Download Print this page

HeatLink 10000 Assembly Instructions

Pex pipe dispensor

Advertisement

Quick Links

PEX Pipe Dispensor
HeatLink
®
Assembly Instructions
Note: Pipe dispensor parts may not be exactly as shown.
Locate base and center shaft
Screw center shaft into
Remove all components from box.
(separate pieces).
base with wrench.
Install bearing hub onto base arm. (Note:
Install 90° base arm onto base. (Note: Arm
Slip locking fork onto 90° base arm.
Hub slides into base arm)
slides onto center shaft.)
Install cross piece / rotating wheel with 1
1/2" square tubing (90° attached arm) and
Temporarily tighten one hub sleeve bolt
slide into bearing hub sleeve.
onto crosspiece arm.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 10000 and is the answer not in the manual?

Questions and answers

Summary of Contents for HeatLink 10000

  • Page 1 PEX Pipe Dispensor HeatLink ® Assembly Instructions Note: Pipe dispensor parts may not be exactly as shown. Locate base and center shaft Screw center shaft into Remove all components from box. (separate pieces). base with wrench. Install bearing hub onto base arm. (Note: Install 90°...
  • Page 2 Lock crosspiece wheel into horizontal position with locking fork. (Note: The locking fork attaches to the base arm) Place roll of pipe onto wheel. Adjust wheel depth to fit snug against pipe (loaded roll on dispensor) Lock pipe roll into position with retaining wall and lock center shaft with angle bolt.