Download Print this page

Garrick RG6C Manual page 4

Roll grooving machine

Advertisement

Pipe/Tubing Length
Dia. (in.)
1
2
/
2
3
1
3
/
2
4
1
4
/
2
5
6
Pipe Set-Up
1. Pipe or tubing longer than the specified maximum lengths listed in Chart above must be supported
with 2 pipe stands. The second pipe support should be located 3/4 of pipe length from roll groover.
Failure to use two stands may result in the unit tipping or the pipe falling.
2. Raise upper groove roll housing by placing pump release lever in RETURN position.
3. Square pipe and pipe support to roll groover making sure pipe is flush against drive roll flange.
4. Level pipe by adjusting pipe stand.
NOTE! If running machine in forward, offset pipe 1/2° away from operator.
NOTE! If running machine in reverse, offset pipe 1/2° toward operator.
Groove depth adjusting
1. Lock the release valve by rotating the knob clockwisely.
Fig 1
2. Position the depth adjusting nut to top position, mount the pipe to knurling roll. Swing up and
down the pump handle to actuate the upper roll, until it touches the pipe surface (make sure the
roll touches the pipe surface entirely).
Min. Length ( in./mm )
8/203
8/203
8/203
8/203
8/203
8/203
10/254
Lock the release valve
Upper roll touches the
pipe entirely.
3
Max. Length ( in./mm )
36/914
36/914
36/914
36/914
36/914
36/914
28/711

Advertisement

loading