Advertisement

Quick Links

THOR 40DS-P
Shenzhen Growatt Dynocharge Energy Thchnology Co.,Ltd.
DC charger QUICK installation guide
GROWATT-ATESS Industrial Park,No.23 Zhulongtian Road ,Shuitian Community,
Shiyan Street, Baoan District, Shenzhen
T +86 755 2747 1900
E info@ginverter.com
W www,ginverter.com
Revised date:2023-12-25

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the THOR 40DS-P and is the answer not in the manual?

Questions and answers

Summary of Contents for Growatt THOR 40DS-P

  • Page 1 THOR 40DS-P Shenzhen Growatt Dynocharge Energy Thchnology Co.,Ltd. DC charger QUICK installation guide GROWATT-ATESS Industrial Park,No.23 Zhulongtian Road ,Shuitian Community, Shiyan Street, Baoan District, Shenzhen T +86 755 2747 1900 E info@ginverter.com W www,ginverter.com Revised date:2023-12-25...
  • Page 2: Table Of Contents

    4.3 Sign in and log out ......10 All rights reserved. Growatt has the final interpretation of this user manual. The 5.EV Charger Internet Configuration...
  • Page 3: Product Description

    Check the charger cable and case regularly for damage. If the product is defective or damaged, suspend use and contact Growatt for advice. Do not open, repair, tamper or modify the charger in any way without.
  • Page 4 1.Insulating plate 2.Motherboard ; DC CHARGING PILE 3.SECC (PLC communication); THOR series DC dual output charger THOR-40DS-P 4.Power meter; Rated output power 5.SPD; 40KW 6.AC input terminal block. Terminal definition is (①L1;②L2;③L3; ④N;⑤PE )from 400V(3P+N) Rated input voltage Rated input voltage left to right;...
  • Page 5: Installation And Wiring

    2.Packing list Name Remark DC Charger User manual Quality certificate Cable holder User card Hex head expansion bolt, M8*80/304 stainless steel 2. Loosen the 2 screws at the bottom of the charging equipment that fixes the mounting bracket, keep them properly for later use. Place the mounting bracket Already installed on the rear side of the onto the bolts just installed and screw the nuts and washers.
  • Page 6: App Download,Register,And Login

    3. After the mounting bracket and cable hooker is fixed, place the charging equipment onto the mounting bracket, with the outward bent part inserted to the slot on the rear side of the charging equipment. Lock the charging equipment onto the bracket at the bottom using the 2 screws.
  • Page 7: Register

    Users can scan the QR code (Android and IOS ) with the WeChat, or go to the App Store and Google Play to search for ShinePhone or log in to our monitoring website server.growatt.com or server-cn.growatt.com to download. 4.2 Register Before using ShinePhone APP the first time, the user must register an account in advance.
  • Page 8: Sign In And Log Out

    4.3 Sign in and log out If the users haven’t build the “power plant” before and click “add device”, the app will remind you to add a plant firstly, and the app will allow to “add device” after finishing filling the information of the plant . The user can log in the APP through the existing account and password.
  • Page 9: Wifi Configuration

    5.1 WIFI Configuration a) Choose a related power plant after adding the device (Note: a power plant is required to build before adding the EV Charger). b) Enter the serial number of the EV charger or scan the Bar/QR code to add the EV charger.
  • Page 10: Network Cable Connection Configuraion

    Note: If the users want to set the static IP mode 5.2 Network Cable Connection Configuration 1.Click “go to set” during (d) step and make sure the network cable is a) Choose a related power plant after adding the device (Note: a power plant is disconnected ;...
  • Page 11: Configuration

    5.3 4G Configuration 5.4 AP Mode Configuration If the EV charger is a 4G model, then the user can click the “skip” If the network connection is abnormal, the users can use the AP mode to reset the network or do some basic setting directly during the page of network configuration methods.
  • Page 12: Operation Instruction

    Note:Network setting; connect to wifi; The wifi name and wifi password should be entered manually .Before entering the RFID mode: wifi name or wifi password ,users should enter ‘000000’ first and choose the item Charging can only be initiated or ceased by swiping RFID card. again to input the name or password of the wifi.
  • Page 13: Lcd Interface Introduction

    6.2 LCD interface introduction The charging equipment is equipped with a 7 inch industrial-grade resistor type touch panel. The display content is as below. System parameters page. When powered up, the charging equipment will show this display, Network parameters page, used to set network related parameters of back-office server and the charging Charging information, which will...
  • Page 14: Ev Charger Workmodes

    7.EV Charger Work Modes Charging Capacity Reservation Users can set the target charging capacity(kWh) and the start time through clicking 7.1 Fast Mode “energy”, and also can enable “every day” to make it to work following that strategy Plug & Charge to work all the time Click “charge”...
  • Page 15: Pv Linkage Mode

    If the Eastron SDM630 mster is used, refer to the following cable connections 7.2 PV Linkage Mode Introduction Driven by solar, charge your car with renewable energy, the EV will be charged by the surplus solar power dynamically, combining PV and EV charger together to maximize the solar self-consumption rate and cut your bill.
  • Page 16 APP Operation The PV linkage mode require the EV charger to connect with an external current sensing device, and choose the corresponding configuration *(CT or meter type, choose the right brand of the meter type, Acrel or Eastron) Enabling this function will allow the EV charger to take power from the grid. During the solar power insufficient period, the EV charger will operate according to the default minimum charging power.For single phase EV charger the default value is 1.4kW.As for three phase EV charger, it’s 4.1kW.Once allowing the power take...
  • Page 17: Off-Peak Modes

    7.3 Off-peak modes Introduction Once enable the Off-Peak mode, the EV charger will automatically charge the EV when it’s at off-peak time to reduce the electricity bill. Users also can customize their low-rate charging time in the off-peak mode page Note: Users need to input the charging rates in the setting page manually before enabling off-peak modes Note: Under the Off-peak mode,the EV charger will automatically start charging at...
  • Page 18: Load Balancing Function

    Smart Boost Function It’s useful to guarantees EV’s battery capacity before a set time when the off-peak time is not long enough. While users enable the smart boost function and set “pick-up time” and “preset electricity”, the EV charger will charge the EV with a target kWh figured by a set time, it may draw the power from the grid to guarantee the EV’s battery capacity when the off-peak time is not long enough.
  • Page 19: Other Settings

    8.Other Settings Network setting: network connection method, network mode setting, gateway settings, subnet mask, DNS address. The setting page includes basic information, network setting, pile setting, load balancing and authorization management. ●Basic information: EV charger ID, EV charger name, country and city, version number.
  • Page 20: Record

    ●Version upgrade Users can check the latest version of the charger’s firmware and the current version they are used now.If there is new version,users can upgrade by clicking the “Upgrade”. ●Authorization management: 9.Record Permissions: it’s useful for authorization management, add and authorize the other account which can use the EV Charger directly.
  • Page 21: Data

    11.Configuration through internal web b)Appointment record: Display the list of charging schedules that have been set before. (Service Tool ) After the installation and wiring is done, connect the Charger to a computer and configure parameters via the web browser of the computer, then the Charger can be ready for use.
  • Page 22: Configure Parameters

    3. Right-click on Local Area Connection and click on Properties. 5.Select "Use the following IP address" and enter the IP address, Subnet Mask, Default Gateway. Click OK and close the Local Area Connection properties window. 4. Select Internet Protocol Version 4 (TCP/IPv4) and click on Properties. 11.2 Configure parameters Connect the charger to a computer via a network cable.
  • Page 23 Fig.1 (2)Charger ID, this is the unique identification of the charger. If the charger is to be connected to Growatt back-office server, this ID must be set as the serial number Fig.4 on the nameplate of charger. Otherwise the charger cannot be registered on the server.
  • Page 24 Fig.11 (12) Over temperature protection value, not suggested to change. (9)Server URL is to set the domain name or IP address of the back office server to be connected.The domain name of Growatt server is “ ws://evcharge.growatt.com:80/ocpp/ws ”; IP address is “...
  • Page 25 (18) Relieve the power grid pressure, authorized charging, after the set time to (15) DC residual current sampling value calibration. Enter 0 and press "Set and Reboot " to calibrate the DC RCD ring. Display real- start. time detection value of DC residual current.keep the default RCD level.
  • Page 26 (22)Set the load balancing, sampling instrument type and address. Fig.27 (28) Set the tariff for charging energy. Fig.22 Fig.28 (29) Set daylight saving time for the charger to switch automatically. (23) Set the display language of the charger LCD. Fig.29 Fig.23 (30) The time for automatic charging in Plug and charge mode.
  • Page 27: Update By Sd Card

    1. Update by SD card 2. Update on parameter setting page Note:The firmware package used for the upgrade is provided by Growatt, and the internal operation and maintenance personnel check the version of the upgraded firmware package at least once every quarter, and the new firmware is pushed to 4.
  • Page 28: Update On Parameter Setting Page

    3. Click the ”Browse” button and select the firmware file. Click “Upload”, then update will start automatically. During the update, the LED indicator will behave as below, First flash red and goes out with a short beep sound, during this period the firmware file is transmitted to the charger’s flash memory from the computer;...
  • Page 29: Troubleshooting

    12. Troubleshooting AC Input Overvoltage! 12.1 Troubleshoot by LCD display AC Input Undervoltage! BMS communication fault! Fault description 12.2 Firmware update fails Emergency stop is pressed! 12.2.1 Firmware update failure with SD card: RFID communication fault! a. Check if the capacity is over 4GB bytes,please use a SD card of less than 4GB to retry;...
  • Page 30 a. Please check and input the correct WiFi SSID and password to retry; If you check the WiFi setting on the APP, please turn off and back on the charger and connect your mobile to the WiFi emitted by the charger for checking and setting. d.
  • Page 31: Cannot Access Parameter Setting Page

    Check if server address is correct in the“Server URL” field. The correct setting is : ws://evcharge.growatt.com:80/ocpp/ws. 12.4 Cannot access parameter setting page (4). Select Internet Protocol Version 4 (TCP/IPv4) and click on Properties.
  • Page 32: Charging Issue

    12.5 Charging issue If charging cannot start after the car is plugged in. a. Check if the red emergency stop button is pressed; b. Check what charge mode is being used. APP/RFID: Charge can only be started/stopped by APP or RFID card, and the charger must be connected to the back office server already;...
  • Page 33: Specification

    13. Specification IP 54 IP degreel Working environment -25℃~+50℃ derate since 50℃ Model THOR 40DS-P Dimension(mm) 632*300*858(W*D*H) 5%-95% Relative humidity 84kg Weight(kg) ≤2000m, derate for higher than 2000m Altitude Display Cooling method Forced air cooling Casing material Stainless steel&acrylic sheet...
  • Page 34: Annex

    Fig14-1. Main circuit diagram 14. Annex 14.2 Contact 14.2 Contact 14.1 Electrical diagram Company Name:Shenzhen Growatt Dynocharge Energy Technology Co., Ltd. Address: 4th Floor, No.23 Zhulongtian Road, Shuitian Community, Shiyan Street, Baoan, District, Shenzhen Website: www.ginverter.com Service line: +86 755 2747 1900...
  • Page 35: Warranty64

    At the same time, the Shenzhen Growatt New Energy Co., Ltd. This is to declare that the products listed nameplate on the product should be clearly visible, otherwise the warranty claim below have been developed, constructed and manufactured according to the might not be accepted.

Table of Contents