MTO 330 Quick Start Guide
1) Connect Leads / Power / Ground
Before
2) Turn Instrument On
3) Wait for the Menu to Display. Click the large button to Launch (Legacy MTO will automatically
launch PowerDB)
Revised 6/18/2014
After
To Ground Source
To High Voltage
Primary Winding
To Low Voltage
Secondary/Tertiary Winding
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the MTO 330 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Megger MTO 330

  • Page 1 MTO 330 Quick Start Guide 1) Connect Leads / Power / Ground Before After To Ground Source To High Voltage Primary Winding To Low Voltage Secondary/Tertiary Winding 2) Turn Instrument On 3) Wait for the Menu to Display. Click the large button to Launch (Legacy MTO will automatically...
  • Page 2 MTO 330 Quick Start Guide 4) Fill out the form (this is form MTO WINDING RESISTANCE - 56353) REQUIRED RECOMMENDED New forms can be selected by clicking then 5) Left Click/Hit Enter on to View/Change Instrument Settings OPTION NOT AVAILABLE ON...
  • Page 3 MTO 330 Quick Start Guide 7) Start the Test 2. RIGHT CLICK CELL TO RUN TESTS ON INDIVIDUAL WINDING OF TAP 1. LEFT CLICK TO START NOT AVAILABLE ON NON-TOUCHSCREEN LEGACY INSTRUMENT (OR ARROW TO ROW AND HIT VALUES FILLED IN FROM STEP 4 RECOMMENDED 3.
  • Page 4 MTO 330 Quick Start Guide 8) Run the Test LEFT CLICK/HIT ENTER TO START 9) Finish the Test LEFT CLICK/HIT ENTER TO FINISH (WINDOW WILL CLOSE AUTOMATICALLY WHEN COMPLETE IF SELECTED IN STEP 5) Revised 6/18/2014 Page 4...
  • Page 5 MTO 330 Quick Start Guide 10) Save Results LEFT CLICK/HIT ENTER TO SAVE Type in File Name Here Once file is saved, file will automatically save after each test (without prompt) Revised 6/18/2014 Page 5...