Summary of Contents for BAC Trillium TRF Series

  • Page 1 RTRF-v02-EN TRF TrilliumSeries™ Adiabatic Cooler RIGGING AND INSTALLATION INSTRUCTIONS...
  • Page 2 Be sure to have a copy of the unit certified drawing available for reference. If you do not have a copy of this drawing or if you need additional information about this unit, contact the local BAC representative. His name and phone number can be found on the www.BaltimoreAircoil.com.
  • Page 3: Table Of Contents

    Inspection Prior to Start-up General Electrical Panel Further Assistance & Information The service expert for BAC equipment More information W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 4: General Information

    Unit weights Before rigging any BAC equipment, the weight of each section should be verified on the unit certified drawing. These weights are approximate and should be confirmed by weighing before lifting when available hoisting capacity provides little margin for safety.
  • Page 5: Layout Guidelines

    CAUTION Before an actual lift is undertaken, ensure no water, snow, ice or debris has collected in the sump or elsewhere in or on the unit. Such accumulations will add substantially to the equipment’s lifting weight. In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with safety slings placed under the unit.
  • Page 6: Connecting Pipework

    Purge requirements The installer of BAC closed circuit cooling towers must ensure a proper air purging of the system prior to operation. Entrained air can restrict the capacity of the cooler, resulting in higher process temperatures.
  • Page 7: Non-Walking Surfaces

    Whenever modifications or changes are made by others to the BAC equipment without written permission of BAC, the party who has done the modification becomes responsible for all consequences of this change and BAC declines all liability for the product.
  • Page 8: Warranty

    BAC will guarantee all products to be free from manufactured defects in materials and workmanship for a period of 24 months from the date of shipment. In the event of any such defect, BAC will repair or provide a replacement. For more details, please refer to the Limitation of Warranties applicable to and in effect at the time of the sale/purchase of these products.
  • Page 9: Rigging

    RIGGING General notes 1. The equipment arrives on site by truck. A crane must always be used to unload the unit from the truck. Do not attempt to unload the unit using a forklift. 2. If the unit is shipped in a closed box container, one side of the pre-cooling media construction is shipped separately in the container and needs to be installed on site.
  • Page 10: Rigging Information

    CAUTION When the unit is installed, all metal parts created by drilling, fastening self tapping screws, grinding, welding or other mechanical works must be removed from the unit. If they remain on the unit (typically on the double break flanges) this could lead to corrosion and eventually coating damage.
  • Page 11 CAUTION Units need to be lifted from the 4 bottom lifting points. End View End view Side View 4-fan units 2 Rigging 2 Rigging W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 12 6-fan units 8-fan units 10-fan units W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 13 12-fan units 14-fan units 16-fan units 2 Rigging 2 Rigging W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 14 18-fan units Please note that the centre of gravity is not centered on the unit. W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 15: Section Assembly

    SECTION ASSEMBLY Installation of the fluid temperature sensor A temperature sensor is supplied with the unit and is shipped inside the electrical panel together with a socket for installation in the return pipe. The drawing below shows the dimensions of the socket (values in mm): The socket is equipped with a PG7 - IP68 cable gland applied to the hexagonal end to secure the cable.
  • Page 16: Optional Accessories Assembly

    OPTIONAL ACCESSORIES ASSEMBLY All optional accessories are factory installed. 4 Optional Accessories Assembly 4 Optional Accessories Assembly W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 17: Inspection Prior To Start-Up

    INSPECTION PRIOR TO START-UP General Prior to start-up, the following services, which are described in detail in the Operating and Maintenance Manual (see table "Recommended maintenance and monitoring programme" ) must be performed. Proper start-up procedures and scheduled periodic maintenance will prolong the life of the equipment and ensure trouble-free performance for which the unit is designed.
  • Page 18 OPERATIONAL SAFETY If BAC does not deliver the controls, this is the customer's responsibility. The unit's controls are - in part - responsible for the proper operational safety of the unit as a whole. Hence, these controls need to be designed to make sure that no unsanitary situation can present itself due to a poor operation of the unit.
  • Page 19 WEEK-END OR TEMPORARY SHUTDOWN The unit must be shutdown by the "ON/OFF" switch of the digital controller either locally or through the BMS system. 5 Inspection Prior to Start-up 5 Inspection Prior to Start-up W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 20: Further Assistance & Information

    Upgrades and new technologies - save up energy and improve maintenance by upgrading your system. • Water treatment solutions - equipment for controlling corrosion scaling and proliferation of bacteria. For more details, contact your local BAC representative for further information and specific assistance at www.BACservice.eu More information REFERENCE LITERATURE •...
  • Page 21 W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 22 W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 23 W W W . B A L T I M O R E A I R C O I L . C O M...
  • Page 24 COOLING TOWERS CLOSED CIRCUIT COOLING TOWERS ICE THERMAL STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS, EQUIPMENTS & SERVICES www.BaltimoreAircoil.com Europe@BaltimoreAircoil.com Please refer to our website for local contact details. Industriepark - Zone A, B-2220 Heist-op-den-Berg, Belgium © Baltimore Aircoil International nv...

Table of Contents