Advertisement

Quick Links

w w w . p r i m o i t a l i a n m a c h i n e . i t

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PRIMO-S97 and is the answer not in the manual?

Questions and answers

Summary of Contents for Primo Water PRIMO-S97

  • Page 1 w w w . p r i m o i t a l i a n m a c h i n e . i t...
  • Page 3: Maintenance

    Warranty Certificate About the use of Traction Machine General Instructions EMC Directive Copy Right Low Sign - Symbol - Interpretation & Meaning Technical Drawing PRIMO - S97 PRIMO - 125 PRIMO - 135 PRIMO - 150 PRIMO - 165 Machine Identification Gear Box and Motor Data Plate Safety Precaution PRIMO S.R.L.
  • Page 4 - S97 Technical Drawing Ø P ØP Ø480 ØP Ø560 Ø 19, 04 Nos. [Revision Date : 01-01-2027]...
  • Page 5 Technical Drawing Technical Drawing ØP Ø480 Ø P ØP Ø480 ØP Ø560 ØP Ø560 ØP Ø600 Ø600 Ø P [Revision Date : 01-01-2027] [Revision Date : 01-01-2027]...
  • Page 6 Technical Drawing Technical Drawing Ø 480 - Ø 560 - Ø 600 Ø 480 - Ø 560 - Ø600 82.5 82.5 [Revision Date : 01-01-2027] [Revision Date : 01-01-2027]...
  • Page 7: Machine Identification

    MACHINE IDENTIFICATION GEAR BOX AND MOTOR DATA PLATE D. C. ELECTROMAGNETIC BRAKE DOUBLE ACTING TYPE D.C. VOLTAGE : 220 V RESISTANCE : 275 Ohms. INSULATION : ‘F’ CLASS TERMINAL BOX TESTED OK MAIN COVER PRIMO - 165 VVVF NAME PLATE...
  • Page 8: Packing, Transport & Storage

    PACKING, TRANSPORT & STORAGE Bottom Pallet Bottom Pallet With Traction Machine Placement Mounting Bolts PRIMO S.R.L. VCI Cover Plastic Packing Nailing The Bottom Complete Packing Transport The Complete Packing...
  • Page 9: Transport And Storage

    OPENING THE PLYWOOD CRATES The nails must be removed to open the plywood crates. In order to prevent the wood from splintering, use the tool shown in figure.This Special tool is a right-angle tube. its short end has a V shaped groove with a shrpened edge. Place the centre of the sharpened side on the nail and strike the tube with a hammer until the lip is inserted in the wood, then turn the tube using the tube elbow as leverage so that the nail head is lifted...
  • Page 10 LUBRICATION SYNTHETIC OIL BRAND AGIP KLUBER MOBIL SHELL TYPE BLASIA GH 6 - 220 GLYGOYLE OMALA S 220 S4 WE - 220 Table No. 01 OIL CHANGE For synthetic oils every 24/36 months depending on the intensity of use. More frequent changes could be advisable in machines subject to high duty.(With the oils indicated in the chart is possible to foresee a slightly higher viscosity (ISO 320) in those gears subject to high duty.
  • Page 11 For Primo - S97, Primo - 125, Primo - 135, Primo - 150, Primo - 165. Connection Diagram For Ac2 4/16 Pole Motor with Thermistor Fig No. 01 Connection Diagram For VVVF 4 Pole Motor with Thermistor Table No.02 Fig No. 03 Fig No.
  • Page 13 HOW TO FIX ENCODER (OPTIONAL ) First remove Alen bolt with spring washer. Then after remove the pressure cover . Fix the pin encoder in worm shaft . Then remount pressure cover. Fix the plate encoder with encoder . Pass one alen bolt in plate encoder and tight allen bolts. D.
  • Page 14 Remove Alen bolt and then remove flywheel . Then remove brake arm spring by means of remove spring retainer and nuts. After remove circlip from brake stud and replace brake arm and follow reverse process. Fig No. 06 [Revision Date : 01-01-2027]...
  • Page 15 HOW TO REPLACE THRUST BEARING Remove alen bolt then remove flywheel . Remove alen bolt and then remove pressure cover Removing nut, spring retainer, spring and spring stud from solenoid . Remove lock nut and star washer . Then remove brake arm and remove brake stud from both side.
  • Page 16 HOW TO REPLACE MAIN SHEAVE Remove alen bolt and then remove pulley washer Then put distance piece between pulley washer & main shaft. Match pulley washer hole to main Sheave face and tighten the alen bolt. Sheave move outside, new replace sheave and follow reverse process. Fig No.
  • Page 17 Fig No. 10 [Revision Date : 01-01-2027]...
  • Page 18: Optional Accessories

    OPTIONAL ACCESSORIES ENCODER ARRANGEMENT BASEMENT TRACTION MACHINE PRIMO S.R.L. PRIMO S.R.L. Customer Service Address : PRIMO S.R.L., Via Noalese Sud. 66 / 30030 Mellaredo (VE) - ITALY E-mail : info@primoitalianmachine.it Website : www.primoitalianmachine.it...
  • Page 19 Unless otherwise agreed upon in the sales contract, this warranty is governed by the following clauses: 1.1 The warranty on PRIMO S.R.L. products is valid for a period of One year from the date shown on the shipping papers. During the warranty period, PRIMO S.R.L. will replace without charge an component that has been recognized as defective.
  • Page 20 NOTE...

This manual is also suitable for:

Primo-125Primo-135Primo-150Primo-165

Table of Contents