Summary of Contents for Natural Playgrounds Water Table
Page 1
Water Table Installation Instructions Note: Leg Extensions (2x6x36”) and Leg Extension Cleats (2x4x20”) not shown. Page...
Page 2
finished grade. 9. Fill the bottom 6” of hole with drainage stone. Then lift the water table and set the legs into the post holes so the grade marks are at grade. Again, trim the bottom of the posts if necessary.
Page 3
12. Fill the rest of the hole with concrete per instructions on bag, stopping four inches below the grade line marked on the water table legs. Recheck to make sure water table is level periodically while concrete cures. Let cure for 24 hours.
Need help?
Do you have a question about the Water Table and is the answer not in the manual?
Questions and answers