Operation; Loading Fasteners - PrimeSource Grip-Rite GRTCS250 Operator's Manual & Parts

15 coil siding & fencing nailer
Table of Contents

Advertisement

Available languages

Available languages

OPERATION

LOADING FASTENERS

A fastener can be driven unintentionally if the trigger and safety
bracket are activated at the same time. Always disconnect tool
from air supply before loading fasteners, making adjustments, or
performing any service on tool. Keep finger off trigger until ready
to drive a fastener.
LOADING INSTRUCTIONS
1. Depress door latch (A) and open
door. Swing magazine cover (B) open.
2. Check nail holder position, and adjust
as needed for nail length being driven.
3. To adjust, pull up on center post (C),
and twist holder to desired setting
using nail length indicators
inside magazine.
4. Place coil of nails over center post.
Uncoil enough nails to reach drive
channel, and pull out toward tool nose.
5. Place first nail in nail drive channel,
and position second nail between
teeth of feed pawl (D). Nail heads
must be aligned in nail head groove.
6. Close magazine cover, and latch
door securely.
7. Nailer is now loaded and ready
to be connected to an air supply
for operation.
DANGER
10

Advertisement

Chapters

Table of Contents
loading

Table of Contents