Advertisement

Quick Links

Advertisement

Table of Contents
loading

Summary of Contents for Floor iQ VLFR-D5.5

  • Page 2: Table Of Contents

    Table of contents 1. INTRODUCTION ..................................3 2. DEVICE DESCRIPTION ................................. 4 ......................................4 PPLICATION ......................................4 CCESSORIES ....................................... 4 AFETY FEATURE 3. SAFETY GUIDELINES ................................. 5 ..................................5 NVIRONMENTAL CONDITIONS ................................6 ERSONAL PROTECTIVE EQUIPMENT ....................................7 LECTRICAL HAZARDS ..................................... 7 IAMOND TUCK POINTS ....................................
  • Page 3: Introduction

    Please read this manual carefully before you start using the type VLFR-D5.5 self-propelled floor router. Keep the manual with your machine so that you can refer to the instructions and safety guidelines it contains...
  • Page 4: Device Description

    M-class or higher filter cartridge. We recommend at least a dual-motor vacuum cleaner. Accessories The VLFR-D5.5 can be fitted with different width tuck points. A size/distance guide and a laser are fitted as standard on this machine. For wet use, the machine has a special water connection.
  • Page 5: Safety Guidelines

    3. Safety guidelines Read the following safety instructions carefully before using the floor heating milling machine. Keep these safety instructions with the machine so that you can refer to them at any time Environmental conditions Do not use the floor heating milling machine if there are flammable flooring materials or gases at or near the work site.
  • Page 6: Personal Protective Equipment

    Loading and unloading The two transport wheels (to the rear) make it easier to move the machine during transport. Personal protective equipment You must wear the following personal protective equipment when working with the machine: Ear protection Safety shoes Safety goggles A class P3 dust mask Do not wear jewellery or loose clothing when working with this machine.
  • Page 7: Electrical Hazards

    Make sure you always plug the machine into a socket equipped with a circuit breaker. Diamond tuck points Always use Floor iQ diamond tuck points, which are specially developed for our floor heating milling machine and give the very best results. And extend the useful life of your machine.
  • Page 8: Warning Symbols

    Warning symbols Stickers with the following commands and warning pictograms are attached to the VLFR-D5.5 Hearing protection mandatory Instruction/manual Electrical voltage warning Crush hazard warning Laser light warning...
  • Page 9: Obligatory Checks Before Operation Of The Floor Heating Milling Machine

    4. Obligatory checks before operation of the floor heating milling machine The following checks are mandatory before using the floor heating milling machine type VLFR-D5.5 The milling machine must not be used if one or more of the checks show that either the power supply or the machine is not working completely correctly.
  • Page 10 Before turning on the milling machine: Check that your work environment is free and clean of obstacles. Check that the safety features work properly. Check that the control switches work properly. If not, replace these switches before you start. Check that the tuck point has no cracks or deformations. Do you see any damage? Then replace the tuck point immediately.
  • Page 11: Operation

    Never block the tuck point applying pressure to its side. Only use Floor iQ diamond tuck points, as they are specially developed for our machines and give the best results. And increase the service life of the saw shaft and other components. Failure to use the original tuck points will void the machine warranty.
  • Page 12: Mounting The Tuck Point

    Mounting the tuck point Assembling the is done in reverse order: tuck point 1) Slide the diamond onto the saw shaft (leave the ring on). tuck point 2) Turn the 6-sided nut on the saw shaft and tighten it with the spanners provided . 3) Carefully tilt the motor back and reattach the plastic nut to the electric lifting cylinder.
  • Page 13: Switching The Machine On And Off

    Switching the machine on and off Switching on: Before turning on the milling machine, always turn on your vacuum cleaner. Pull out the red emergency stop button (left side of electrical cabinet) till the yellow area is visible. Press the green start button on the top of the machine Increase the machine9s speed 5) Then set the desired cutting depth in 8blade down9 mode (for wet milling, turn on water switch and adjust dosing valve).
  • Page 14: Maintenance

    Ask your Floor iQ supplier for repairs to your machine. Minor repairs? Check them out on your personal service page. If repairs to the VLFR-D5.5 floor heating milling machine have not been carried out by a competently trained person, this will void your warranty.
  • Page 15: Technical Data

    This will always be lower than what is stated on the type plate. For further information, consult your genset supplier. Floor iQ reserves the right to change the above technical data without prior notice in connection with the ongoing innovative development of the machine.
  • Page 16 floor "...

Table of Contents