Tricel 220798 Manual

Tricel 220798 Manual

Grp cold water storage tanks

Advertisement

Quick Links

1
IFS 1057348/4 4th April 2024
TRICEL – One Piece Tank Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 220798 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tricel 220798

  • Page 1 IFS 1057348/4 4th April 2024 TRICEL – One Piece Tank Manual...
  • Page 2: Table Of Contents

    Format 30 fittings ........................9 Screened air inlet vent..................... 9 Screened overflow ....................9 Maintenance recommendations for one piece water storage tanks ........10 Glossary of terms ........................11 IFS 1057348/4 4th April 2024 TRICEL – One Piece Tank Manual...
  • Page 3: Guidelines For Locating Water Tanks

    All tanks shall have a cover suitably supported. • Float operated valves and other controls should be readily accessible. • There should be sufficient clearance to allow for inspection, cleaning of internal surfaces and maintenance. IFS 1057348/4 4th April 2024 TRICEL – One Piece Tank Manual...
  • Page 4: Foundation Requirements

    • Tanks should be offloaded and moved using either a tail lift or a forklift. If any other method of lifting is going to be used, please contact Tricel customer services team for assistance. • Do not attempt to move a tank containing any water.
  • Page 5: One Piece Tanks

    2. One piece tanks Tricel manufactures a variety of one piece cold water storage tanks. They are durable, one piece constructions, that are easy to install and represent excellent value for money. These come in sizes from 45 to 6000 Litres. One piece tanks can also be supplied insulated to Format 30, thus meeting Dublin Corporation requirements for break tanks.
  • Page 6: Construction

    It is important that the base of these tanks be fully supported in use. • Tricel manufactures condensation trays to suit all sizes of water storage tanks. • Ensure that the base of the cistern is adequately uniformly supported over its whole area.
  • Page 7: Condensation Trays

    3. Condensation trays • Tricel manufactures condensation trays to suit our range of one- piece water tanks. We can also manufacture bespoke condensation trays (longer lead time on these items). • Condensation trays should be used in any instance where condensation, drips from pipe work or from tanks could cause nuisance damage or render floors wet and slippery.
  • Page 8: Pipe Connections For Cold Water Storage Tanks

    5. Pipe connections for cold water storage tanks • If the tank is to be drained down at a fast rate or by pumps etc., Tricel should be informed so that adequate vents can be placed on the tank. The standard vent is 3/4”...
  • Page 9: Format 30 Fittings

    A 1 ½” screened overflow is supplied with each Format 30 tank. Please contact us if a different size is required. These are not fitted by Tricel. Overflows larger than 1 ½ “ have a different configuration. Warning or tell-tale pipes if specified must also be screened.
  • Page 10: Maintenance Recommendations For One Piece Water Storage Tanks

    Our tanks have a corrosion free design so once installed there is virtually no requirement to attend to its structure. We do, however, recommend inspecting the tank annually in accordance with BS EN 806-5. IFS 1057348/4 4th April 2024 TRICEL – One Piece Tank Manual...
  • Page 11: Glossary Of Terms

    Leakage test: The duration of the test should be a minimum of 24 hours, commencing at least 2 hours after the tank has been filled. The tank should be inspected at regular intervals and not deserted during commissioning (first filling with water). The leakage test is not carried out by Tricel. 9. Glossary of terms...
  • Page 12 No warrants, express or implied, are contained therein, nor does any legal liability attach to Tricel for any reason whatsoever. Property rights of the subject belong to Tricel, and transfer of these rights is not granted by possession of this document. - April 2024 IRELAND –...

Table of Contents