Aalberts Flamco LogoFloor CIC Installation & Service Instructions Manual

Floor distributor for 2 - 6 heating circuits

Advertisement

Quick Links

LogoFloor CIC
Floor distributor for 2 - 6 heating circuits
ENG
Installation / service instructions
www.flamcogroup.com/manuals

Advertisement

Table of Contents
loading

Summary of Contents for Aalberts Flamco LogoFloor CIC

  • Page 1 LogoFloor CIC Floor distributor for 2 - 6 heating circuits Installation / service instructions www.flamcogroup.com/manuals...
  • Page 2 Acronyms Male thread Female thread Nominal width Energy meter Union nut NexusValve Flow line Return line heating circuits Width across flats Chauffage Individuel Centralisé Manual LogoFloor CIC...
  • Page 3: Table Of Contents

    Table of contents Safety instructions ...................... 4 1.1 Intended use .........................6 1.1.1 Proper use ..........................6 1.1.2 Improper use ..........................6 1.2 Device designations .......................6 1.3 Hazard notes .........................7 1.4 What to do in the event of breakdown or leaks ..............8 1.5 Spare and wear parts ......................8 1.6 Requirements on trained engineers ..................8 1.7 Liability and copyrights ......................8...
  • Page 4: Safety Instructions

    1. Safety instructions Please follow these safety instructions carefully to prevent hazards and injury to persons and property. These operating instructions are primarily designed for the safe use and installation of the device and make no claims to completeness. These operating instructions describe the functionality of the device and are intended to provide information about the required safety instructions and to draw attention to possible hazards.
  • Page 5 Installation and construction of heating systems • DIN EN 4753, Part 1: Domestic water heaters, domestic water heating systems and tank domestic water heaters • DIN EN 12828 Heating systems in buildings – planning of heating systems • DIN 18421: Insulation of service installations •...
  • Page 6: Intended Use

    1.1 Intended use 1.1.1 Proper use The LogoFloor CIC enables hydraulic connections between heat generators and heating circuits for heat distribution. The LogoFloor CIC must only be used for this purpose in compliance with the maintenance and operating instructions and all relevant standards and regulations. All instructions in the operating instructions and the other applicable instructions must be followed and the maintenance plan adhered to.
  • Page 7: Hazard Notes

    1.3 Hazard notes The safety and warning information draws attention to residual hazards that cannot be avoided due to the design and construction of the device. Please always observe the measures shown for avoiding these hazards. Never alter or modify the device by yourself. Such work may only be carried out by qualified specialist personnel.
  • Page 8: What To Do In The Event Of Breakdown Or Leaks

    1.4 What to do in the event of breakdown or leaks • Close media lines using the appropriate valve. • Contact a suitably trained expert or customer service of the manufacturer. The device will only be cleared for operation again when the trained engineer has remedied the fault and restored the device to its intended condition.
  • Page 9: Functional Description And Setup

    2. Functional description and setup LogoFloor CIC are complete heating water manifolds/collectors with pressure-independent flow limiters or control valves (type PICV), shut-off ball valves, vent plugs, dirt traps as well as options for optional energy meters for each individual consumption unit (2-6 heating circuits). There is a connection option for a flow line temperature sensor and for a measuring computer, e.g.
  • Page 10: Design And Product Description

    2.2 Design and product description Legend Components Flow line shut off ball valve (for left or right installation) Enclosed* Return line shut off ball valve (for left or right installation) Enclosed* Heating supply manifold bar Heating return collector bar Manual vent plug FL, 3/8" Manual vent plug RL, 3/8"...
  • Page 11: Dirt Traps

    2.1 Dirt traps The dirt traps (10) in the flow line of each heating circuit protect the system against sludge and impurities. The filter can be removed and cleaned by dismantling the stopper with the O-ring. The LogoFloor must be depressurised beforehand! 2.2 Control valve NexusValve Vivax DN15 L/S The NexusValve Vivax valve ensures that pressure fluctuations from other areas of the system have no influence on the controlled heating circuit, and the flow thus remains constant.
  • Page 12: Valve Insert And Flushing Of The System

    2.2.1 Valve insert and flushing of the system It is recommended that the system is flushed after installing the LogoFloor CIC. To do this, remove the Vivax valve insert and replace it with the (enclosed) red presetting cap, which seals the valve during flushing.
  • Page 13: Flow Diagrams For Nv Vivax Dn15 L/S

    2.2.3 Flow diagrams for NV Vivax DN15 L/S The black line in the diagrams shows the setting of the Nexus Valve Vivax at a given flow. This flow is kept constant in a differential pressure range of 30...400 kPa at the Nexus Valve Vivax. For the NV Vivax DN 15L: Valve setting Ventileinstellung...
  • Page 14: Accessories

    2.2 Accessories Fig. Description Art. no. Valve insert NV Vivax DN15L for lower flow: 36…118 L/h MN80597.0015 Colour code: white Valve insert NV Vivax DN15S for standard flow: 90…450 L/h MN80597.0025 Colour code: red Ring spanner SW37 for removal/mounting of valve M80597.014 insert Nexus Vivax DN15-DN32 Note: Further accessories, such as servomotors, measuring computers for hydraulic balancing,...
  • Page 15: Mounting Dimensions

    3.1 Mounting dimensions Legend: A) Heating supply B) Heating return Dimensions L correspond to the number of heating circuits (HC): 2 HC 3 HC 4 HC 5 HC 6 HC L1 in [mm] L2 in [mm] We reserve the right to change designs and technical specifications of our products.
  • Page 16: Optional Energy Meter Installation

    3.2 Optional energy meter installation A energy meter may only be installed once the entire heating system has been properly flushed. LogoFloor CIC heating collectors are fitted with spool pieces (2x ¾" MT x L = 110 mm overall length) for energy meters, which must be removed before the energy meter is installed.
  • Page 17: Commissioning

    4. Commissioning Before using our products, they must be checked for suitability for the respective planned application. Further information can be found at: www.flamcogroup.com After installation or maintenance work and before commissioning, all media lines must be connected according to the existing plans and the intended condition must be established. Ensure that all materials, tools and other equipment required for the models have been removed from the device's working area.
  • Page 18: Maintenance And Service

    5. Maintenance and service Inspection, maintenance and service work on the station and heating system must be carried out and documented (in accordance with the relevant inspection guidelines) by a trained expert (installation company or customer service). The condition of wear parts must be checked and these must be replaced if necessary. During maintenance work, the safety instructions and residual dangers mentioned (see Section 1) must be observed! For recommissioning, please observe the points in Section 4.
  • Page 19 We reserve the right to change designs and technical specifications of our products.
  • Page 20 77-79 Parkview- 77 Blvd La Bataille de Stalingrad 69100 VILLEURBANE - FRANCE www.comap.aalberts-hfc.com www.flamcogroup.com Copyright Flamco B.V., Bunschoten, the Netherlands. No part of this publication may be reproduced or published in any way without explicit permission and mention of the source. The data listed are solely applicable to Flamco products. Flamco B.V. shall accept no liability whatsoever for incorrect use, application...