HIGH FLAT and DOUBLE MOUTHING type NISSEI METALS CO.LTD. C-WG-S・C-WG・C-WG-L INSTALLATION MANUAL Universal Condenser Bracket series ● Use the wall bracket C-WG-S/C-WG/C-WG-L for split type air conditioner that weight less than 80kgs or 176lbs. ● After installing, please review the contents of the provided Warning.
  • Page 2 When used over an existing air conditioner (Back side for use as a two-tiered installation If the existing air conditioner is smaller than the effective inside dimensions, it can be used over the top. ※Please check the dimensions of the air conditioner before use.

This manual is also suitable for:

C-wg-sC-wgC-wg-l