Installation; Introduction; Initial Inspection; Preparation For Use - Goldstar A0-3001C Operator's Manual

Audio oscillator
Table of Contents

Advertisement

INSTALLATION
INTRODUCTION
This section provides all information necessary to install the A0-3001 C.
Covered in this section are initial inspection, preparation for use, operating environment. and
repacking for shipment.
INITIAL INSPECTION
Inspect the shipping container for damage, if the shipping container or cushioning meterial is
damaged, it should be kept until the content of the shipment have been checked for
completeness and the shipment has been checked mechanically and electrically.
If the contents are incomplete, if there is mechanical damage or defect, notify the nearest
GOLDST AR representative.
If the shipping container is damaged, or the cushioning material shows signs of stress, notify
the carrier as well as the GO LOST AR representative.
Keep the shipping material for the carrier's inspection.
PREPARATION FOR USE
The A0-3001C requires a power source of 100V/120V/220V/240V AC ±10%,
50Hz/60Hz single phase, power consumption is 15 VA maximum.
LINE VOLT AGE SELECTION
CAUTION
Before switching on this instrument, make sure the instrument
it set to the voltage of the power source.
The voltage at which the unit has been factoy set, is
indicated on the rear panel voltage selector.
1. Disconnect the power cable.
2. Pull out the fuse holder FIG. (2).
3. Select operation voltage by orienting fuse holder to position desired voltage according to
'v'
make on the AC INLET.
4. Re-insert the fuse holder AC INLET. Be careful to select correct fuse value.
5

Advertisement

Table of Contents
loading

Table of Contents