Advertisement

Uhome Smart Energy (Wuxi) Co., Ltd.
Our Environment, Our Energy, Our Future
Version:2.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Energy Storage LFP 2400 and is the answer not in the manual?

Questions and answers

Summary of Contents for Uhome Energy Storage LFP 2400

  • Page 1 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future Version:2.1...
  • Page 2 – Method 1 mandatory requirements and Optional requirements – a), c), e), f), g), h), i), j), k), l), m), n), o), p), q). Declaration Uhome declares that the LFP 2400/2500/5000 is compliance with the essential requirements and other relevant of RE Directive 2014/53/EU.
  • Page 3: Table Of Contents

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future CONTENT 1. Safety Introduction ........................1 1.1 Important Safety Instructions ..................1 1.2 Warnings in this Document ....................1 1.3 Battery Handing Guide ..................... 2 1.4 Response to Emergency Situations ................2 1.4.1 Leaking Batteries ....................
  • Page 4 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 7.Commissioning ..........................31 7.1 Commissioning Battery ....................31 7.2 Shutting Down Battery ....................32 8.Firmware Update ........................32...
  • Page 5: Safety Introduction

    A warning describes a hazard to equipment or personnel. It calls attention to a procedure or practice which if not correctly performed, could result in damage to or destruction of part or all of the Uhome equipment and/or other equipment connected to the Uhome equipment or personal injury.
  • Page 6: Battery Handing Guide

    The battery not be connected directly to SELV circuit.  1.4 Response to Emergency Situations The Uhome battery is designed with multiple safety strategies to prevent hazards resulting from failures. However, Uhome cannot guarantee their absolute safety for uncertain situations. 1.4.1 Leaking Batteries If the battery pack leaks electrolyte, avoid contact with the leaking liquid or gas.
  • Page 7: Wet Battery

    If the battery catches fire, it will produce poisonous gases. Do not approach. 1.4.3 Wet battery If the battery is wet or submerged in water, do not try to access it. Contact Uhome Customer Service or your distributor for technical assistance.
  • Page 8: Scrap Battery

    These products shall be handled with care and immediately inspected if visibly damaged. If the carton visibly damaged, please contact with Uhome customer service to confirm whether the battery could be used safely or not.
  • Page 9: Product Introduction

    Over-current/Over-voltage/Short circuit/ Under-voltage/Over temperature Cell UL 1973 Cell UL 1973 Cell UL TUV Safety Hazardous Material classification Transportation UN 38.3 Testing conditions based on temperature 25℃ at the beginning of life. *Total Energy/Usable Energy measured under specific conditions from uhome 0.2C CC-CV.
  • Page 10: Indicator And Ports

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 3.2 Indicator and Ports 3.2.1 Indicator There are two LED indicators on the front of the battery to show its operating status. Item Designation Definition Battery working normally...
  • Page 11: Communication Interface

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 3.2.3 Communication Interface Designation Definition SW 1 DIP switch for CAN or RS485 communication(Defined in inverter’s user manual.) For CAN Communication, SW1 = 1 & 2 For 485 Communication, SW1 = 3 & 4...
  • Page 12: Solution Of Uhome

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 3.3 Solution of Uhome...
  • Page 13: Feature

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 3.4 Feature The Uhome Energy Storage battery has following features: Energy storage unit This battery is suit for photovoltaic system compatibility.  Battery management system (BMS) The battery built-in BMS monitors its operation ...
  • Page 14: Installation Position

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 4.2 Installation Position Make sure that the installation position meets the following conditions: The building is designed to withstand earthquakes.  Far away from the sea to avoid salt water and humidity.
  • Page 15: Safety Instruments

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 4.4 Safety Instruments When dealing with the battery, following safety gears should be equipped. Installers must meet the relevant requirements of IEC 62040 and IEC 62619 or the domestic legislation and other relevant international standards.
  • Page 16: Battery Installation

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 5. Battery Installation 5.1 Package Items You can receive one packing cartons about the batteries, all items are summarized as follow: (Product accessories are customized according to customer needs, the following is standard accessories list.)
  • Page 17: Battery Installation

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 5.3 Battery Installation There is a grounding icon on the front of the battery: For Series connection, the grounding cable is essential to be installed.  For Parallel connection, the grounding cable is recommended to be installed.
  • Page 18 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 2. Stacking the batteries as pictures: NOTICE A cabinet is recommended to be used if more than 4 batteries are installed.
  • Page 19: Wall Mounting

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 5.3.2 Wall Mounting Drill holes of M8 in the wall at least 50 mm depth according to the positioning cardboard. 2. Tighten the screws of screws between the bracket and the battery with 2.5N.m torque.Two or four batteries can be installed by these brackets.
  • Page 20: Cable Connections Of The Battery

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 5.4 Cable Connections of the Battery WARNING Connect cables in accordance with local installation laws and regulations. Before connecting cables, ensure that the battery is OFF. Otherwise, the high voltage of the battery may result in electric shocks.
  • Page 21 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 2. Connect the M/S Port. between the batteries with communication cables, then c onnect the power cables. * Wall mounting 1. Two batteries installed.
  • Page 22: Parallel Connection

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 2. Four batteries installed. NOTICE For wall mounting, the number of batteries should be less than 4. If more batteries are installed, a cabinet is recommended to use. If batteries are connected in Series, ground installation is recommended.
  • Page 23 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future * Wall mounting 1. Two batteries installed. 2. Four batteries installed. NOTICE For wall mounting, the number of batteries should be less than 4. If more batteries are installed, a cabinet is recommended to use.
  • Page 24: Battery Address Dip Switch Setting

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 5.5 Battery Address DIP Switch Setting For Parallel connection, SW2 DIP 8 select 'OFF'; For Series connection, SW2 DIP 8 select 'ON '. The SW1/SW4/SW5 defined in inverter’s user manual.
  • Page 25 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future Connected Set of SW 2 Address(Set of Battery Group SW3) Series connect Parallel connect Numbers Primary Sub 1 Primary Sub 1 Sub 2 Primary Sub 1...
  • Page 26 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future Sub 2 Sub 3 Primary Sub 1 Sub 2 Sub 3 Sub 4 Primary...
  • Page 27 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 Primary Sub 1 Sub 2...
  • Page 28 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future Sub 3 Sub 4 Sub 5 Sub 6 Primary Sub 1 Sub 2 Sub 3...
  • Page 29: Configuration

    Sub 5 Sub 6 Sub 7 6. Configuration NOTICE There are three ways to configure WIFI, choose one of them according to your needs 6.1 APP Download Search for the Uhome Energy APP in the Google or Appstore and download.
  • Page 30: Configure Battery Wifi

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 6.2 Configure Battery WIFI The battery has a built-in WIFI module for use with the App. 1. Turn on the battery and Press the "Reset" button for 2 seconds, the green light on the battery starts flashing slowly and searching for WIFI, connecting the local WIFI.
  • Page 31 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 3. Enter the local wifi password, select Broadcast then press Start Smart Config.(If the broadcast doesn't work, replace it with multicast.) NOTICE If the WIFI cannot be set or there is no WLAN accessible, the battery can still operate normally.
  • Page 32: Direct Connected

    Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 6.3 Direct Connected 1. Turn on the battery and Press the "Reset" button for 5 seconds, the green light on the battery starts flashing fast. 1.Search for WIFI, connecting WIFI starting with number14XXXXXXXX (Battery’s SN number).,...
  • Page 33: Register Account

    2. Continue to select according to the steps showing as below. 6.4 Register Account NOTICE The Uhome battery could be registered only one time. NOTICE The Uhome battery running is not associated with registration or not. 1. Open the APP monitor of battery, select Sign up.
  • Page 34 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 2. Scan the device QR code or enter the device SN manually, as show in the pics: 3. Registration completion pop up after select inverter manufacturer and enter battery...
  • Page 35 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 4. If more than two batteries are used at the same time, you need to manually add additional information about another set of devices, as shown in the pics: 7.Commissioning...
  • Page 36 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future 7.2 Shutting Down Battery Shut down the battery only when the battery is no charging or discharging which can be seen in your phone with APP. 1. Press and hold the Panel Button for 5s, release after hearing the sound of relay breaking.
  • Page 37 Uhome Smart Energy (Wuxi) Co., Ltd. Our Environment, Our Energy, Our Future...

This manual is also suitable for:

Energy storage lfp 2500Energy storage lfp 5000

Table of Contents