Download Print this page

Advertisement

Quick Links

L E I S U R E R O O M A S S E M B L Y
I N S T R U C T I O N S
SUMMERSPACE LEISURE ROOM
Futureguard Building Products
101 Merrow Road, Auburn, Maine 04210
www.futureguard.net
IG-SQR-V2
Complete Field Assembly Instruction Guide
For assistance Call:
1 (207) 795-6536

Advertisement

loading
Need help?

Need help?

Do you have a question about the LEISURE ROOM and is the answer not in the manual?

Questions and answers

Summary of Contents for SUMMERSPACE LEISURE ROOM

  • Page 1 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S SUMMERSPACE LEISURE ROOM Complete Field Assembly Instruction Guide For assistance Call:...
  • Page 2: Before You Begin

    Skylift to lift the roof structure from the center cupola ring, assemble the walls under the suspended roof structure and then lower it onto the walls and secure. Contact SummerSpace for mor information. WALL CONSTRUCTION: Measure and mark the outside corner locations of the room on the patio or deck where the structure will be assembled.
  • Page 3 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Remove the FG200 and FG201 vertical fastener channel covers in the sliding window section.
  • Page 4 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Secure the panels together by passing an F25 Allen drive bolt through the panels in the pre-drilled locations in the sliding window section.
  • Page 5 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Install FG200 & FG201 Fastener Channel Covers. From the outside of the room, place the cover into its inner channel, then snap the outer into place.
  • Page 6 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Lay out the FG207 lower threshold in the appropriate orientation. The weepholes should be facing out Loosely screw F17B square nuts onto the protruding bolts at each end of the lower threshold, leaving enough room for the nut to slide into...
  • Page 7 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Slide the lower threshold into the verticals until it is flush with the vertical rails.
  • Page 8 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Loosely screw FG17B square nuts onto the protruding bolts at each end of the upper door track, leaving enough room for the nut to slide into the channel in the vertical.
  • Page 9 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Slide the FG211 upper door track into place so that both nuts are captured in the vertical channels.
  • Page 10 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Stand up the structure and attach the vertical channels to the previously installed panels in the predrilled locations using F25 bolts and F17B square nuts Snap the vertical FG200 &...
  • Page 11 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Adjust the Latch to the proper height to capture the door handle mechanism, then fully tighten the screws.
  • Page 12 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S SECURE THE PANELS TO THE FOUNDATION Remove the gasket on the bottom rail inserts of the kickplate section of each panel.
  • Page 13 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Place 3 evenly spaced fasteners directly in the v-notch in the bottom of each standard sized panel, two in any narrow-fixed panels, and 5 in the door threshold.
  • Page 14 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Reinstall the gaskets. Press them into place, making sure the smaller spline fits into the groove in the cover and the larger spline is towards the glass or aluminum kick plate.
  • Page 15: Roof Assembly

    L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S ROOF ASSEMBLY: Starting on one side, lift and place one of the A2 Soffit pieces on the top of one wall and center before clamping in place.
  • Page 16 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Align the completed soffit evenly with the inside of the walls. Secure the soffit to the tops of the room panels with four F9 self- drilling screws into each panel section.
  • Page 17 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Connect the B1 and/or B2 pieces using H Cupola Ring Corners. Predrill 1/8"...
  • Page 18 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Lift the cupola ring and place the attached Hip Rafter into its corresponding G soffit 90.
  • Page 19 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Before installing common and jack rafters, ensure the castings are fully seated into the ends of every rafter.
  • Page 20 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Starting from the center, lay out the Common Rafters on the marked locations of each Soffit and Cupola Ring side.
  • Page 21 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Secure the lower casting to the soffit using F21 square drive, self- drilling screws.
  • Page 22 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Working from the center outwards, lay out the Jack Rafters in their marked locations (23 1/4"...
  • Page 23 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S FABRIC INSTALLATION: Starting in the center of the frame, lay the J Top Fabric on one side of the Cupola Ring.
  • Page 24 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Move to the next corner and repeat the previous steps. The Fabric should be tight and symmetrical across the Cupola Ring.
  • Page 25 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Place the Cupola top from above. Stand on a ladder in the center of the Cabana, and have your partner pass the Cupola to you from one side.
  • Page 26 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Insert the Cupola's mounting rods into their pockets in the Cupola Ring.
  • Page 27 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Attach the N Vector Vent to the Cupola Ring with F9 self-drilling screws in the same pattern as the top fabric.
  • Page 28 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Loop the L Fabric Tension Straps over the tension rods at each pocket location, and then insert the plastic hook into the slot in the soffit.
  • Page 29 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Place the N1 valance stiffener onto the outside of the G corner 90 so that the top of the stiffener is hooked onto the top of the corner.
  • Page 30 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S Ensure proper alignment of all four corners of the Fabric, so that they are centered on the G Soffit Corners and the Fabric seams are centered on the Hip Rafters.
  • Page 31 L E I S U R E R O O M A S S E M B L Y I N S T R U C T I O N S FINISHING UP Install your screens. SummerSpace rooms are equipped with FlexScreens, allowing for easy installation and removal. Compress the screen, align with the track and release.