Download Print this page

QUALITY LIFTS EQ12 Installation, Operation & Maintenance Manual

Two post surface mounted lift

Advertisement

Quick Links

I
NSTALLATION
Surface Mounted Lift
2311 South Park Rd., Louisville, KY 40219
TOLL FREE: 877-771-5438 FAX: 502-583-5488
IMPORTANT:
, O
& M
PERATION
Two Post
M
EQ12
ODEL
12,000
. C
LBS
3000
.
LBS
PER
QUALITY LIFTS, LLC
E-mail:
sales@qualitylifts.com
www.qualitylifts.com
READ THIS MANUAL COMPLETELY BEFORE
INSTALLING or OPERATING LIFT
AINTENANCE
APACITY
A
RM
M
ANUAL
Rev. 2024/03/18

Advertisement

loading

Summary of Contents for QUALITY LIFTS EQ12

  • Page 1 AINTENANCE ANUAL Two Post Surface Mounted Lift EQ12 ODEL 12,000 APACITY 3000 QUALITY LIFTS, LLC 2311 South Park Rd., Louisville, KY 40219 TOLL FREE: 877-771-5438 FAX: 502-583-5488 E-mail: sales@qualitylifts.com www.qualitylifts.com IMPORTANT: READ THIS MANUAL COMPLETELY BEFORE INSTALLING or OPERATING LIFT...
  • Page 2 Model EQ12 Installation, Operation and Maintenance ENERAL PECIFICATIONS See Figure 1 EQ12 Rise Height (Screw Pads Highest Position) 75 15/16" (1928 mm) Overall Height 13’-10"/14’-7” (4216 mm/4445 mm) Overall Width 139 3/4" (3550 mm) Drive-Thru Clearance 103" (2616 mm) Floor to Overhead Switch 13’-3 ½"/14’-½”...
  • Page 3 Model EQ12 Installation, Operation and Maintenance Safety decals similar to those shown here ERTICAL LEARANCE are found on a properly installed lift. Be sure Check the height of the area where the lift is to be that all safety decals have been correctly installed.
  • Page 4 Model EQ12 Installation, Operation and Maintenance ECEIVING NSTALLATION The shipment should be thoroughly inspected as AFETY EQUIREMENTS FOR NSTALLATION AND soon as it is received. The signed bill of lading is ERVICE acknowledgement by the carrier of receipt in Refer to ANSI/ALI ALIS (current edition)
  • Page 5 Model EQ12 Installation, Operation and Maintenance Route cable around outside of column as NCHORING shown in Fig 4. Note: 14) Check idler column shimming. Use additional  The anchor bolts must be installed at least 8” shims (see Fig 3) to remove any gaps that from any crack, edge, or expansion joint.
  • Page 6 Model EQ12 Installation, Operation and Maintenance 18) Attach one end of synchronizing cable to overhead through each of the guides as carriage. See Fig 6 for proper attachment. shown in Fig 8 and down the backside of the power column.
  • Page 7 Model EQ12 Installation, Operation and Maintenance Fig. 10 – Lock Cable Routing Fig. 8 – Power Side Routing HE LOCK RELEASE CABLE ADJUSTMENT IS NOT COMPLETE UNTIL THE LIFT HAS BEEN LOWERED AND ELEASE “ ” 29) Install Lock Release Rod, Clevis, and Knob...
  • Page 8 Model EQ12 Installation, Operation and Maintenance 34) Ensure arm stop hardware is present and adequately tightened so that spring lock washer is fully compressed for each arm. Check arm stop engagement by fully extending each arm. Properly installed arm stop hardware will prevent arm from becoming over- extended and possibly disassembled.
  • Page 9 Model EQ12 Installation, Operation and Maintenance INAL DJUSTMENTS YNCHRONIZING ABLES 50) Raise lift and ensure carriages lower into YDRAULICS same lock position. 45) Lower the lift to the floor and raise the lift approximately one foot. 51) Adjust synchronizing cables so the tension is equal in both cables and carriages are firmly 46) Start with Idler side first.
  • Page 10 Model EQ12 Installation, Operation and Maintenance Fig. 13 – Electrical Wiring Diagram Page 10 EQ12-IOM-Q. Rev. 2024/03/18...
  • Page 11 Model EQ12 Installation, Operation and Maintenance National Standard for Automotive Lifts-Safety PERATION ROCEDURE Requirements for Operation, Inspection and Maintenance; and in the case of frame engaging AFETY OTICES AND ECALS lift, ALI/LP-GUIDE, Vehicle Lifting Points/Quick This product is furnished with graphic safety Reference Guide for Frame Engaging Lifts;...
  • Page 12 Model EQ12 Installation, Operation and Maintenance IFTING A EHICLE AINTENANCE To avoid personal injury, permit only qualified 1) Ensure that the lifting arms are parked, out to personnel to perform maintenance on this full drive thru position. equipment. Maintenance personnel should follow 2) Position the vehicle in the service bay so that lockout/tagout instructions per ANSI Z244.1.
  • Page 13 Model EQ12 Installation, Operation and Maintenance ARTS REAKDOWN ITEM # PART # QTY/LIFT DESCRIPTION JSJ6020200V COLUMN EXTENSION JSJ6-03-01-00V OVERHEAD WELD JSJ6-03-02 OVERHEAD SHUT OFF BAR JSJ5-03-03 OVERHEAD SHUT OFF BAR CUSHION LIMIT SWITCH PACKAGE B2064-V (INCLUDES SWITCH w/ CORD, BOTH BRACKETS, & ITEMS 6-9)
  • Page 14 Model EQ12 Installation, Operation and Maintenance ITEM # PART # QTY/LIFT DESCRIPTION JSJ6020100V POWER COLUMN WELD JSJ6020100FV IDLER COLUMN WELD 1-16288a SHOULDER BOLT 1-16388A M12 LOCK NUT JSJ5-02-07CH LOCK SPRING, 3/8” O.D. JSJ5-02-08CH LOCK SPRING, ½” O.D. B1140 LOCK PAWL...
  • Page 15 Model EQ12 Installation, Operation and Maintenance ITEM # PART # QTY/LIFT DESCRIPTION JSJ6-07-00 HYDRAULIC CYLINDER JSJ6-21 5/8-18 UN 90 DEGREE ELBOW JSJ6-20 5/8-18 UN HOSE EXTENSION (18 ½” LONG) (Std. Height) JSJ6-18 5/8-18 UN HOSE (411” LONG) JSJ6-15 9/16-18 UN x 9/16-18 UN x 5/8-18 UN TEE FITTING...
  • Page 16 Model EQ12 Installation, Operation and Maintenance ITEM # PART # QTY/LIFT DESCRIPTION JSJ6-04-00 SYNCHRONIZER CABLE (Std. Height) GJY12-3 HAIRPIN COTTER PIN JSJ6-03-08 CABLE SHEAVE X10-055 26mm WASHER JSJ6-03-03 CABLE SHEAVE PIN JSJ6-03-05 SHEAVE SPACER X10-038 M12 WASHER X10-039 M12 LOCK WASHER...
  • Page 17 Model EQ12 Installation, Operation and Maintenance ITEM # PART # QTY/LIFT DESCRIPTION JSJ6-08-00K CARRIAGE JSJ5-08-15 SLIDE BLOCKS JSJ6-11 ARM PIN JSJ4-05-ch DOOR GUARD X10-087 M8 WASHER X10-088 M8 x 30mm Lg. SOCKET HEAD BOLT X10-077 M10 x 25mm Lg. SOCKET HEAD BOLT...
  • Page 18 Model EQ12 Installation, Operation and Maintenance NOTES Page 18 EQ12-IOM-Q. Rev. 2024/03/18...
  • Page 19 Model EQ12 Installation, Operation and Maintenance REVISIONS 2020/12/15 – CHANGED POWER UNIT FROM 31368-19 TO AB-9367-DLH. UPDATED PARTS BREAKDOWN AND WIRING SCHEMATIC. 2021/02/16 – CHANGED ITEM 4 TO JSJ5-03-03 2023/11/15 – UPADTED ANSI/ALI REFERENCE MATERIAL. UPDATED ANCHORING INSTRUCTIONS Pg. 5.