BLOW PORT: Push Red button to BLOW the left to release cuff. SUCTION SUCTION PORT: Push Red button down to release cuff. SUCTION: Insert / push the Hard Cuff on the end of the 50mm Wire Reinforced Hose, into the cyclonic suction port. “Click” lock in place.
Page 5
5M 50mm Wire Reinforced Hose SOFT CUFF: Attach to base of suction pole (Push Fit) HARD CUFF : to insert into either Blow / Suction port. (Push & Lock). FLOOR TOOL KIT: 3 x Handle Attachments. 2M 38mm HOSE For use with floor tool kit only. Insert Large Hard Cuff into Vac Port Insert Floor Tool Kit Handle into...
Page 6
BASE POLE SLOTS INSIDE BANDED TOP POLE COLOURED BAND: TOP OF POLE • Small round Brush for high level dusting. • Crevice tool connector • 3 gutter cleaning tools: Standard Dirt Breaker / Daily End Tool / Crevice End • 2 x Silicone Flexi Tool Holders: 135 &...
Page 7
6 x Tools: Aluminium Long end tool / Aluminium dirt breaker / Aluminium Crevice end tool / Elite long soft tool / Aluminium Tapered end tool / Aluminium Scalloped End Tool. • skyVac® Elite Hairpin tool holder – for firmer control and less risk of blockages. • 1 X skyVac® Elite Vac Release Pole.
Page 8
FOR PUSH FIT & CLAMPED POLES: Insert end tool into neck of tool holder. (not shown). Attach tool holder to head of the top / highest pole. Build poles up to the required height – starting at the top pole (with the end tools) and working down.
Page 9
The skyVac® Vac Release pole should always be the base pole, closest to the operator. Ensure the intended “drop” area below is clear . Place the end tool over the gutter turf and when securely held , lift the turf up out of the gutter.
Page 10
EMPTYING: To remove the Vac head, unclip the side clamps and us- ing the top handle, lift the Vac head out of the drum. Place Vac head safely on the ground. To remove the filter, lift the circular frame from the neck of the drum.
Page 11
TOP TIPS TO KEEP YOUR SKYVAC® MIGHTY ATOM WET & DRY VACUUM IN THE BEST CONDITION. 1. Start each new project with a CLEAN and DRY Filter. 2. Build your poles up to the required height resting against the side of a building—do not assemble on the ground and then try to lift up.
Need help?
Do you have a question about the MIGHTY ATOM and is the answer not in the manual?
Questions and answers