Environment Mounting Initial Startup Plan of Terminal Connections Connection of s::can Spectrometer Probe Connection of s::can ISE Probes and Sensors Connection of Cleaning Devices Connection of Main Power Supply Starting up of Operation Software con::cube Sleep Mode Operation of con::cube...
In spite of careful elaboration this manual may contain errors or incompletion. s::can does not assume liability for errors or loss of data due to such faults in the manual. The original manual is published in English and German by s::can. This original manual serves as the reference in case discrepancies occur in versions of the manual after translation into third languages.
This s::can product has been developed, tested and manufactured for electromagnetic compatibility (EMC) and according to applicable European standards, as defined in the declaration of conformity. CE-marks are applied on the device. The declaration of conformity related to this marking can be requested from s::can or your local s::can sales partner or can be downloaded from the s::can Customer Portal.
Triggering depending on water quality monitored In all types of applications, the respective acceptable limits, which are provided in the technical specifications in the respective s::can manuals, have to be observed. All applications falling outside of these limits, and which are not authorised by s::can Messtechnik GmbH in written form, do not fall under the manufacturer’s liability. The device must only be used for the purpose described in this manual. Use in applications not described in this manual, or modification of the device without written agreement from s::can, is not allowed. s::can is not liable for claims following from...
Page 9
D-315, 01-2020 Release Color graphical display with touch screen Screw to open housing cover Control LED (blue or red) 1 connector for s::can spectrometer probe 4 connectors for i::scan, ISE probes or sensors Ethernet (LAN) connector USB connector 2 cable glands M16 (optional for Profibus)
Immediately upon receipt, please check the received consignment for completeness on the basis of the delivery note and check for any possible damage incurred during shipping. Please inform the delivering dispatcher and s::can immediately in case of any damages in transit.
The correct installation of measuring instruments is an important prerequisite for satisfactory operation. Therefore the following checklist for the installation can be used to ensure that all sources for potential operational problems can be ruled out to the greatest possible extent during the installation, allowing the s::can monitoring system to operate properly. Installation site: Easy accessibility (mounting, sampling, functional check, demounting) Availability of sufficient space (probe / sensor, installation fitting, controller for operation, etc.)
Move the screwdriver upwards, which opens the cable clamp, and insert the wire (see middle picture below). Move the screwdriver downwards and remove it. Now wire is locked in the cable clamp (see right picture below). s::can recommends to use wires with isolated end sleeves for power supply and dater transfer. www.s-can.at...
If necessary, a con::nect box (B-23-xxx) has to be used to connect a further spectrometer probe. Connection of s::can ISE Probes and Sensors Alternative or additional to the spectrometer probe it is possible to connect ISE probes, i::scan and / or s::can sensors via the sys plug connectors located on the con::cube. These connectors are marked with no.5 in the figure of section 3.3. If an extension cable is used the total length of the probe’s cable should not be more than 40 m.
Once the cleaning device has been electrically connected, the device needs to be parameterised within the moni::tool software (please refer to manual moni::tool). Connection of Main Power Supply Connection of power supply for con::cube D-315-230 This type of work must be performed by authorised persons only (see section 2)!
Otherwise the connected probes might be damaged. Starting up of Operation Software Once the con::cube is connected to the power supply (see section 5.5), it will show the s::can logo for a few seconds while starting up. During the startup of moni::tool a message as shown on the right hand side is visible.
Current system date and time (clicking on this icon will display date / time of the last measurement) Clicking on the s::can logo will callup information on the installed software version and the controller Scrollbar to scroll the display up and down Direct Operation of con::cube Normally this direct operation is performed by a person standing in front of the con::cube and using the touch screen.
DHCP server of the network to which the con::cube is connected. The actual IP address of the con::cube will be displayed when pushing on the s::can logo on the lower right hand side of the moni::tool display.
Data Types All s::can interfaces use a common representation of data types. Each accessible data item can be allocated to one of the types shown in the table below. The type of a given item can always be found by checking the Modbus mapping. In addition the name of the data item are prefixed by one or two letters to indicate the data type. Data types which are non standard need...
Replace cleaning brush automatic cleaning. Datatransfer Compare the readings displayed on Check data transfer settings. the s::can terminal for operation with Use test function to check data those readings received by the used transfer. SCADA system. 30 / 42...
Return Consignment (RMA - Return Material Authorization) Return consignments of the s::can monitoring system, or parts of the system, shall be done in a packaging that protects the device (original packaging or protective covering if possible). Before returning a consignment, you have to contact your s::can sales partner or s::can customer support (support@s-can.at).