First Steps; Required Tools; Insert The Module; Mount The Heatsink - Cherry Theobroma Systems PUMA SOM-RK3399-Q7 User Manual

Powerful system-on-module
Hide thumbs Also See for Theobroma Systems PUMA SOM-RK3399-Q7:
Table of Contents

Advertisement

2 First Steps

This chapter provides instructions for getting the RK3399-Q7 EVK running after opening the box.

2.1 Required Tools

• PZ1 (Pozidriv) screwdriver

2.2 Insert the Module

Insert the RK3399-Q7 module at a 30-degree angle into the connector in the base board. Once fully inserted , push it down
until it rests on the standoffs and check alignment of the mounting holes.
Note: The module springs back into the 30-degree angle once released. This is expected, and alignment will be kept. The
module will be secured into place together with the heatsink.
Fig. 2.1: Module mounting

2.3 Mount the Heatsink

The heatsink has the thermal pad attached on the bottom. Peel off the red protective foil.
Fig. 2.2: Thermal pad protective foil
v1.7
Page 2

Advertisement

Table of Contents
loading

Table of Contents