UfiSpace M3000-14XC Hardware Installation Manual

Fronthaul multiplexer

Advertisement

Quick Links

M3000-14XC
Fronthaul Multiplexer
Hardware Installation Guide
R1.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M3000-14XC and is the answer not in the manual?

Questions and answers

Summary of Contents for UfiSpace M3000-14XC

  • Page 1 M3000-14XC Fronthaul Multiplexer Hardware Installation Guide R1.1...
  • Page 2: Table Of Contents

    Management port LED ......................20 11 Initial System Setup ......................21 12 Cable Connections ......................22 Connecting the USB Extender Cable ................... 22 Connecting a Cable to the ToD Interface ................22 Connecting the GNSS Interface ................... 23 M3000-14XC Hardware Installation Guide | i...
  • Page 3 Connecting the 1PPS Interface .................... 23 Connecting the 10MHz Interface ..................24 Connecting a Cable to the BITS Interface ................24 Connecting the Transceiver ....................25 13 Cautions and Regulatory Compliance Statements .............. 26 M3000-14XC Hardware Installation Guide | ii...
  • Page 4: Overview

    DU resources efficiently and to streamline upgrading process when service providers are increasing its service capacity. The M3000-14XC is future-proofed with a powerful 4-core processor, a programmable FPGA, 10GE/25GE interfaces, and full timing features supporting IEEE 1588v2 and SyncE, which enables service providers to manage up to 64 RUs.
  • Page 5: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None M3000-14XC Hardware Installation Guide | 2...
  • Page 6: Installation Environment Requirements

    19 inch (48.3cm) wide racks. The rack mount brackets can be installed at the front or in the center of the M3000-14XC. The depth of the M3000-14XC chassis is 9.84 inches (25cm) without the field replaceable units (FRUs). To accommodate the air inlet and front cabling, a recommended minimum space clearance of 6 inches (15.2cm) for...
  • Page 7: Preparation Check List

    19” (48.3cm) in width, and a depth of 15.84 inches (40.23cm) Thermal requirement M3000-14XC working temperature is -40 to 65°C (-40°F to 140°F), airflow direction is front-to-back Installation tools required #2 Philips Screwdriver, 6-AWG wire stripper, and crimping tool...
  • Page 8: Package Contents

    (AC version only) (0.46lb (207g)/pcs) RJ45 to DB9 Female 95.98” (2438mm) 1 pc 0.23lb (105g)/pcs Cable 2 x Screw M4*L25mm 0.009lb (4.5g)/2sets Screw Kit for wall 2 sets mount 2 x D8*L25 Rubber Plug 0.005lb (2.25g)/set M3000-14XC Hardware Installation Guide | 5...
  • Page 9: Component Physical Information

    Screw kit for rack mount bracket 0.02lb (7g) Screw kit for wall mount 0.005lb (2.25g) M3000-14XC (W x D x H) 17.32” x 9.84” x 1.71” (440 x 250 x 43.5mm) Dimension PSU (W x D x H) 1.99” x 8.31” x 1.58” (50.5 x 211 x 40.2mm)
  • Page 10: Identifying Your System

    4 Identifying Your System M3000-14XC Overview Figure 5. M3000-14XC Hardware Installation Guide | 7...
  • Page 11: Dc Version Psu Overview

    Power supply unit (PSU) with 1+1 redundancy. Hot swappable, field replaceable unit (FRU). Figure 6. AC Version PSU Overview Power supply unit (PSU) with 1+1 redundancy. Hot swappable, field replaceable unit (FRU). Figure 7. M3000-14XC Hardware Installation Guide | 8...
  • Page 12: Fan Overview

    Port Overview Port ID Form Factor Maximum Support Distance Support Speed 0 ~ 7 SFP28 6.21mi (10km) 10/25G 8 ~ 11 SFP28 6.21mi (10km) 10/25G 12 ~ 13 QSFP28 6.21mi (10km) 40/100G Figure 9. M3000-14XC Hardware Installation Guide | 9...
  • Page 13: Rack Mounting

    8 M4.0*L6.5mm screws provided with the package. Figure 10. 2. Secure the equipment onto the rack posts. Mark the location on both posts to ensure it is leveled before securing the equipment onto the rack. (See Figure below). Figure 11. M3000-14XC Hardware Installation Guide | 10...
  • Page 14 For rack post widths wider than 19”, different brackets are available upon request (See Figure below). Figure 12. M3000-14XC Hardware Installation Guide | 11...
  • Page 15: Wall Mounting

    Mark the location on the wall. Drill two holes to insert 2 D8*L25 rubber plug into the wall. Secure the 2 M4*L25 Screw into the wall through the rack mount bracket. (See figure below) Figure 14. Figure 15. M3000-14XC Hardware Installation Guide | 12...
  • Page 16: Installing Power Supply Units

    1. Locate the release tab on the PSU. Then press and hold down the release tab to unlock the PSU from the power bay. 2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay. DC Version: AC Version: Figure 17. M3000-14XC Hardware Installation Guide | 13...
  • Page 17 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Illustrations are for reference purposes only. Actual scenario and equipment may differ. DC Version: AC Version: Figure 18. M3000-14XC Hardware Installation Guide | 14...
  • Page 18: Grounding The Equipment

    3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 19. M3000-14XC Hardware Installation Guide | 15...
  • Page 19 6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the equipment. Illustrations are for reference purposes only. Actual scenario and equipment may differ. Figure 20. Figure 21. Figure 22. M3000-14XC Hardware Installation Guide | 16...
  • Page 20: Connecting Power

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the M3000-14XC is designed to support 1 + 1 power redundancy. 2. Attach the power cable.
  • Page 21: Ac Version

    AC. It is recommended to ensure that enough power is reserved from the power distribution system before installation. Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the M3000-14XC is designed to support 1 + 1 power redundancy.
  • Page 22: Verifying System Operation

    System timing core is in acquiring state or holdover mode. System timing synchronization fail. Blinking Yellow **Note: need NOS to activate this feature Reserved Solid Green System boot complete Blinking Green Reserved Solid Yellow Reserved Blinking Yellow System boot not complete M3000-14XC Hardware Installation Guide | 19...
  • Page 23: Psu Fru Led

    Management port LED LED Condition Equipment Status Left LED 1G no link Solid Green 1G link-up Blinking Green 1G TX/RX activity Right LED No activity Solid Amber 10M/100M link-up Blinking Amber 10M/100M TX/RX activity M3000-14XC Hardware Installation Guide | 20...
  • Page 24: Initial System Setup

    Flow control: None 4. Login to the device. After the connection is established, a prompt for the username and password displays. Enter the username and password provided by our sales to access the CLI. M3000-14XC Hardware Installation Guide | 21...
  • Page 25: Cable Connections

    1. Connect one end of a straight-through Ethernet cable to the GNSS unit 2. Connect the other end of the straight-through Ethernet cable to the port marked “TOD” located on the front panel of the equipment. Figure 29. M3000-14XC Hardware Installation Guide | 22...
  • Page 26: Connecting The Gnss Interface

    Connect an external GNSS antenna with an impedance of 50 ohms to the port marked “GNSS ANT” located on the front panel of the equipment. Figure 30. Connecting the 1PPS Interface Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “1PPS”. Figure 31. M3000-14XC Hardware Installation Guide | 23...
  • Page 27: Connecting The 10Mhz Interface

    1. Connect one end of a shielded RJ48 cable to the port labelled “BITS” located on the front panel of the equipment. 2. Connect the other end of the cable to the BITS patch or demarcation panel. Figure 33. 3. Below is the pinout for BITS port Figure 34. M3000-14XC Hardware Installation Guide | 24...
  • Page 28: Connecting The Transceiver

    3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. M3000-14XC Hardware Installation Guide | 25...
  • Page 29: Cautions And Regulatory Compliance Statements

    The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. <電源コードセットに関する使用上の注意事項> 付属の「AC電源コードセット」は、本製品専用のものです。他の電気機器には絶 対に使用しないでください。 M3000-14XC Hardware Installation Guide | 26...
  • Page 30 この装置は、クラスA機器です。この装置を住宅環境で使用すると電波妨害を引き 起こすことがあります。この場合には使用者が適切な対策を講ずるよう要求される ことがあります。 M3000-14XC Hardware Installation Guide | 27...
  • Page 31 www.ufispace.com...

Table of Contents