Page 2
Pack Contents Atlas Louvre Frame Louvre Mechanism 8x98x796.DHSP-PT PARTS LIST PART NUMBER DESCRIPTION THK_mm WIDTH_mm LNG_mm MATERIAL Atlas Louvre Frame GAZ-LOUVER RAIL PAIR Aluminum_Generic 8x98x796.DHSP-PT Louvre Slat Profile DHSP-PT 30 mm Screw 3.5x30mm Steel, Galvanized 70mm Screw 4.5x70mm Screw Steel, Mild All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture Page 2...
Page 3
Assembly Steps You have been provided with a pair of louvre mechanisms. Notice that in each pair there is only one rail with handles. Each mechanism requires 9 blades that slide into place. Position the rails on the timber frame as shown on the diagram. Position the one with the handle on the right side, looking from the outside of the gazebo.