Product overview
Fig. 1: Schematic diagram, example WK-D-GK
1
Nonius hanger ceiling construction (on-site)
2
Support profile / base profile (on-site)
3
Mounting bracket
Safety
Correct use
Chilled ceilings and chilled ceiling elements are
used to control the temperature of interior spaces
and dissipate thermal loads through the medium of
water.
Chilled ceilings only influence the thermal loads in
an internal space. In comfort zones, a mechanical
ventilation and air conditioning system should addi-
tionally be used to maintain the air quality required
by applicable standards.
Installation manual
Chilled ceilings
WK-D-GK
Chilled ceilings WK-D-GK
GB/en
4
Carrier sheet
5
Heat conducting rail
6
Copper tube meanders
Depending on the area of application, special
hygiene requirements must be observed during
installation, operation, and maintenance.
TROX GmbH
Heinrich-Trox-Platz
47504 Neukirchen-Vluyn
Germany
Phone: +49 (0) 2845 202-0
Fax: +49 (0) 2845 202-265
E-mail: trox-de@troxgroup.com
http://www.troxtechnik.com
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WK-D-GK and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Trox Technik WK-D-GK

  • Page 1 Chilled ceilings Fax: +49 (0) 2845 202-265 E-mail: trox-de@troxgroup.com http://www.troxtechnik.com WK-D-GK Product overview Fig. 1: Schematic diagram, example WK-D-GK Nonius hanger ceiling construction (on-site) Carrier sheet Support profile / base profile (on-site) Heat conducting rail Mounting bracket Copper tube meanders...
  • Page 2 HVAC technicians are individuals who have suffi- cient professional or technical training in the field they are working in to enable them to carry out their assigned duties at the level of responsibility allocated to them and in compliance with the rel- Chilled ceilings WK-D-GK...
  • Page 3: Dimensions And Weight

    Dimensions and weight Dimensions and weight Fig. 5: WK-D-GK - Meander Fig. 2: WK-D-GK - straight pipe Fig. 6: WK-D-GK - Meander Fig. 3: WK-D-GK - straight pipe Fig. 7: WK-D-GK - Meander Fig. 4: WK-D-GK_straight pipe Length 600 - 5000 mm...
  • Page 4: Transport And Storage

    Load suspension systems only with the weight  of the device. Adjacent components and con- necting ducts must be supported separately. Use only approved and adequately sized fixing  material (fixing material is not included in the supply package). Chilled ceilings WK-D-GK...
  • Page 5 Chilled ceilings are used indoors only. To avoid hazards and damage due to frost, rooms with filled cooling circuits must be frost-free. If there is a risk of frost, especially on construc- tion sites, we recommend completely draining the water-bearing system. Chilled ceilings WK-D-GK...
  • Page 6 Stand clear of suspended loads, unless prop-  erly secured. Check secure fixing after installation!  During installation, a distance from the raw  ceiling and the substructure to the water-side connection option must be taken into account. Chilled ceilings WK-D-GK...
  • Page 7 Assembly Installation types Fig. 8: WK-D-GK ceiling cooling element for combination with gypsum plasterboards Nonius hanger ceiling construction (on-site) Carrier sheet cooling panel Support profile / base profile (on-site) Heat conducting rail Bracket suspension element Copper tube meanders NOTICE! Do not fix any attachments, screws, nails or other pointed bodies in/on the cooling ele- ments.
  • Page 8 The cooling elements are lifted during the final  installation of the plasterboard. In this process, jamming to the support profile must be avoided Fig. 9: WK-D-GK suitable for mounting on plaster- board ceilings Mounting bracket Cooling panel WK-D-GK Gypsum plasterboard (on-site)
  • Page 9 Assembly Chilled ceilings WK-D-GK...
  • Page 10 This is to be checked. Fig. 11: Deburring Cooling elements, except for the connection point of the copper tubes 12x0.35mm with support sleeve, must not be thermally processed. Fig. 13: Pipe connection 180° Chilled ceilings WK-D-GK...
  • Page 11 Before working on the water-side connec- tions, shut down, depressurise, and, if pos- sible, cool down the system. Cooling/heating capacities depending on Δt. For the heating function, surface temperatures > 35 °C should not be selected for reasons of comfort. Chilled ceilings WK-D-GK...
  • Page 12 Assembly Make connections to the cooling elements in such a way that external effects on the cooling ele- ments due to, e.g. thermal expansion, weight of the piping, vibrations, condensation and tensions are prevented. Chilled ceilings WK-D-GK...
  • Page 13: Initial Commissioning

    Filling and supplemental must be filled into the system with the appropriate water quality in order to ensure the long-term operation of the system. Chilled ceilings WK-D-GK...
  • Page 14: Maintenance And Cleaning

    The water quality may change during operation. The water quality must be monitored and docu- mented at regular intervals to prevent corrosion. Cleaning During cleaning, the following points must be Fig. 17: Schematic illustration of WK-D-GK observed: Clean surfaces with a damp cloth. Pos. Component...