Summary of Contents for Red Mountain Valley 9027293
Page 1
10x20x8 Ft. ROUND SHELTER Owner’s Manual Items #9027293 Tools required for assembly (not included) Page 1...
Page 2
TABLE OF CONTENTS Important safety instructions…………………..……………………………………………………………………………………………………………….2 Intended use……………………..………………………………………………………………………………………………………………………………2 Parts list…………………………..………………………………………………………………………………………………………………………………3 Assembly preparation………………….…………………………………………………………………………………………………………………….…4 Assembly…………………………….…………………………………………………………………………………………………………….………...4 – 9 IMPORTANT SAFETY INSTRUCTIONS WARNING! ● To reduce the risk of serious injury, read the following safety instructions before assembling and using the product. ● No responsibility is accepted for damages or injuries resulting from improper installation or noncompliance with these instructions. ●...
Page 3
PARTS LIST Description Illustration Q’ty Roof Tube One Roof Tube Two Corner Bent Leg Center Leg Tube Corner Leg Tube Bottom Cross Rail Tube Cross Rail Tube(with male end) Cross Rail Tube Support Brace (1st half) Support Brace (2nd half) Tube Connector 3-Way Cross Rail Clamp 4-Way Cross Rail Clamp...
Page 4
ASSEMBLY PREPARATION Place all parts from the packaging box in a cleared area and arrange them on the ground in front of you. Remove all packaging materials and place them back in the box. Do not dispose the packaging materials until assembly is complete. ...
Page 5
ASSEMBLY Step 1: Frame Assembly Diagram B Select level and suitable location for your shelter. Assembly the two End Ribs a. Follow Diagram B connecting the 7 tubes together (1pc tube #1, 2pcs tube #2, 2pcs tube #4 & 2pcs Bent Legs #3) to form 1 End Rib.
Page 6
ASSEMBLY Diagram E B Insert the male end of tube #7 into tube #8 Connect the two parts of Support Brace (#9 & #10) by Fittings (#14, #17 & #18) D Fix one end of the Support Brace on tube #3 by Fittings (#15, #17 &...
Page 7
ASSEMBLY Diagram H 5. Square and Anchor the Frame a. Check the measure of frame both 10' at the front and back corners, as well as the center. b. Take a diagonal measure as shown in Diagram H. When these two measures are equal the frame is square. Adjust the frame until they are equal to within 1".
Page 8
ASSEMBLY Diagram M e. Disconnect the cross rail tube#8 from the top roof tube#1.Pull and insert tube #8 into the hole on the top of the door panel. Connect again. Repeat the same procedure to insert the side cross rails. See Diagram M.
Page 9
ASSEMBLY Diagram Q Step 3: Attaching the bottom cross rails a. Slide the bottom cross rails #6 through the tube sleeves on each side of the Roof Tarp #25. Assemble the bottom cross rails #6 to the ten legs with clamps #12, #13 and fixings #15, #17, #18 and tighten slightly.
Page 10
Distributed by Forcome (shanghai) Co., Ltd South Sizhuan Road,Shanghai 201612 Made in China Page 10...
Page 11
10x20x8 Pieds BOUCLIER ROND Mode d’Emploi Article #9027293 Outils requis pour l'assemblage (non inclus) Page 1...
Page 12
SOMMAIRE Instructions de sé curité …………………..…………………………………………………………………………….…………………………………………………………….2 importantes ……………………..……………………………………………………………………………..………………………………………………………2 Usage prévue …………………………..………………………………………………………………………..……………………………………………………3 Liste des pièces Préparation de l’assemblage ………………….…………………………………………………………………..……………………………………………….…4 …………………………….………………………………………………………………………………….……………………...………………...4 – 9 Assemblage INSTRUCTIONS DE SÉCURITÉ IMPORTANTES AVERTISSEMENT! ● Pour réduire le risque de blessures graves, veuillez lire les instructions de sécurité suivantes avant d'assembler et d'utiliser ce produit. ●...
Page 13
LISTE DES PIÈCES Description Illustration Quantité Tube de Toit Un Tube de Toit Deux Jambe Courbée du Coin Tube de Jambe Central Tube de Jambe du Coin Tube de Rail Transversale Inférieure Tube de Rail Transversale (avec l’extrémité masculin) Poutre Transversale Inférieure Plaque de tension (1er demi) Plaque de Support (2e demi) Connecteur de Tube...
Page 14
PRÉPARATION D’ASSEMBLAGE Placez tous les pi ces de l’emballage sur un terrain propre et arrangez-les sur le sol devant vous. è Retirer tout le matériel d'emballage et le remettre dans la boî te. Ne jetez pas le matériel d'emballage tant que l'assemblage n'est pas terminé.
Page 15
ASSEMBLAGE Étape 1: Assemblage du Cadre Choisissez une location horizontale et appropriée pour votre bouclier. Diagramme B Assembler les deux côtes d'extrémité Suivre le Diagramme B pour raccorder les 7 tuyaux ensemble.(1 piè ce de tube # 1, 2 piè ces de tube # 2, 2 piè...
Page 16
ASSEMBLAGE Diagramme E B insérez l'extrémité extérieure du tube 7 dans le tube C Connectez les deux parties du support (# 9 & # 10) avec des raccords (# 14, # 17 & # 18) D Fixez une extrémité du support au tube 3 avec des raccords (# 15, # 17 &...
Page 17
ASSEMBLAGE 5. Carrer et Ancrer le Cadre Diagramme H a. Vérifier que les dimensions des coins avant et arrière et du centre du cadre sont de 10'. b. Effectuer des mesures diagonales comme indiqué à la Diagramme H. Lorsque les deux dimensions sont égales, le cadre est carré . Ajustez les cadres jusqu'à...
Page 18
ASSEMBLAGE Diagramme M e. Déconnectez le tube de rail transversal #8 du tube de toit #1. Tirez et inserez le tube #8 dans le trous en haut du panneau de porte. Connectez-le à nouveau. Répétez la mê me procé dure pour insérer le rail transversal latéral.
Page 19
ASSEMBLAGE Étape 3: Attachez le rail transversal inférieur Diagramme Q a. Glissez le rail transversal infé rieur #6 à travers les manchons de tube dans chaque cô té de la Bâ che du Toit #25. Assembler le rail transversal infé rieur #6 sur les 10 jambes avec clips #12, # 13 et des raccords #15, #17, #18.
Page 20
Distribué par Forcome (shanghai) Co., Ltd Route du Sud du Sizhuan, Shanghai 201612 Fabriqué en Chine Page 10...
Need help?
Do you have a question about the 9027293 and is the answer not in the manual?
Questions and answers
Whats the warranty for the fabric
Damages caused by improper anchoring are not included in the warranty.
This answer is automatically generated