Download Print this page

Advertisement

Quick Links

QUICKSTART
Airius II Wi-Fi
1
i n f o @ s p m i n s t r u m e n t . s e

Advertisement

loading
Need help?

Need help?

Do you have a question about the Airius II Wi-Fi and is the answer not in the manual?

Questions and answers

Summary of Contents for SPM Airius II Wi-Fi

  • Page 1 QUICKSTART Airius II Wi-Fi i n f o @ s p m i n s t r u m e n t . s e...
  • Page 2: Table Of Contents

    Setting up vibration measurements in Condmaster.NET ......9 Changing battery ..................10 SPM Instrument AB | Box 504 | SE-645 25 Strängnäs | Sweden Technical data subject to change without notice. Tel +46 152 225 00 | info@spminstrument.se | www.spminstrument.com ISO 9001 certified.
  • Page 3: Technical Specifications

    Spare part kit (battery, O-ring, 4 pcs M2.5x6 screw) AIR11-10 Airius II Wi-Fi, battery-powered sensor, 2-5000 Hz, 2/4/8/16 g AIR12-01 Airius II Wi-Fi, externally powered sensor, 10-1000 Hz, 2/4/8 g AIR12-10 Airius II Wi-Fi, externally powered sensor, 2-5000 Hz, 2/4/8/16 g * 3200 lines are only available for AIR11-10 and AIR12-10.
  • Page 4: Installation Of Airius Vibration Sensor

    Sensor torque: M4 with washer 2 Nm Mechanical installation, Airius vibration sensorS 7 Nm 7 Nm There are two ways to mechanically install Airius vibration sensors, either by UNF 1/4” 7 Nm screw installation or glue installation. Screw installation is recommended, if Ø...
  • Page 5: Setting Up Airius With Spm Connect

    9. Select dynamic (”Obtain IP address automatically (DHCP)”) or static IP addressing (F). If static, enter IP address. 10. Unfold Server (G) and select SPM Cloud or Condmaster Entity Server (CES), depending on the method of connection. Enter server address, server port, and whether SSL should be activated or not.
  • Page 6 s p m i n s t r u m e n t . c o m |...
  • Page 7: Setting Up Vibration Measurements In Condmaster Ruby

    Setting up vibration measurements in Condmaster Ruby 1. Select View as tree under Graphical Overview in the ribbon bar. 2. Expand Components. 3. Right-click Components, choose Create and select Component. 4. Enter component number and name. 5. Select Save. 6. Right-click the created component, choose Create and select Measuring point. 7.
  • Page 8 s p m i n s t r u m e n t . c o m |...
  • Page 9: Setting Up Vibration Measurements In Condmaster.net

    Setting up vibration measurements in Condmaster.NET 1. Open Condmaster.NET and log in. If required, select database. 2. Select Settings. 3. Select Components. 4. Select Add. 5. Fill in the component details. 6. Select Create. 7. Select Measuring points. 8. Select Add. 9.
  • Page 10: Changing Battery

    Changing battery Appropriate ESD protection measures must be taken when changing battery. 1. Loosen the screws and remove the lid. 2. Remove the battery and disconnect the plug. 3. Connect the plug and insert the new battery (100064). 4. Screw on the lid. Tightening torque: 0.5 Nm. Note! The lid should be put back in the same position as before removing it.
  • Page 11 This product must be disposed as electronic waste and is marked with a crossed-out wheeled bin symbol in order to prevent it being discarded with household waste. When the life cycle of the product is over You can return it to Your local SPM representative for correct treatment, or dispose it together with your other electronic waste.
  • Page 12 s p m i n s t r u m e n t . c o m |...