Download Print this page

Advertisement

Quick Links

INSTALLATION
INSTALLATIE
INSTALLAZIONE
INSTALACIÓN
INSTALACE
INŠTALÁCIA
INSTALACJA
TELEPÍTÉS
INSTALACIJA
Standkonsole | T-support | Console-socle | Staande console | Console verticale | Consola de pie | Stacionární konzola |
Stojanová konzola | Konsola stojąca | Lábazat | Stojalo
» SK 2

Advertisement

loading
Need help?

Need help?

Do you have a question about the SK 2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Steibel Eltron SK 2

  • Page 1 INSTALLATION INSTALLATIE INSTALLAZIONE INSTALACIÓN INSTALACE INŠTALÁCIA INSTALACJA TELEPÍTÉS INSTALACIJA Standkonsole | T-support | Console-socle | Staande console | Console verticale | Consola de pie | Stacionární konzola | Stojanová konzola | Konsola stojąca | Lábazat | Stojalo » SK 2...
  • Page 2 - 4 screws M8x30 1 Drainage pipe - 4 washers Heat pump 3 Cs Plus, 3.5 aCs, 07 aCs classic 4 Cs Plus, 4.5 aCs, 09 aCs classic 6 Cs Plus, 6.5 aCs, 13 aCs classic 8 Cs Plus, 8.5 aCs, 17 aCs classic f lay a drainage pipe under the appliance to drain moisture away from the building. sK 2...
  • Page 3 InstallatIon Installation 5. Specification f Create a sufficiently sized gravel bed within the strip foundation. Data table 4. Installation SK 2 236693 Material losses Height Width note the maximum load bearing capacity of the sup- Weight port (see chapter "specification / Data table").