Description & Screws
10
Remove the DC VSS-PD BOARD. (Decomposition
order :
-
-
1
2
•
49" / 55" / 65"
Before Removing SMPS Board, You have
1
yo discharge the SMPS by using service
JIG.
•
If LED ON -> LED OFF discharge is
completed.
Measurement point
LED ON
<Before discharging>
Remove the SMPS Board pushing to the
2
arrow direction.
1.
Pushing Connector A.
2.
Insert the OPEN JIG like a picture.
3.
Gently lift up (Top Left corner) to
release the lock.
Gently lift up (Top Left corner) to release
3
the lock and Slide Board to the Right.
A/S-DISCHARGE-JIG
)
3
LED OFF
<After discharging>
Locking
Fixing Hole
BN81-12884A
Picture Description
3
Locking
Slide to the right to release the board
2
3
Bottom chassis Guide Fixing Hole
3. Disassembly and Reassemble
Measurement point
1
3-7