T-1PS - 20 TO 75 KVA TIER-1 POWER SYSTEM User Manual V1.1 BEYOND THE INVERTER THE NEW GENERATION OF POWER CONVERTERS • DUAL INPUT INVERTER Commercial Power as default source • AC BACKUP IN A DC ENVIRONMENT Leverage your existing DC infrastructure •...
7.3.2 T-1PS Single Phase Configuration - 240 VAC ..............7.3.3 T-1PS Three Phase Configuration - 208 VAC ..............7.3.4 TSI Bravo module - Current ratings................. 8. System Installation ..........................Site Preparation ........................... – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 3
13.2 Defective modules ........................13.2.1 Replacing modules ......................13.2.2 Return defective T2S interface ..................13.2.3 Return defective shelf ....................13.2.4 Return defective modules ....................14. Service ..............................15. Maintenance Task ..........................– T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 4
Release Note: Release date Modified Version Modifications (DD/MM/YYYY) page number 01/10/2018 First release of the Manual. 25/05/2020 New layout – T-1PS 20 to 75 kVA – User Manual – v1.1...
CE+T at a glance 1. CE+T at a glance CE+T Power designs, manufactures, and markets a range of products for industrial operators with mission critical applications, who are not satisfied with existing AC backup system performances and related maintenance costs.
• Insulated tools must be used at all times when working with live systems. * These instructions are valid for most CE+T Products/Systems. Some points might however not be valid for the product described in this manual. – T-1PS 20 to 75 kVA – User Manual – v1.1...
• This equipment is shipped with a SHOCKWATCH monitor. SHOCKWATCH monitor should be inspected upon receipt of shipment. If the SHOCKWATCH shows that the equipment was exposed to excessive force the warranty will be void. – T-1PS 20 to 75 kVA – User Manual – v1.1...
1 Information and data given in this chapter intend to for an overview on the technology. Detailed features and parameters for each individual module type of the range may differ and should be referred in the dedicated data sheet. – T-1PS 20 to 75 kVA – User Manual – v1.1...
To set Mix Mode in T2S ETH, go to Parameters > Power > General > Source power ratio DC vs AC (%) and enter the value between “0-100”. (0 - only AC, 100 - only DC) – T-1PS 20 to 75 kVA – User Manual – v1.1...
GR 63 office vibration 0 to 100 Hz-0,1g / transport vibration Vibration 5-100 Hz 0,5 g 100 to 500 Hz-1,5 g / Drop test Operating ambiance / Ingress Protection Free from dust and corrosive materials / NEMA 1 (2) – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 13
20 s to 40 s depending on the number of module installed Nominal current. Protected against reverse 21 A current Crest factor at nominal power 3 : 1 With short circuit management and protection – T-1PS 20 to 75 kVA – User Manual – v1.1...
Note: Sub-Rack (shelf) for use in a NEBS environment are of different design. Use only shelves with specific NEBS label and Part Number. The shelf is not field replaceable and is not sold separately. Figure 2. Bravo shelf with modules – T-1PS 20 to 75 kVA – User Manual – v1.1...
• SNMP v1 through T2S ETH. • SNMP v2c and v3 through Catena (If T2S ETH is connected to Catena). Figure 3. Monitoring - T2S ETH • Power: 2 W – T-1PS 20 to 75 kVA – User Manual – v1.1...
• 7’’ touchscreen • Web browser with laptop (ETH) • Height: 3U • Power: 15 W Note: Catena is not intended to be connected to metallic Outside Plant (OSP) cable conductors. – T-1PS 20 to 75 kVA – User Manual – v1.1...
In any case, inverter damages that could be related to improper protection are not covered by CE+T product warranty. Caution: For continued protection against the risk of fire, replace only with the same type and rating of fuse. – T-1PS 20 to 75 kVA – User Manual – v1.1...
T-1PS Design and Description 7. T-1PS Design and Description 7.1 T-1PS 20 to 75 System Design T-1PS 20 to 75 is a cabinetized modular inverter specifically designed for clean and temperature-controlled environments. • Telecom grade design. • The system cannot be installed back to a wall. A minimum clearance distance of 36 inches is required.
AC Input Terminals (X2) AC Output Terminals (X4) DC Input DC Input Catena Internal DC distribution (Q1-Q10) T2S ETH Inverter Modules Figure 6. T-1PS 25 kVA System - General Arrangement – T-1PS 20 to 75 kVA – User Manual – v1.1...
Internal DC distribution (Q1-Q16) Internal DC distribution (Q17-Q30) T2S ETH Phase 1 Inverter Modules Phase 2 Inverter Modules Phase 3 Inverter Modules Figure 7. T-1PS 75 kVA System - General Arrangement – T-1PS 20 to 75 kVA – User Manual – v1.1...
Cable Max based on Terminal Size Breaker Cable Min T-1PS-48-1-20-00-08 225 A 250 kcmil 300 kcmil T-1PS-48-1-25-00-10 250 A 300 kcmil 300 kcmil Table 3. Single Phase 120 VAC - AC Details – T-1PS 20 to 75 kVA – User Manual – v1.1...
110 A 1 AWG 1 AWG T-1PS-48-2-40-00-16 225 A 250 kcmil 300 kcmil T-1PS-48-2-50-00-20 250 A 300 kcmil 300 kcmil Table 6. Single Phase 240 VAC - AC Details – T-1PS 20 to 75 kVA – User Manual – v1.1...
110 A 1 AWG 1 AWG T-1PS-48-3-60-00-24 225 A 250 kcmil 300 kcmil T-1PS-48-3-75-00-30 250 A 300 kcmil 300 kcmil Table 9. Three Phase 208 VAC - AC Details – T-1PS 20 to 75 kVA – User Manual – v1.1...
145.81 1,008.00 166.64 1,152.00 187.47 1,296.00 208.30 1,440.00 Upstream / downstream protections and field wiring should be based on the maximum number of modules. Table 10. Module Current Details – T-1PS 20 to 75 kVA – User Manual – v1.1...
• Empty inverter positions shall be covered with the dummy cover. • T-1PS is designed for temperature controlled (max 40°C / 104°F) and clean environments. The presence of airborne particles such as urban dust, sand and metallic dust is forbidden. Appropriate filters shall be installed.
Modules ordered with the system are packed separately in a carton or a pallet. Module packing material shall be taken apart and stored in case of return under warranty. Improper packing of a returned module may void the warranty. – T-1PS 20 to 75 kVA – User Manual – v1.1...
Check section 7, page 18 to identify system configuration and refer to section 7.3, page 21 for cable sizes. Refer also to 8, page 25 for important safety notices. – T-1PS 20 to 75 kVA – User Manual – v1.1...
(min) to Neutral cable cross section. Adhere to local regulations. (See 8.5.3, page 29) The ground has to be connected in accordance with local code and NEC - NFPA 70. T-1 PS is only intended for Common Bonding Network (CBN). – T-1PS 20 to 75 kVA – User Manual – v1.1...
PE output terminal bonding that circuit to the enclosure and ground the enclosure to a suitable grounding electrode in accordance with local code requirements. – T-1PS 20 to 75 kVA – User Manual – v1.1...
Equivalent ft-lb Terminal 35 MM 2.21 to 4.43 3.69 T-1PS Terminal 120 MM 7.38 to 14.75 14.75 8.5.4 DC Input DC IN DC IN Figure 14. DC Position – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 31
Note: Screws, nuts and cable shoes are not included in the delivery. Figure 15. Single Feed DC - Bus Bar arrangements Figure 16. Single Feed DC - Negative bar hole details – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 32
Note: Screws, nuts and cable shoes are not included in the delivery. Figure 17. Dual DC Feed - Bus Bar arrangements Figure 18. Dual DC Feed - Negative bar hole details – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 33
System Installation 8.5.4.4 Dual DC Feed - Internal Wiring Pattern Figure 19. Dual DC - Arrangement – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 34
Note: Screws, nuts and cable shoes are not included in the delivery. Figure 20. Triple DC Feed - Bus bar arrangements Figure 21. Triple DC Feed - Negative bar hole details – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 35
System Installation 8.5.4.6 Triple DC Feed Input - Internal Wiring Pattern Figure 22. Triple DC - Arrangement – T-1PS 20 to 75 kVA – User Manual – v1.1...
Note: To configure alarm severities for the relay such as Major, Minor and Relay 3, go to Parameters > Inputs/Relays > Relays Mapping . For more details, refer relay mapping section in T2S ETH user manual. – T-1PS 20 to 75 kVA – User Manual – v1.1...
8.6 Switching OFF T-1PS System Perform the following steps to Switch OFF the T-1PS System. Caution: While switching OFF the T-1PS System, the power to load will be disconnected. 1. Switch OFF AC Output Breakers. 2. Switch OFF AC Input Breakers.
• Parameter setting via Laptop. Ethernet Port • Factory default according to list of set values. Note: To know more details, refer to T2S ETH user manual. Figure 24. T2S ETH Front Details – T-1PS 20 to 75 kVA – User Manual – v1.1...
• Detail information on AC input power at the system level AC output power at the system level DC information at the system level Inverters information module level – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 40
The Catena is a monitoring device that gets information from the T2S ETH controller. So the pages in Catena display and web interface are same. Refer T2S ETH user manual, for viewing system information, accessing the parameters, and configuration settings. – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 41
All LED symbols indicate if there are any alarms present in the system. Green No alarm present normal operation Alarm present minor (orange), major (Red) Click the Search button to obtain more details. – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 42
DC input to obtain detail DC input information: This screen provides the following information: • DC input voltage VDC • DC input current Figure 29. Catena – DC input page – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 43
• AC output current per phase • Frequency • AC output power (kW) • Apparent power (kVA) LEDs indicate any alarm and on which phase (Green no alarm) Red (Alarm) – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 44
• Green: module OK • Orange: module in recoverable error • Red: module with unrecoverable error Figure 32. Catena – Module list For last two, refer to module manual for troubleshooting. – T-1PS 20 to 75 kVA – User Manual – v1.1...
(grey – event, orange – minor, red – major). A filter as shown below is available to display only a subset of these events. Figure 35. Catena – Events page – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 46
• Clear the log file (only possible in expert mode) • Upgrade the software of the T2S ETH unit. • Upload a language file. Figure 38. Catena – Files page – T-1PS 20 to 75 kVA – User Manual – v1.1...
Page 47
• Input/Relays • SNMP • Modbus • Power • Info Figure 39. Catena – Parameters page (Note: To know more details about parameters section, refer T2S ETH user manual.) – T-1PS 20 to 75 kVA – User Manual – v1.1...
B) Push firmly till the connection is properly C) Close the cover and latch the module in engaged place if too hard redo step B Figure 41. Module Inserting – T-1PS 20 to 75 kVA – User Manual – v1.1...
Check the ETH cable connection between Catena and T2S ETH. Reset Catena, by pressing the RESET button at front side of the Catena or Reinsert the T2S ETH in the shelf. – T-1PS 20 to 75 kVA – User Manual – v1.1...
• Insert the module in corresponding slot in the shelf. • Check the fan for operation. • Access T2S ETH and reset the fan run time alarm. Figure 43. Module Fan Replacement – T-1PS 20 to 75 kVA – User Manual – v1.1...
• Cover empty inverter bays with dummy cover. • Make sure that the Remote ON/OFF is appropriately wired according to local regulations. • Make sure that the point of AC supply meets local regulations. – T-1PS 20 to 75 kVA – User Manual – v1.1...
It is prohibited to perform any insulation test without instruction from manufacturer. Equipment is not covered by warranty if procedures are not followed. 12.1 Check list Refer the document “Commissioning Procedure” and available on request. – T-1PS 20 to 75 kVA – User Manual – v1.1...
Check configuration file No information on Catena: Check that T2S ETH is present and properly inserted Check that the RJ45 cable is connected between T2S ETH shelf and Catena – T-1PS 20 to 75 kVA – User Manual – v1.1...
Repair registering guidelines may be requested by email at repair@cet-power.com. • The RMA number should be mentioned on all shipping documents related to the repair. • Be aware that products shipped back to CE+T Power without being registered first will not be treated with high priority! •...
CE+T will redirect your call to your vendor if he has such SLA in place. (**) Valid in USA and Canada only. (***) Messages that are not Major Incident or Emergency will be served at the next scheduled working day. – T-1PS 20 to 75 kVA – User Manual – v1.1...
* It is not recommended because when you perform a By-pass procedure, generally there is no back up on the AC input line, and the load shutdown if mains disappear. – T-1PS 20 to 75 kVA – User Manual – v1.1...