MTE PTS 400.3 PLUS Operation Manual

Modular three-phase portable test system
Table of Contents

Advertisement

PTS 400.3 PLUS
Modular three-phase
Portable Test System
Operation Manual
PTS 400.3 PLUS Operation Manual_R02
06.2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PTS 400.3 PLUS and is the answer not in the manual?

Questions and answers

Summary of Contents for MTE PTS 400.3 PLUS

  • Page 1 PTS 400.3 PLUS Modular three-phase Portable Test System Operation Manual PTS 400.3 PLUS Operation Manual_R02 06.2017...
  • Page 2 D-21438 Brackel Germany Phone: +49-4185-5857-0 Fax: +49-4185-5857-68 Email: support@emh.de Copyright MTE Meter Test Equipment AG All rights reserved. The contents of this manual are subject to change without notice. All efforts have been made to ensure the accuracy of this publication but...
  • Page 3: Table Of Contents

    3.2.1 PPS 400.3-12A ......................18 3.2.2 PPS 400.3-120A ......................19 PTS 400.3 PLUS interconnections between PRS 600.3 and PPS 400.3 ......21 3.3.1 How to separate the two modules .................. 23 Operation principles ......................24 Display and control elements ....................24 4.1.1...
  • Page 4 Switch RCS telegram ON / OFF ................101 Load point adjustment with regulators ............... 102 User defined slider settings ..................103 Reference meter .................... 106 Reference meter settings ................... 106 8.1.1 Selection of voltage and current range ..............109 PTS 400.3 PLUS Operation Manual_R02 Page 4/306...
  • Page 5 Mark positioning setup ..................175 Run automatic or step by step test ................175 9.2.1 Test sequence and meters setup ................ 179 9.2.2 View test step results ..................180 Preparation of test run ....................... 181 PTS 400.3 PLUS Operation Manual_R02 Page 5/306...
  • Page 6 UI values ......................223 13.2.2 PQS values ...................... 223 13.2.3 UIPQS values ....................224 Run a Power Quality Online Measurement ............224 Power Quality Recording ................... 227 Run a Power Quality recording ................228 PTS 400.3 PLUS Operation Manual_R02 Page 6/306...
  • Page 7 Recommended test points for active energy 4-wire measurements ........ 237 Meter constants of impulse outputs ................239 Connection examples ......................242 PTS 400.3 PLUS connection examples ................242 17.1.1 Testing of a direct connected 4-wire meter up to 12A ..........242 17.1.2...
  • Page 8: Safety

    This product has to be only used by qualified personnel practicing applicable safety precautions.  Use caution during installation and use of this product; high volt- ages and currents may be present in circuit under test.  Local safety regulations must be observed. PTS 400.3 PLUS Operation Manual_R02 Page 8/306...
  • Page 9: Introduction

    Introduction General PTS 400.3 PLUS Three-phase, fully automatic test system with class 0.02% reference standard and integrated three-phase current and voltage source available in two versions. For many years, electricity utility companies have realized the importance of performing measurements and tests, on-site, at the metering installation.
  • Page 10  Active, reactive and apparent power measurement per phase and sum of all phases  Phase angle, power factor and frequency measurement  Burden measurement and ratio test of PTs and CTs  Measuring of current, voltage and power transducers PTS 400.3 PLUS Operation Manual_R02 Page 10/306...
  • Page 11: Pps 400.3 Portable Power Source

    Controlling the source is carried out either by use of the PRS 600.3 or via RS 232 C. The PPS 400.3 source is developed such as to be fully operational without the reference meter. PTS 400.3 PLUS Operation Manual_R02 Page 11/306...
  • Page 12: Pts 400.3 Plus Portable Test System

    PTS 400.3 PLUS Portable Test System The PTS 400.3 PLUS system consists of a reference standard PRS 600.3 of class 0.02% and a pro- grammable power source PPS 400.3, which is available in two versions of up to 12 A or 120 A.
  • Page 13: Communication And Operation

    Portable Power Source PPS 400.3 which is in this application controlled via blue-tooth. Extended functionalities The PTS 400.3 PLUS allows to use several clamp-on CTs in the range of 100 A up to 3000 A or sen- sors for voltage and current measurements on high voltage potential. The clamp-on CTs and high voltage sensors are “clamped”...
  • Page 14 Clip-on CTs UCT 1000.3 for measurements in the range of 1 A up to 1000 A Flexible current sensors UCT LEM.3 FLEX 3000 for current up to 30 / 300 / 3000 A PTS 400.3 PLUS Operation Manual_R02 Page 14/306...
  • Page 15: Connectors And Control Elements

    Left 8.4” color TFT VGA display (640 x 480 pixels) with touch screen Right 8.4” color TFT VGA display (640 x 480 pixels) with touch screen Pen for touch screen operation Top view PTS 400.3 PLUS Operation Manual_R02 Page 15/306...
  • Page 16 • Set of 3 UCT LEM.3 flexible current probes FLEX 3000 (30/300/3000A) (OPTION) • Primary current sensor AmpLiteWire 2000A (OPTION) • Primary voltage sensor VoltLiteWire 40kV (OPTION) Connector type: 14 pole dedicated Redel socket, suitable for new MTE clamp-on cur- rent transformers and current sensors with voltage outputs and serial communication interface.
  • Page 17 The safest procedure is to switch off the PRS 600.3 before removing or inserting the CF card. Back view Supply voltage connection to portable power source PPS 400.3 PTS 400.3 PLUS Operation Manual_R02 Page 17/306...
  • Page 18: Pps 400.3 Connectors And Control Elements

    Fuses: 2 x 4 A / 250 V slow blow (below the cover) Top View Blue tooth antenna for wireless communication Current-outputs I1, I2, I3 (red) Type: 4 mm insulated sockets Current-back wire I1, I2, I3 (black) Type: 4 mm insulated sockets PTS 400.3 PLUS Operation Manual_R02 Page 18/306...
  • Page 19: Pps 400.3-120A

    Connection: 9 pole SUB-D connector Pin 2  TxD Pin 3  RxD Pin 5  GND Pin 7  CTS Pin 8  RTS Interrupt button 3.2.2 PPS 400.3-120A Front view Supply voltage connection PTS 400.3 PLUS Operation Manual_R02 Page 19/306...
  • Page 20 Type: 4 mm insulated sockets RS232 Serial Line Interfaces Connection: 9 pole SUB-D connector Pin 2  TxD Pin 3  RxD Pin 5  GND Pin 7  CTS Pin 8  RTS Interrupt button PTS 400.3 PLUS Operation Manual_R02 Page 20/306...
  • Page 21: Pts 400.3 Plus Interconnections Between Prs 600.3 And Pps 400.3

    PTS 400.3 PLUS interconnections between PRS 600.3 and PPS 400.3 Interconnection between PRS 600.3 and PPS 400.3-12 A Current bridge between PRS 600.3 and PPS 400.3-12 A Voltage bridge between PRS 600.3 and PPS 400.3-12 A PTS 400.3 PLUS Operation Manual_R02...
  • Page 22 Interconnection between PRS 600.3 and PPS 400.3-120 A High current bridge between PRS 600.3 and PPS 400.3-120 A Voltage bridge between PRS 600.3 and PPS 400.3-120 A PTS 400.3 PLUS Operation Manual_R02 Page 22/306...
  • Page 23: How To Separate The Two Modules

    Turn the latch around its own axis and the con- nection of the modules will be released Turn the whole lock a little bit away from the Now the modules are separated and can be re- modules moved from each other PTS 400.3 PLUS Operation Manual_R02 Page 23/306...
  • Page 24: Operation Principles

    After start up the Reference Menu Card (MC) is displayed in the form of a register card with the Logo cycling between MTE and EMH.   The various selectable functions of the menu are...
  • Page 25 RCS Ripple Control Signals [7.4] Adjustment of load point with regulators for U, I, φUI [7.6] Adjustment of load point with configurable regulators for U, I, f, φUI, φUU [7.7] System parameters [7.1] PTS 400.3 PLUS Operation Manual_R02 Page 25/306...
  • Page 26 Serial number of the unit CPU LP02 Hardware version This information may be required during contact with MTE in the event of a problem. Status information / Tool-tip Status information Most of the time status information of the system is displayed. For a detailed descrip- tion see [4.2].
  • Page 27 One display can be used to show a summary result view of the results recorded with the test function active on the other display. Back to Manual operation mode The functions of Test Assist are described in a separate operation manual. PTS 400.3 PLUS Operation Manual_R02 Page 27/306...
  • Page 28: Virtual Keyboard

    Upper case letters Locked upper case letters Press twice on Shift key Special characters Details to the use of the virtual keyboard at data input see [4.3]. PTS 400.3 PLUS Operation Manual_R02 Page 28/306...
  • Page 29: Functional Buttons (Fb)

    Blank key A blank key can be selected, but has no function. Blank keys are reserved for future ap- plications. Exit of sub menu The next higher menu or the calling menu is displayed. PTS 400.3 PLUS Operation Manual_R02 Page 29/306...
  • Page 30: Basic Applications Of Cursor And Enter Keys And Functional Buttons (Fb)

    Change numerical value by entering desired number with the virtual keyboard. Change unit value by pressing up/down cursor keys. Press Enter button to save the new value and to re- turn to previous menu. PTS 400.3 PLUS Operation Manual_R02 Page 30/306...
  • Page 31: External Keyboard Or Mouse (Option)

    A red mouse cursor is shown on the display and can be moved between left and right display to any position. Both displays can be operated directly. The operation of the left mouse key works like a touch operation. PTS 400.3 PLUS Operation Manual_R02 Page 31/306...
  • Page 32: Status Indications

    The displayed load values and energies and the ranges indicated in the status section are multiplied with the ratios defined at reference meter settings [8.1]. Selection and indication of voltage and current ranges Type Automatic range selection Manual range selection PTS 400.3 PLUS Operation Manual_R02 Page 32/306...
  • Page 33 Source switch on / switch off active indicated with sandglass and yellow blinking flash symbol. The set values are ramped up or down. Source On indicated with green ON button and yellow flash PTS 400.3 PLUS Operation Manual_R02 Page 33/306...
  • Page 34: Input Of Data

    Touching the FB C/R or the input field (5000) activates the input. The virtual keyboard for numerical inputs is displayed. The old value is displayed in a red frame followed by a grey cursor sign. PTS 400.3 PLUS Operation Manual_R02 Page 34/306...
  • Page 35 Minus sign with point key: If at start of input the decimal point key is depressed twice a minus sign is in- serted. If the point key is operated a third time a normal decimal point is in- serted. PTS 400.3 PLUS Operation Manual_R02 Page 35/306...
  • Page 36: Alphanumerical Line Input

    Touch the shift key once to acti- vate capital letters After the input of one capital let- ter, the input is automatically changed back to lower case let- ters. Input lower case letters This is the default input format. PTS 400.3 PLUS Operation Manual_R02 Page 36/306...
  • Page 37: Alphanumerical Field Input

    Touch the locked shift key once to change back to lower case let- ters and enter numbers directly. Delete character Touch the delete key to delete one character left to the cursor Enter correct number PTS 400.3 PLUS Operation Manual_R02 Page 37/306...
  • Page 38 Input of special signs Touch the Alt key to activate the layout with special signs. After the input of one special sign, the layout is automatically changed back to lower case let- ters. PTS 400.3 PLUS Operation Manual_R02 Page 38/306...
  • Page 39: Load / Save Settings

    Activate Load Actual Object by pressing the FB Select / load settings Press on desired object and settings will be automatically loaded. Cancel load settings Press on EXIT to cancel the load function. The actual settings remain unchanged. PTS 400.3 PLUS Operation Manual_R02 Page 39/306...
  • Page 40 Press on EXIT to cancel the save function. Exit, back to calling menu Delete file / rename file / create folder / browse folder / change sorting order Description of these functions see [6.1] PTS 400.3 PLUS Operation Manual_R02 Page 40/306...
  • Page 41: Basic Settings Of The Instrument

    Beep each time a new error value will be displayed (Status: inactive) Exit and accept settings, back to calling menu. Call communication setup menu [5.3] Screen Calibration Both Screens on the PRS 600.3 can be calibrated by touching the indicated cross lines (+). PTS 400.3 PLUS Operation Manual_R02 Page 41/306...
  • Page 42 Stars are indicated and the lock is shown open, if the password was correct entered and accepted. Reset the password Enter 0 to reset the password function. The key lock func- tion is disabled. PTS 400.3 PLUS Operation Manual_R02 Page 42/306...
  • Page 43 FB. Call Language selection menu [5.4]. Load different languages for tool tips, menu and units from the directory Languages Save and exit the menu PTS 400.3 PLUS Operation Manual_R02 Page 43/306...
  • Page 44: Clock Setup (Time And Date)

    The clock restarts with the entered time when the enter key is pressed to terminate the input. Date Enter the date in the format dd.mm.yyyy. The separator (.) will be gener- ated automatically. d: day, m: month, y: year PTS 400.3 PLUS Operation Manual_R02 Page 44/306...
  • Page 45: Gps Time Synchronization

    The status indication for the Any time mode in the right lower corner shows a red clock symbol. Once a GPS or NTP signal is received the status indica- tion will change accordingly. PTS 400.3 PLUS Operation Manual_R02 Page 45/306...
  • Page 46: Save Parameter Setup

    The images are saved in the same directory as the result file in the format: <4 char name><4 digit number>.BMP <4 char name> First 4 characters of the result file name <4 digit number> Automatically incremented number starting at 0000 .BMP Windows BMP Bitmap File Format PTS 400.3 PLUS Operation Manual_R02 Page 46/306...
  • Page 47 PC with a CF card reader. The images can be copied or moved to any directory on the PC and can be used for documen- tation of the measurements (e.g. inserted in a word document). Save and exit the menu PTS 400.3 PLUS Operation Manual_R02 Page 47/306...
  • Page 48: Communication Setup

    Choosing the wrong connection mode may cause network problems. Basics The PRS 600.3 needs an address. This address has to be entered later in Calegration. The address consists of two parts: • Internet-Protocol-Address (IP-Address) • User-Datagram-Protocol-Port Number (UDP-Port Number) PTS 400.3 PLUS Operation Manual_R02 Page 48/306...
  • Page 49 The PRS 600.3 is receiving the IP-address automatically from a DHCP Server. Recommended principle to integrate the PRS 600.3 in an existing network. No other settings are needed in this mode except of the UDP/TCP definition. PTS 400.3 PLUS Operation Manual_R02 Page 49/306...
  • Page 50 In below example the PRS 600.3's own IP address must be within the 192.168.2.x range, but should be outside of the range which the DHCP server is providing (192.168.2.1 - 192.168.2.10). Recommended principle for a point – point communication between PC and PRS 600.3. PTS 400.3 PLUS Operation Manual_R02 Page 50/306...
  • Page 51 The three examples show the communication with UDP port number 12345. For communication with TCP there are two ports available. The port 23 (=Telnet) and a second port, which can be entered in the setup. PTS 400.3 PLUS Operation Manual_R02 Page 51/306...
  • Page 52: Bluetooth Configuration

    FB’s will be grayed out. Status indication green: indicates that the PRS600.3 bluetooth module searches for avail- able devices. The search can run during sec- onds up to minutes. PTS 400.3 PLUS Operation Manual_R02 Page 52/306...
  • Page 53 The status indication of the source will change from grayed out to active. Load/save settings from/to directory Bluetooth settings Status indication Description of status indication in chapter [4.2] PTS 400.3 PLUS Operation Manual_R02 Page 53/306...
  • Page 54: Language Selection

    The selected language is indicated in the menu Parameter. Reset to default language The language file <English> will be loaded. The language English is indicated in the menu Parameter. Exit and accept settings, back to calling menu. PTS 400.3 PLUS Operation Manual_R02 Page 54/306...
  • Page 55: Installation And Configuration Of Universal Serial Bus Usb

    Press on keyboard Windows + X keys and select Device Manager 3 Double Click on USB CDC driver for 4 Select Update Driver EMH devices 5 Select Browse my Computer for driver 6 Select Browse software PTS 400.3 PLUS Operation Manual_R02 Page 55/306...
  • Page 56 Checking for correct installation The correct installation of the driver can be checked in the device manager under Ports /COM & LPT. The EMH CDC driver must be displayed. PTS 400.3 PLUS Operation Manual_R02 Page 56/306...
  • Page 57: Calegration Settings

    PRS 600.3 is hearable. 5.5.2 CALegration settings Select the USB COM-port in the CALegration System Device connection settings. CALegration is only showing the COM-ports where the driver mentioned above is installed for. PTS 400.3 PLUS Operation Manual_R02 Page 57/306...
  • Page 58: Test Results And Administrative Data

    Call Meter data menu [6.5] Call Transformer data menu [6.6] Call Loadpoint Data menu [6.7] Call View test results menu [6.2] Lock the keyboard with password Basic settings of the instrument see chapter [5] PTS 400.3 PLUS Operation Manual_R02 Page 58/306...
  • Page 59: Data Base Functions

    --- UP --- or --- ROOT ---, see description under browse. Note: Direct selection of folders is not working for delete and rename. Here the browse function must be used. Cancel function Press EXIT to cancel the function. PTS 400.3 PLUS Operation Manual_R02 Page 59/306...
  • Page 60 Load object file Load file by pressing on correspond- ing name in the list. The file is loaded and the editor of the actual object dataset is shown (see description for edit actual ob- ject). PTS 400.3 PLUS Operation Manual_R02 Page 60/306...
  • Page 61 Append: The new measurement data set will be appended to the existing file. This option is only available at meas- urement result files. Abort: Cancel save function. PTS 400.3 PLUS Operation Manual_R02 Page 61/306...
  • Page 62 Edit the object name by using the vir- tual keyboard and press Enter to ter- minate. The edited file must be saved and will then be displayed in the list (adSiemens Meter 123). The original file remains in the list. PTS 400.3 PLUS Operation Manual_R02 Page 62/306...
  • Page 63 (files and subfolders) are deleted. The function is terminated. Rename object file or folder Activate rename Select file to be renamed by pressing on the name. Change name Change name with the virtual key- board. PTS 400.3 PLUS Operation Manual_R02 Page 63/306...
  • Page 64 Change to subfolder The subfolder content is shown. The second header line shows the new path (LG\MM). Change to upper folder Select --- UP --- to change to next higher level. PTS 400.3 PLUS Operation Manual_R02 Page 64/306...
  • Page 65 Sort files and directories ascending according creation dates Sort files and directories descending according creation dates Sort files ascending according file size Sort files descending according file size No sorting Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 65/306...
  • Page 66: View Of Saved Test Results And Measurement Information

    1 of total 15 (1/15) is indi- cated as third header line. Scroll up and down with the scroll bar on the right side to view all datasets. PTS 400.3 PLUS Operation Manual_R02 Page 66/306...
  • Page 67: Database Structure

    Tel. No. (Mob.) Ratio I Email Comment (incl. U,I,,P,Q,S, .) Network Operator (incl. U,I,,P,Q,S, .) Address Query CR Tel. No. (Off.) Tel. No. (Mob.) (incl. U,I,,P,Q,S, .) Email Comment Sequence Results (incl. U,I,,P,Q,S, .) PTS 400.3 PLUS Operation Manual_R02 Page 67/306...
  • Page 68 Certif. No. / Date Accuracy Class Volt. Drop Fuse Primary Voltage Energy Test Volt. Drop Total Second. Voltage (incl. U,I,, ...) Comment Nominal Burden Metering Code Country Code Netwo. Op. Code Zip Code PTS 400.3 PLUS Operation Manual_R02 Page 68/306...
  • Page 69: Administrative Data

    Actual customer dataset Enter or modify with virtual keyboard or external keyboard: Customer number Customer address Phone number Mobile phone number E-mail address Comment to customer dataset Exit, back to file selection menu. PTS 400.3 PLUS Operation Manual_R02 Page 69/306...
  • Page 70: Meter Data

    Call edit actual object or load object file or create new object at the file selection menu [6.1] to call the actual object menu. Actual meter type dataset Meter principle Manufacturer Meter type Meter network type Meter connection type Electrical values Approval Number Measure system setup Comments PTS 400.3 PLUS Operation Manual_R02 Page 70/306...
  • Page 71 Select desired network type. The se- lected network is shown pressed. Press on exit door to leave the selec- tion menu. Meter connection type Direct connection Transformer operated related to primary. Transformer operated related to secondary. PTS 400.3 PLUS Operation Manual_R02 Page 71/306...
  • Page 72 Minimum Current Enter the minimum current Imin according to EN 50470-1 standard. Typically, 20-40% of Itr for CT connected meters and 30-50% of Itr for direct connected meters. Exit the screen. PTS 400.3 PLUS Operation Manual_R02 Page 72/306...
  • Page 73 Load / edit object files The file selection menu [6.1] is called with the object file directory: Measure System Selection For description of actual measure system dataset see [6.5.1.2] Exit, save actual settings, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 73/306...
  • Page 74 ..h/i Wh/i varh/i VAh/i Wh/i Wh/i ..s/i Ws/i vars/i VAs/i Ws/i Ws/i PTS 400.3 PLUS Operation Manual_R02 Page 74/306...
  • Page 75: Meter Dataset

    Select / load file from directory. The object file loaded at phase 1 is automatically copied to phases 2 and 3. Select fields of phases 2 and 3 to individually load other settings for these phases. PTS 400.3 PLUS Operation Manual_R02 Page 75/306...
  • Page 76 Network operator code ZIP code Metering code Exit, back to calling menu Exit file selection menu, back to meter dataset menu. The entered metering code is displayed. Exit, save actual settings, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 76/306...
  • Page 77: Transformer Data

    For description of actual potential transformer PT type dataset see [6.6.3] Load / edit object file The file selection menu [6.1] is called with the object file directory: PT Selections For description of actual potential transformer PT dataset see [6.6.4] PTS 400.3 PLUS Operation Manual_R02 Page 77/306...
  • Page 78: Current Transformer Ct Type Dataset

    Indications / settings Load / edit object file The file selection menu [6.1] is called with the object file directory: CT Type Selections For description of actual current CT type dataset see [6.6.1] PTS 400.3 PLUS Operation Manual_R02 Page 78/306...
  • Page 79: Potential Transformer Pt Type Dataset

    Indications / settings Load / edit object file The file selection menu [6.1] is called with the object file directory: PT Type Selections For description of actual potential PT type dataset see [6.6.3] PTS 400.3 PLUS Operation Manual_R02 Page 79/306...
  • Page 80: Load Point Data

    Ripple control RC Sequence dataset Load / edit object file The file selection menu [6.1] is called with the object file directory: RCS Telegram Selections For description of RC Sequence Telegrams dataset see [7.4.1] PTS 400.3 PLUS Operation Manual_R02 Page 80/306...
  • Page 81: Portable Power Source

    Call User-defined Slider Screen menu [7.7] The menu allows to manually adjust load points with regulators for 3 user defined val- ues at once. Choose from Voltage, Current, Phaseangle, Baseangle and Frequency or disable the slider. PTS 400.3 PLUS Operation Manual_R02 Page 81/306...
  • Page 82: Power Source Setup

    These settings can be saved and recalled in this menu. The parameters menu is reserved to MTE service staff. The display of the parameters will be useful for the user to give detailed information to the service staff.
  • Page 83: Setup Current Output

    120A output of the power source in the current range 0A...12.0000A. The black 12A output of the power source is always connected to the black 120A output of the power source. PTS 400.3 PLUS Operation Manual_R02 Page 83/306...
  • Page 84: Load Point Definition

    Display of UIφf settings • Vector diagram monitor • Waveform monitor Start/Stop power source and Fast Stop power source [7.5] Call Edit Load point UIφf menu [7.2.1] Load/save settings from/to directory Load Point Selections PTS 400.3 PLUS Operation Manual_R02 Page 84/306...
  • Page 85: Edit Load Point

    The value for the voltage can be set in % of voltage Un. Warning! The voltage U can be either the phase-phase voltage or the phase-neutral voltage. See table Settings of voltage U depending on network type [7.2.2] PTS 400.3 PLUS Operation Manual_R02 Page 85/306...
  • Page 86 The phase angle φb1, φb2, φb3 can be set in the range 0°...+360° (applicable only in a custom defined network) Edit frequency The frequency of the fundamental wave can be set in the range 45Hz...400Hz. Exit and accept settings, back to calling menu. PTS 400.3 PLUS Operation Manual_R02 Page 86/306...
  • Page 87: Additional Information To The Network Types

    120V 120V 120V 240V 230V 57.7V 120V 120V 120V 240V 230V 57.7V 230V 207V 240V Settings for 1P2W mode Warning! In this mode voltage output U and current output I will be used. PTS 400.3 PLUS Operation Manual_R02 Page 87/306...
  • Page 88 Aron circuitry. age are in phase if the age are in phase if setting is  = 0°. the setting is  = 0 PTS 400.3 PLUS Operation Manual_R02 Page 88/306...
  • Page 89: Harmonics

    • Edit function for phase selective setting of cur- rent harmonics • Checkbox for setting all voltage harmonics to- gether • Checkbox for setting all current harmonics to- gether • Reset all harmonics PTS 400.3 PLUS Operation Manual_R02 Page 89/306...
  • Page 90 All harmonics will be set to 0%. Before erasing the harmonic settings, the security question will ap- pear. Choosing OK will erase the current settings. Exit and accept settings, back to calling menu. PTS 400.3 PLUS Operation Manual_R02 Page 90/306...
  • Page 91: Rcs Ripple Control Signals

    Load/save ripple control settings menu Start/Stop and Fast Stop [7.5] Start/Stop RCS signal [7.5.7] Edit RCS telegram [7.4.1] Load/save settings from/to directory RCS Telegram Selections The RCS telegram settings will be loaded or saved. PTS 400.3 PLUS Operation Manual_R02 Page 91/306...
  • Page 92: Setup Of Rcs Telegram

    Edit Ripple control phases The ripple control signal will be generated for the selected phases. Edit Comment Input of a text with up to 128 characters. Exit and accept settings, back to calling menu. PTS 400.3 PLUS Operation Manual_R02 Page 92/306...
  • Page 93: Setup Of Rcs Telegram Type

    Edit steering impulse pause Input of steering impulse pause time in ms. Edit number of steering impulses Input of the number of steering impulses according the defined telegram type in the range of 0...256. PTS 400.3 PLUS Operation Manual_R02 Page 93/306...
  • Page 94: Execute Load Point

    The output signals of the power source are still switched off after releasing the interrupt button. Fast Stop The output signals of the power source will be stopped immediately by pushing the FB Fast Stop. PTS 400.3 PLUS Operation Manual_R02 Page 94/306...
  • Page 95: Functional Button (Fb) Start/Stop Power Source

    The waveform monitor shows the actual voltage wave forms and current waveforms. The scale will automatically be set according the amplitude of the signals. One period of the signal will be displayed. PTS 400.3 PLUS Operation Manual_R02 Page 95/306...
  • Page 96: Switch On/Off Sequence

    Voltage and current are stable. • The measured values will be dis- played instead of settings. • Vector diagram monitor is ON. • Waveform monitor is ON. • Power source indication is ON. Run test PTS 400.3 PLUS Operation Manual_R02 Page 96/306...
  • Page 97 Fast switch off the power source The power source will be stopped immediately without ramping down the output signals. The status indications will be identically as described in the switch off procedure with FB Start/Stop in step 4a. PTS 400.3 PLUS Operation Manual_R02 Page 97/306...
  • Page 98: Change Settings Of Load Point

    In this example U has been changed from 230V to 253V. Changing only the setting of voltage U will cause an auto- matic setting of U and U with the set value of U PTS 400.3 PLUS Operation Manual_R02 Page 98/306...
  • Page 99 Switch on new settings Status indication during ramping up or down voltage and current to the new set value. The power source is running with the new settings. The actual measured load point values are displayed. PTS 400.3 PLUS Operation Manual_R02 Page 99/306...
  • Page 100: Switch Harmonics On / Off

    Select harmonics menu • Harmonics menu on • Display the harmonic monitor Define or select the harmonics Switch on the selected harmonics Indication harmonics on Run test Switch off harmonics Indication harmonics switched off PTS 400.3 PLUS Operation Manual_R02 Page 100/306...
  • Page 101: Switch Rcs Telegram On / Off

    The total run time for the selected telegram can vary from several seconds up to several minutes. Switch off ripple control signal (if necessary during execution) Indication ripple control signal switched off Switch off the power source Indication power source switched off PTS 400.3 PLUS Operation Manual_R02 Page 101/306...
  • Page 102: Load Point Adjustment With Regulators

    The actual measured values will be dis- played. Set full scale voltage U The full scale voltage can be set in the range 0V...Umax. Set full scale current I The full-scale current can be set in the range 0...Imax. PTS 400.3 PLUS Operation Manual_R02 Page 102/306...
  • Page 103: User Defined Slider Settings

    Check the settings UmaxImax. Check the settings UIφf. Switch on the power source first Status indication during ramping up voltage and current to the set value. Status indication when the power source is switched ON PTS 400.3 PLUS Operation Manual_R02 Page 103/306...
  • Page 104 Select the frequency range (45 - 400 Hz). Set full scale voltage U The full scale voltage can be set in the range 0V...Umax. Set full scale current I The full-scale current can be set in the range 0...Imax. PTS 400.3 PLUS Operation Manual_R02 Page 104/306...
  • Page 105 %. All phases can be set together when the checkbox is marked. The actual measured values will be displayed. Exit the screen The settings are already active and the measured values are displayed. PTS 400.3 PLUS Operation Manual_R02 Page 105/306...
  • Page 106: Reference Meter

    Voltage transformer (enable or disable) Current transformer (enable or disable) Time base Reference system parameters (not avail- able at PTS 400.3 Plus) Indications / settings Connection mode 4-wire mode Operational mode for testing 3 phase 4 wire Y or  meters.
  • Page 107 Q. Q = U(-90°)∙I∙cos = U∙I∙sin The maximum reactive power is reached, if the phase angle between current and voltage is 90° (sin =1). PTS 400.3 PLUS Operation Manual_R02 Page 107/306...
  • Page 108 It is applicable to meters designed according to IEEE 1459 standard. Call Selection of voltage measurement inputs menu [8.1.3] Call Selection of current measurement inputs menu [8.1.4] Call Voltage measuring transformer PT settings menu [8.1.5] Call Current measuring transformer CT settings menu [8.1.6] PTS 400.3 PLUS Operation Manual_R02 Page 108/306...
  • Page 109: Selection Of Voltage And Current Range

    Synchronization of voltage range selection Common for all voltage phases manual selection of voltage ranges individually per phase Synchronization of current range selection Common for all current phases manual selection of current ranges individually per phase PTS 400.3 PLUS Operation Manual_R02 Page 109/306...
  • Page 110 The actual selected ranges are marked Status indication for automatic range selection The Symbol indicates that automatic range selection is ac- tive. The actual selected ranges of phase voltages and phase cur- rents are shown. PTS 400.3 PLUS Operation Manual_R02 Page 110/306...
  • Page 111 The actual selected ranges are marked. Status indication for manual range selection The Symbol indicates that manual range selection is ac- tive. The actual selected ranges of phase voltages and phase cur- rents are listed. PTS 400.3 PLUS Operation Manual_R02 Page 111/306...
  • Page 112 A red frame is displayed. The actual selected phase and the actual se- lected ranges of all phases are yel- low highlighted. The last highlighted ranges are ac- cepted. The red frame and the yellow highlighting disappear. PTS 400.3 PLUS Operation Manual_R02 Page 112/306...
  • Page 113 A red frame is displayed. The actual phase and the actual selected ranges of all phases are yellow highlighted. The last highlighted ranges are accepted. The red frame and the yellow highlighting disappear. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 113/306...
  • Page 114: Definition Of Frequency Outputs

    Unit Selection of the unit of the desired output. CPZ1 Shows the actual constant at the impulse output. FOut1 Shows the actual frequency output at the impulse. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 114/306...
  • Page 115: Selection Of Voltage Measurement Inputs

    There is no need to go to the setup menu to select the voltage measure- ment inputs. For further explanations to this function see 8.1.4. PTS 400.3 PLUS Operation Manual_R02 Page 115/306...
  • Page 116: Selection Of Current Measurement Inputs

    Depending on what current input is chosen, after pressing on the main setup screen it shows the corresponding current input and it’s belonging sta- tus symbol. Current input selection indication Status symbol indication PTS 400.3 PLUS Operation Manual_R02 Page 116/306...
  • Page 117 30A, 300A or 3000A as manually selected at the LEMflex or FLEX 3000 box. This range setting at the LEMflex or FLEX 3000 box cannot be auto- matically detected by the instrument. PTS 400.3 PLUS Operation Manual_R02 Page 117/306...
  • Page 118: Voltage Measuring Transformer Pt Settings

    Call edit actual object or load object file or create new object at the file selection menu [6.1] to call the actual object menu. Actual CT type dataset menu Manufacturer Current transformer CT type Accuracy class Primary current Secondary current Nominal burden Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 118/306...
  • Page 119: Error Measurement

    Relative error in per mill The displayed values are re- lated to 0. No error = 0 ‰ 1 % = 10 ‰ Absolute error The displayed values are re- lated to 100. No error = 100% PTS 400.3 PLUS Operation Manual_R02 Page 119/306...
  • Page 120 With the setting N = 0 or 1 the value Em(1) = E1 and Es(1) = 0.000 is displayed. The sta- tistic function is disabled and the error value displayed at Em(1) is equal to E1. PTS 400.3 PLUS Operation Manual_R02 Page 120/306...
  • Page 121 Call setup of error measurement menu [8.2.2]. During an error measurement, the setup of error measurement key is blocked. Stop the error measurement to activate the setup key. Call storage of test results menu [10]. PTS 400.3 PLUS Operation Manual_R02 Page 121/306...
  • Page 122: Measuring Setup

    Paste function Press either on the FB Input on the left side or directly into the corresponding region on the right side. During the paste process, the region is red-framed for a short moment. PTS 400.3 PLUS Operation Manual_R02 Page 122/306...
  • Page 123 In this case, ’Imp’ stands for impulse. An impulse means the same as a disk rotation or the passing mark on a Ferraris meter, where ‘Imp’ is often replaced by ‘r’ for revolution. PTS 400.3 PLUS Operation Manual_R02 Page 123/306...
  • Page 124 Input of the lower and upper Error tolerance. The tolerance range of the error bar graph can be changed individu- ally for Emin and Emax by entering the value with the virtual key- board. PTS 400.3 PLUS Operation Manual_R02 Page 124/306...
  • Page 125: Measurement

    • Apparent power per phase and sum (S S) • Power factors per phase and sum (PF , PF , PF • Frequency (f) The values are updated at the interval of the time base. PTS 400.3 PLUS Operation Manual_R02 Page 125/306...
  • Page 126: Uipqs Values

    • Reactive power per phase and sum (Q Q) • Apparent power per phase and sum (S S) • Power factor sum (PF) • Frequency (f) 3-wire mode The values not available in 3-wire mode are marked with: ‘------‘. PTS 400.3 PLUS Operation Manual_R02 Page 126/306...
  • Page 127: Vector Diagram

    Switching between the display formats 4W and 3W Change colors of vectors The same color for all voltages (blue) and all currents (red) Different color for the phases: 1 (red), 2 (yellow), 3 (blue) PTS 400.3 PLUS Operation Manual_R02 Page 127/306...
  • Page 128: Wave Form Analysis

    The numerical values are updated at the time base interval. The signals U3, I3 with 5 harmonics displayed here correspond to the results of the analysis in chapter [8.4.2]. PTS 400.3 PLUS Operation Manual_R02 Page 128/306...
  • Page 129 The same color for all voltages (blue) and all currents (red) Different color for the phases: 1 (red), 2 (yellow), 3 (blue) Call storage and printout of test results menu [10]. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 129/306...
  • Page 130: Harmonic Analysis

    (V, A, W, var, VA) as well as the selected harmonic fre- quency are displayed at the bottom. The selected harmonic is highlighted in the graphical diagram. PTS 400.3 PLUS Operation Manual_R02 Page 130/306...
  • Page 131 4.0 %. The absolute value of h5 is negative, because the phase shift between the 5 harmonic of current and voltage is approximately 150°. Call storage of test results menu [10]. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 131/306...
  • Page 132: Energy Measurement And Register Test

    The actual power of the selected energy mode is displayed. Actual  energy The actual -energy of the selected mode is displayed. The energy is counted up, start- ing at zero, displayed with the selected unit. PTS 400.3 PLUS Operation Manual_R02 Page 132/306...
  • Page 133 Setup Energy measurement. menu [8.5.1.1] Restart Energy measurement With the FB the counting registers are reset to zero. Counting restarts automatically. Call storage and printout of test results menu [10]. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 133/306...
  • Page 134 Time base can be entered in seconds, minutes or hours. Copy parameters from input x (1,2,3) to input y (1,2,3) menu [8.2.2] Load/save settings from/to directory [4.4] Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 134/306...
  • Page 135: Register Test

    Max. The next measuring period starts automatically. At the end of the next measuring period, the new power values are displayed. The value, however, only varies if the new power value is larger than all preceding ones. PTS 400.3 PLUS Operation Manual_R02 Page 135/306...
  • Page 136 Configuration Check / change basic settings and configurations for register test in setup menu [8.5.2.1] Step by step instruction See test procedures for automatic register test [8.5.2.2] or manual register test [8.5.2.3], [8.5.2.4]. PTS 400.3 PLUS Operation Manual_R02 Page 136/306...
  • Page 137 The unit depends on the chosen reference mode. These setting and input can be defined on input 1 only, valid for all three register tests. In case is chosen, the unit is shown x?x. PTS 400.3 PLUS Operation Manual_R02 Page 137/306...
  • Page 138 If this is disturbing, a period of 60 min can be entered. In this case WP (t)/t will indicate the energy counted up since start in Wh during 1h. PTS 400.3 PLUS Operation Manual_R02 Page 138/306...
  • Page 139 The result of a previous test are reset to zero. Start automatic register test The FBs for source action and energy measurement are blocked and the voltage is switched on to power up the meter under test. PTS 400.3 PLUS Operation Manual_R02 Page 139/306...
  • Page 140 (PF ≠ 1) to get active and reactive energy dosage at the same time. 4a,6a During entry of start and end readings the input for all active registers is required one by one, before the next step is running. PTS 400.3 PLUS Operation Manual_R02 Page 140/306...
  • Page 141 The user must stop the load manually at the same time, when the input of the end reading is activated to assure, that the reference standard and the meter under test are counting the same amount of energy. PTS 400.3 PLUS Operation Manual_R02 Page 141/306...
  • Page 142 WP as soon as a load is present. Switch power source on The current is switched on and the energy dosage is running until it is stopped manually. PTS 400.3 PLUS Operation Manual_R02 Page 142/306...
  • Page 143 Attention! The source remains in the last state, if you leave the register test menu. Voltage and/or current can still be switched on depending on the actual source action settings. Check the actual state in the source menu card and switch off the source manually, if this is required. PTS 400.3 PLUS Operation Manual_R02 Page 143/306...
  • Page 144 The start and end readings can be changed before, during and after the test. This can be used to: • Correct wrong entries • Enter an expected end reading • Test several registers of different meters one by one by entering the corresponding regis- ter readings. PTS 400.3 PLUS Operation Manual_R02 Page 144/306...
  • Page 145 Enter key. Start energy measurement The energy measurement of the reference meter is ena- bled and the energy will be counted and shown at WP  as soon as a load is present. PTS 400.3 PLUS Operation Manual_R02 Page 145/306...
  • Page 146 (PF ≠ 1) to get active and reactive energy dosage at the same time. 4a,9a During entry of start and end readings the input for all active registers is required one by one, before the next step is running. PTS 400.3 PLUS Operation Manual_R02 Page 146/306...
  • Page 147: Instrument Transformer Testing

    For the necessary connections between transformer and instrument see the connection example in chapter [17.2.10]. PTS 400.3 PLUS Operation Manual_R02 Page 147/306...
  • Page 148 If the value is not in the admissible range measures can be taken on site to adjust the burden and the effect can immediately be checked. Operating burden ratio in %     PTS 400.3 PLUS Operation Manual_R02 Page 148/306...
  • Page 149 Susceptance (imaginary part of Y) Admittance Y The admittance (Y) and its real part (G) and imaginary part (jB) are calcu- lated based on the measured values U and I. Admittance Complex Admittance PTS 400.3 PLUS Operation Manual_R02 Page 149/306...
  • Page 150: Current Transformer (Ct) Burden Measurement

    For the necessary connections between transformer and instrument see the connection example in chapter [17.2.11]. PTS 400.3 PLUS Operation Manual_R02 Page 150/306...
  • Page 151 If the value is not in the admissible range measures can be taken on site to adjust the burden and the effect can immediately be checked. Operating burden ratio in %     PTS 400.3 PLUS Operation Manual_R02 Page 151/306...
  • Page 152 Select L1, L2, L3 to assign the measured results (U1, I1) to the corresponding phase (cy- clical mode). The calculated results are indicated with the index of the selected phase. This function can be used to test a 3 phase meter phase by phase and save the results. PTS 400.3 PLUS Operation Manual_R02 Page 152/306...
  • Page 153: Voltage Transformer (Pt) Ratio Measurement

    • φ Phase angle in ° • Error E of the measured ratio / nominal ratio in % The results are updated in the interval of the time base T (e.g. 1s). PTS 400.3 PLUS Operation Manual_R02 Page 153/306...
  • Page 154 Select the measurement mode, direct voltage input or Hotstick U, for the pri- mary voltage Us, of the secondary input on the voltage transformer. Load/save settings from/to directory Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 154/306...
  • Page 155: Current Transformer (Ct) Ratio Measurement

    Ratio error The fields of the reference are grey marked and will be the –1]*100 [%] E = [r/r base value for the calculation of NP or NS in the results display section. PTS 400.3 PLUS Operation Manual_R02 Page 155/306...
  • Page 156 Is, of the secondary input on the current trans- formers. Load/save settings from/to directory Exit, back to calling menu Call storage of test results menu [10]. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 156/306...
  • Page 157: Special Functions

    (t/n) can be defined in the same manner as at error measurement (see also [8.2.2]) Copy parameters from input x to input y Load/save settings from/to directory Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 157/306...
  • Page 158: Attributive Test

    Reset all attributive test results to de- fault value. 8.7.2.1 Create / Edit attributes Add attribute Edit attribute Copy attribute Move attribute Delete attribute Load/save settings from/to directory Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 158/306...
  • Page 159 Empty or predefined text field (only available if attribute type is defined as text entry) Edit attribute Select the attribute to be edited by pressing on corresponding entry. Further steps are analog to above procedure "Add attribute". PTS 400.3 PLUS Operation Manual_R02 Page 159/306...
  • Page 160: Self-Test

    FB is the reference phase. The deviation between phases and reference will be shown: • EU (error U in %) • EI (error I in %) • EP (error P in %) PTS 400.3 PLUS Operation Manual_R02 Page 160/306...
  • Page 161 Reference phase selection Toggle mode for reference phase selection Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 161/306...
  • Page 162: Uref Test (Option)

    Black connector -> COM The outputs of the DC-voltage standard may have names other than Uout and COM. In this case consult the manu- facturer’s DC-Voltage Standard user manual for connec- tion instructions. PTS 400.3 PLUS Operation Manual_R02 Page 162/306...
  • Page 163 Reverse polarity Connect DC - voltage standard for negative URef test to NE-input. Yellow connector -> COM Black connector -> Uout or use the polarity switch of the DC - voltage standard if available. PTS 400.3 PLUS Operation Manual_R02 Page 163/306...
  • Page 164: Fref Test

    Frequency range: 1 kHz … 200 kHz The measurement runs continuously. A bar graph indicates the progress of the measurement. The deviation of the internal time base is indicated in ppm in graphical form and as a numerical value. PTS 400.3 PLUS Operation Manual_R02 Page 164/306...
  • Page 165 The measurement runs continu- ously. Stop fRef test Save test results Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 165/306...
  • Page 166: Automatic Test Run With Portable Test System

    Edit actual test sequence Load / save test sequence Exit, back to calling menu Indications / settings Call test sequence editor menu [9.1.1] Load / save test sequence from / to directory Check Sequence Selections [4.4] PTS 400.3 PLUS Operation Manual_R02 Page 166/306...
  • Page 167: Editor Functions

    [9.1], only the FB’s on the left side are changed and the following functions are available: Insert new step Edit step Copy step Move step Delete step Enter comment Exit, back to basic menu PTS 400.3 PLUS Operation Manual_R02 Page 167/306...
  • Page 168 The FB is shown normal again. Note: Move the yellow line with the cursor keys of an external keyboard up to the the first or down to the last step to cancel the function. PTS 400.3 PLUS Operation Manual_R02 Page 168/306...
  • Page 169 Edit step Activate edit Press on demanded step to call the editor. Test step definition menu [9.1.2] Change settings and name as de- sired. Exit, back to editor menu and terminate edit function. PTS 400.3 PLUS Operation Manual_R02 Page 169/306...
  • Page 170 It will be inserted at the target position and the other steps will be moved accordingly. Delete step Delete step Press on demanded step to be deleted. Step deleted The following positions are shifted -1. PTS 400.3 PLUS Operation Manual_R02 Page 170/306...
  • Page 171: Test Step Definition

    In the lower part of the display the mark positioning parameter is shown. Load Point The load point parameters shown are defined with fixed settings for voltage, current and phase angle with units V, A, Applicable for all types. PTS 400.3 PLUS Operation Manual_R02 Page 171/306...
  • Page 172 Call mark positioning setup menu [9.1.6] Set copy from meter flag Change settings Activate / Deactivate function Press FB to activate or deactivate function. The function is activated or deac- tivated for all 3 inputs (cyclical mode). PTS 400.3 PLUS Operation Manual_R02 Page 172/306...
  • Page 173: Load Point Setup

    Load /save settings from / to object file in directory Copy settings from input x to input y Exit, back to calling menu For a detailed description of error measurement settings see chapter [8.2.2]. PTS 400.3 PLUS Operation Manual_R02 Page 173/306...
  • Page 174: Energy Measurement Setup

    Enter desired dosage interval for energy or time dosage. Unit / mode Select the appropriate unit with up down cursors (cyclical mode): Unit Mode s, min, hr Time dosage Ws, Wh, kWh Energy dosage PTS 400.3 PLUS Operation Manual_R02 Page 174/306...
  • Page 175: Mark Positioning Setup

    • Meter type (ZMD120AMtr53) and meter (ZMD120 #72 318 935) file name for inputs 1 to 3, where meters are defined. • Comment to test setup (abbreviated form) • Window with test sequence steps PTS 400.3 PLUS Operation Manual_R02 Page 175/306...
  • Page 176 Type Energy (register test) Test step status for measuring places 1, 2, 3 Not yet executed, no result or input not defined Step running Step finished, error within tolerance Step finished, error out of tolerance PTS 400.3 PLUS Operation Manual_R02 Page 176/306...
  • Page 177 Select first step is not accessible as long as test step is active Start next single step is not accessible as long as test step is active Start next single step is active between steps PTS 400.3 PLUS Operation Manual_R02 Page 177/306...
  • Page 178 Select and start any step (step will automatically start after selecting) Call test sequence and meters setup menu [9.2.1] Call view test step results menu [9.2.2] Call storage of test results menu [10] PTS 400.3 PLUS Operation Manual_R02 Page 178/306...
  • Page 179: Test Sequence And Meters Setup

    Test sequences previously defined by the test sequence editor and stored in the data base can be loaded. Edit actual test sequence Select sub menus and activate edit actual object until the sequence editor is displayed [9.1.1]. Define test steps directly. PTS 400.3 PLUS Operation Manual_R02 Page 179/306...
  • Page 180: View Test Step Results

    First measurement of N measurements running, no error result available yet Last measured error result of selected test step. The value is updated during test runs with several repetitions (N>1). Last measured error result of not selected, finished test step. PTS 400.3 PLUS Operation Manual_R02 Page 180/306...
  • Page 181: Preparation Of Test Run

    Make at least one input (e.g. serial num- ber). Go back with several exit FB’s until setup menu is displayed again with entries Modified at meter and meter type file name. PTS 400.3 PLUS Operation Manual_R02 Page 181/306...
  • Page 182: Test Run Examples

    Select any start step with the yellow selec- tion line. The default start step is 01. The selected start step becomes red. The sequence will run automatically form start step until the last step in the sequence PTS 400.3 PLUS Operation Manual_R02 Page 182/306...
  • Page 183 The errors of the last measurement are shown for the different steps of meters 1 to 3 (input 1 to 3). Call storage of results menu to save results [10] PTS 400.3 PLUS Operation Manual_R02 Page 183/306...
  • Page 184: Step By Step Test Run

    Start next single test step (continues automatically without restarting) Select any next test step (press twice on desired step to continue test at correspond- ing step) Stop test run manually Call storage of results menu to save results [10] PTS 400.3 PLUS Operation Manual_R02 Page 184/306...
  • Page 185: Test Run With Test Steps Of Type Energy

    The counter error (E) is calculated and dis- played. The second last line shows the energy (W), which was really dosed and taken as refer- ence for the error calculation. PTS 400.3 PLUS Operation Manual_R02 Page 185/306...
  • Page 186: Functions To Change / Interrupt / Restart The Test Run

    View detailed test step results in storage of results preview Track test step settings with Source Load point menu Track test step settings with Reference measurement functions Work parallel in data base (e.g. to enter or change ADS of customer) PTS 400.3 PLUS Operation Manual_R02 Page 186/306...
  • Page 187: Error Handling

    (Imax) defined in me- Select YES only, if you are ter type. sure that the meters con- nected are not damaged un- der this conditions. PTS 400.3 PLUS Operation Manual_R02 Page 187/306...
  • Page 188: Storage Of Test Results

    Print data (not available at PRS 600.3, use print function of software CALegration) Preview of results in printout format Call save parameters settings menu [5.2] to define settings for: Save mode (single / continuous) see description in chapter [10.2.1] PTS 400.3 PLUS Operation Manual_R02 Page 188/306...
  • Page 189 Enter or modify comment with the virtual or external keyboard. This field can also be used for simple measurement documentation, if the complete ADS and the ADS parts are not used and reset to defaults. Exit, back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 189/306...
  • Page 190: Preview Of Results

    The measurement result datasets (TDS) are saved continuously at the de- fined time interval in s, min, h. On new event The measurement result datasets (TDS) are saved every time a new result is created. PTS 400.3 PLUS Operation Manual_R02 Page 190/306...
  • Page 191: Save Single Measurement

    With this function, several measurements can be added to the same file (e.g. all measure- ments of one customer). The FB is only enabled, if a file was created/selected before and a data set saved already re- garding point 5a. PTS 400.3 PLUS Operation Manual_R02 Page 191/306...
  • Page 192: Save Continuous Measurements

    The last saved measurement results are shown. With the preview function, only one of the saved result sets can be viewed. To see all the saved results the data must be transferred to CALegration. Exit, back to calling measurement menu PTS 400.3 PLUS Operation Manual_R02 Page 192/306...
  • Page 193: Data Transfer To Pc

    CF card. 10.3.3 Interface for data transfer The data can be transferred by using either the USB or the Ethernet interface. Configuration for the connections must be made in the CALegration software. PTS 400.3 PLUS Operation Manual_R02 Page 193/306...
  • Page 194: Basic Settings And Functions For Power Quality Measurement

    Note: The recording time base defined here is not regarded for the frequency, which is always rec- orded with 10s intervals regarding the standard IEC 61000-4-30. It is also not regarded at magnitude values recorded with events, transients and mains signaling, where a fix 1s interval is used. PTS 400.3 PLUS Operation Manual_R02 Page 194/306...
  • Page 195: Different Views Of Results

    Position of the time interval in the recording E.g. length and position of interval 10 min within total recording of 1 h 40 min 6 s (01:40:06), whole length of the bar graph. Indication OFF Original curves indicated only PTS 400.3 PLUS Operation Manual_R02 Page 195/306...
  • Page 196 (full bar graph = 01:40:06). Note: The time interval (10 min) indicated in the time control section has no meaning for the table view. PTS 400.3 PLUS Operation Manual_R02 Page 196/306...
  • Page 197: Histogram View

    Any combination of 2 or 3signals can be displayed (e.g. all phase neutral voltages U1, U2, U3). Note: If more than three checkboxes are active, the left and upper checkboxes have priority. PTS 400.3 PLUS Operation Manual_R02 Page 197/306...
  • Page 198: Overview Of Recording And Navigation Within The Recording

    The following predefined time intervals can be selected: Milliseconds 100, 200, 500 ms Seconds 1, 2, 5, 10, 20, 30 s Minutes 1, 2, 5, 10, 20, 30 m Hours 1, 2, 5, 10, 24 h PTS 400.3 PLUS Operation Manual_R02 Page 198/306...
  • Page 199 Details at the end of the recording can be analyzed in this mode by zooming in and out by varying the time interval. The clock time remains, if this mode is activated. A running recording is written from the middle to the right. PTS 400.3 PLUS Operation Manual_R02 Page 199/306...
  • Page 200: Power Quality Parameters

    GPS satellites (option). The typical recording and aggregation intervals regarding IEC 61000-4-30, like: 10(12) and 150(180) cycles at 50(60) Hz or 10s, 10min, 2h are supported, but other intervals can also be configured. PTS 400.3 PLUS Operation Manual_R02 Page 200/306...
  • Page 201: Magnitude UiFpqs

    ON  OFF Recording Load/Save Settings Exit Back to calling menu Selection of magnitude values Phase voltages U1, U2, U3 Time interval of graph window 2 h of total 2 h 45 min PTS 400.3 PLUS Operation Manual_R02 Page 201/306...
  • Page 202 Graph  Table View ON  OFF Min/Max values Overview of actual load values [13.2] Load/Save Settings Exit Back to calling menu Selection of magnitude values Phase voltages U1, U2, U3 and frequency PTS 400.3 PLUS Operation Manual_R02 Page 202/306...
  • Page 203: Harmonics And Interharmonics

    The values listed with checkboxes can be analyzed individual or in any combination. Phase to neutral voltages Phase currents Active (P), reactive (Q) and appar- ent (S) power per phase 1, 2, 3) Neutral or Protecting Earth (PE) current (not available at PRS 600.3) PTS 400.3 PLUS Operation Manual_R02 Page 203/306...
  • Page 204 Any combination of 2 or 3signals can be displayed (e.g. all phase neutral voltages U1, U2, U3). Note: If more than three checkboxes are active, the left and upper checkboxes have priority. PTS 400.3 PLUS Operation Manual_R02 Page 204/306...
  • Page 205 3rd harmonic (H3) Graph  Table View ON  OFF Component selection Load/Save Settings Exit Back to calling menu Indication type Percentage of fundamental Selection of values to analyse Phase voltages U1, U2, U3 PTS 400.3 PLUS Operation Manual_R02 Page 205/306...
  • Page 206: Thd Total Harmonic Distortion

    Vertical scale ON  OFF Min/Max values Load/Save Settings Exit Back to calling menu Selection of THD values Phase voltages U1, U2, U3 Time interval of graph window 24 h of total 7 days PTS 400.3 PLUS Operation Manual_R02 Page 206/306...
  • Page 207: Flicker

    A model of the lamp – eye – brain response defines the relation between voltage variations and in- stantaneous flicker sensation Pfs, followed by a statistically evaluation of the Pfs signal over a 10 min interval. The main outputs are: PTS 400.3 PLUS Operation Manual_R02 Page 207/306...
  • Page 208 The time parameters for the instantaneous (TA5), short term (Tst) and long term (Tlt) flicker evalua- tion can be programmed directly (PQ online only). Evaluation time Unit (cyclical) Instantaneous flicker ms, s, min Short term flicker s, min, hour Long term flicker PTS 400.3 PLUS Operation Manual_R02 Page 208/306...
  • Page 209 Back to calling menu Selection of values Voltage U1 and instantaneous and short term flicker of U1 Time interval of graph window 1 min Flicker Parameters Max. instantaneous flicker evaluated over 500 ms PTS 400.3 PLUS Operation Manual_R02 Page 209/306...
  • Page 210: Unbalance

    The negative sequence unbalance (U2/U1) is more important. Typical limit for negative sequence unbalance regarding EN 50160: U2/U1 ≤ 2 % Selectable Values Zero sequence voltage unbalance factor [%] Negative sequence voltage unbalance factor [%] PTS 400.3 PLUS Operation Manual_R02 Page 210/306...
  • Page 211 Unbalance table view Example: Analysis of recorded unbalance of 1 week Graph  Table View Load/Save Settings Exit Back to PQ Online menu Selection of unbalance factors Zero sequence (U0/U1), Negative sequence (U2/U1) PTS 400.3 PLUS Operation Manual_R02 Page 211/306...
  • Page 212: Mains Signaling

    The parts of the recorded mains signal (U1sig) above the defined thresh- old Us (0.7% of 230V = 1.61V) are marked red and show the mains signal- ing (ripple control) telegram coupled on voltage U1. PTS 400.3 PLUS Operation Manual_R02 Page 212/306...
  • Page 213 U1sig [V] RMS value of detected mains signaling compo- nent on U1 of the intervals, where the threshold (0.5 % of 230V = 1.15V) is surpassed. f1max [Hz] Detected frequency of U1sig PTS 400.3 PLUS Operation Manual_R02 Page 213/306...
  • Page 214: Events Or Discrete Disturbances

    This results in 4 combinations of trigger level and even duration, for which the number of admissible events per observation period can be defined. PTS 400.3 PLUS Operation Manual_R02 Page 214/306...
  • Page 215 Swell in % of Un, Uc Interrupt Threshold Hysteresis of threshold absolute in V Current Parameters Reference current I Threshold Inrush current Hysteresis of threshold absolute in A in % of current I PTS 400.3 PLUS Operation Manual_R02 Page 215/306...
  • Page 216 Note: The input of the parameters (reference values of The wave form details at start and end of the event are shown (9 cycles of the U and I, threshold, hysteresis) is only available at PQ fundamental). online. PTS 400.3 PLUS Operation Manual_R02 Page 216/306...
  • Page 217 A three phase dip is finished, as soon as ALL ONE voltage is higher than the threshold + voltages are higher than the threshold + hystere- hysteresis level. sis level. t interruption Dip threshold Interruption threshold t dip PTS 400.3 PLUS Operation Manual_R02 Page 217/306...
  • Page 218: Transients

    This results in 4 combinations of trigger level and event duration, for which the number of admissible events per observation period can be de- fined. PTS 400.3 PLUS Operation Manual_R02 Page 218/306...
  • Page 219 Event on Phase to Neutral Voltage Voltage Parameters Nominal frequency fn Nominal voltage Un Peak value Trigger Gradient absolute in % of Un Current Parameters Reference current I Peak value Trigger Gradient absolute in % of I PTS 400.3 PLUS Operation Manual_R02 Page 219/306...
  • Page 220 Definition of event values and parameters Indication of events on phase voltage U1 is selected only. Note: The input of the parameters (reference values of f, U and I, threshold, gradient) is only available at PQ online. PTS 400.3 PLUS Operation Manual_R02 Page 220/306...
  • Page 221 Positive / negative peak value: Highest positive or negative value reached during the event. Slope of the green marked transient part of the wave form. Graph  Table View ON  OFF Recording Load/Save Settings Exit Back to calling menu PTS 400.3 PLUS Operation Manual_R02 Page 221/306...
  • Page 222: Power Quality Online Measurement

    Enable [] / disable [X] the available voltage and current phases by pressing on the corresponding buttons (cyclical mode). Load / save a configuration Different configurations (e.g. voltages only, phase 1 (U1, I1) only etc.) can be saved and recalled later. PTS 400.3 PLUS Operation Manual_R02 Page 222/306...
  • Page 223: Overview Of Actual Load Values UiFpqs

    • Reactive power per phase and sum (Q Q) • Apparent power per phase and sum (S S) • Power factors per phase and sum (PF , PF , PF) • Frequency (f) PTS 400.3 PLUS Operation Manual_R02 Page 223/306...
  • Page 224: Uipqs Values

    Start / Stop recording Recording ON The online recording is active with the basic time inter- val. The Start/Stop button is shown depressed. The manual range selection is active with the predefined current and voltage ranges. PTS 400.3 PLUS Operation Manual_R02 Page 224/306...
  • Page 225 Select between graph or table view (at all parameters, except harmonics) Select between graph, table or histogram view at harmonics (cyclical mode) The selection can be changed at any time during recording or at stopped recording. PTS 400.3 PLUS Operation Manual_R02 Page 225/306...
  • Page 226 1 result row forward backward 1 time interval 1 result / 1 event 1 result / 1 event backward forward Bigger time interval Smaller time interval (zoom out / overview) (zoom in / details) PTS 400.3 PLUS Operation Manual_R02 Page 226/306...
  • Page 227: Power Quality Recording

    The actual allocation of the CF card (used, free memory) and the expected memory usage for the selected profile and recording duration are indicated. The already recorded values can be ana- lyzed in parallel with the analysis function. PTS 400.3 PLUS Operation Manual_R02 Page 227/306...
  • Page 228: Run A Power Quality Recording

    Example: Load recording and analysis profile for evaluation of the supply voltage regarding standard EN 50160 for 1 week (e.g. EN 50160 P05 1W) The expected memory usage of the loaded profile is indicated with a blue bar (13 MB). PTS 400.3 PLUS Operation Manual_R02 Page 228/306...
  • Page 229 All recordings are saved with a time stamp with the actual date and time as in- dicated in the status field in the lower right corner. Check time and date settings and change if necessary at Data Base / Setup / Clock setup [5.1]. PTS 400.3 PLUS Operation Manual_R02 Page 229/306...
  • Page 230 The recording can be stopped at any time by pressing the start/stop button. The automatically stop of the recording depends on the programmed recording options. Example: The recording will stop automatically after 1 week of recording. PTS 400.3 PLUS Operation Manual_R02 Page 230/306...
  • Page 231: Setup Of Recording And Analysis Profile

    In this way profiles for e.g. the compliance verification with the standard EN 50160 for different observation periods can be prede- fined and saved and later be recalled. PTS 400.3 PLUS Operation Manual_R02 Page 231/306...
  • Page 232 1 week allowed) Not only the PQ compliance verification re- garding EN 50160 is supported, but also the compliance verification regarding modified standards or company own regulations or specially agreed contracts with customers. PTS 400.3 PLUS Operation Manual_R02 Page 232/306...
  • Page 233: Setup Of Recording Options

    Selection of IN/IE measurement inputs (not available at PRS 600.3) Voltage transformer settings Current transformer settings Recording time base (PQ online only) For a detailed description of the different settings see chapter 11.1. PTS 400.3 PLUS Operation Manual_R02 Page 233/306...
  • Page 234: Power Quality Analysis

    (e.g. last recording first). The recordings can also be transferred to a PC via interface (Ethernet or USB) or directly with a CF card reader for further analysis and reporting with the software CALegration. PTS 400.3 PLUS Operation Manual_R02 Page 234/306...
  • Page 235: Bar Graph View

    Up cursor to navigate between dif- ferent tables. Down cursor to navigate between different tables. Button to switch on/off details of harmonics. Change text alignment (left, center or right alignment) Exit of menu PTS 400.3 PLUS Operation Manual_R02 Page 235/306...
  • Page 236: Verification Of Accuracy Of Prs 600.3

    - Level adaptation MTE devices Radian devices (H 2 2431 0755) General information needed to process requests/orders for impulse adapters/cables A) Impulse cables between own instruments (EMH / MTE / EDI / HEG / L&G) • Instrument types, impulse connectors and impulse direction (Instrument A.
  • Page 237: Recommended Test Points For Active Energy 4-Wire Measurements

    • Detailed technical specification of input/output of foreign instrument (signals, supply) • Connector type and Pin assignment Based on this information MTE/EMH will check, whether a simple cable or a cable with built-in adapter is needed and then offer the cable.
  • Page 238 • • • Each mark represents 3 load points at PF=1(0°), PF=0.5(60°), PF=0.5(300°), each with 4 error results of energy measurements single phase at L1, L2, L3 and three-phase L1-L2-L3 (Total 12 results). PTS 400.3 PLUS Operation Manual_R02 Page 238/306...
  • Page 239: Meter Constants Of Impulse Outputs

    E.g. to test the full range up to 120A, 260V the range independent constant must be: cpz ≤ 1’800 [imp/Wh] or with unit Wh/imp: cpz  0.0005555 [Wh/imp] Above annotation is also applying for table 2-2 and 2-3 PTS 400.3 PLUS Operation Manual_R02 Page 239/306...
  • Page 240 360'000 180'000 90'000 (100) 345'600 172'800 86'400 43'200 (48) 172'800 86'400 43'200 21'600 (24) 72'000 36'000 18'000 9'000 (10) 34'560 17'280 8'640 4'320 (4.8) 17'280 8'640 4'320 2'160 (2.4) 7'200 3'600 1'800 0.25 PTS 400.3 PLUS Operation Manual_R02 Page 240/306...
  • Page 241 CPZ [imp/Ws] 65 (8) 130 (4) 260 (2) 520 (1) In [A] () 8'640'000 4'320'000 2'160'000 1'080'000 (1'000) 2'400 1'200 864'000 432'000 216'000 108'000 (100) 86'400 43'200 21'600 10'800 (10) 8'640 4'320 2'160 1'080 PTS 400.3 PLUS Operation Manual_R02 Page 241/306...
  • Page 242: Connection Examples

    Connection examples PTS 400.3 PLUS connection examples 17.1.1 Testing of a direct connected 4-wire meter up to 12A Complex electronic meter PTS 400.3 PLUS Operation Manual_R02 Page 242/306...
  • Page 243 Simple mechanical meter PTS 400.3 PLUS Operation Manual_R02 Page 243/306...
  • Page 244 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 244/306...
  • Page 245: Testing Of A Direct Connected 3-Wire Meter Up To 12A

    17.1.2 Testing of a direct connected 3-wire meter up to 12A PTS 400.3 PLUS Operation Manual_R02 Page 245/306...
  • Page 246 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 246/306...
  • Page 247: Testing Of A Direct Connected 4-Wire Meter Up To 120A

    17.1.3 Testing of a direct connected 4-wire meter up to 120A PTS 400.3 PLUS Operation Manual_R02 Page 247/306...
  • Page 248 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 248/306...
  • Page 249: Testing Of A Direct Connected 3-Wire Meter Up To 120A

    17.1.4 Testing of a direct connected 3-wire meter up to 120A PTS 400.3 PLUS Operation Manual_R02 Page 249/306...
  • Page 250 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 250/306...
  • Page 251: Testing Of An Installed Transformer Connected 4-Wire Meter Up To 12A

    17.1.5 Testing of an installed transformer connected 4-wire meter up to 12A PTS 400.3 PLUS Operation Manual_R02 Page 251/306...
  • Page 252 PLUS. The voltage paths from voltage transformers to the meter must be interrupted, before making the connections between test terminals and PTS 400.3 PLUS voltage outputs. Regard the instructions for the use of the installed test terminals and observe local safety regulations.
  • Page 253: Testing Of An Installed Transformer Connected 3-Wire Meter Up To 12A

    17.1.6 Testing of an installed transformer connected 3-wire meter up to 12A Connections to test terminals (see explanations in chapter 17.1.5) PTS 400.3 PLUS Operation Manual_R02 Page 253/306...
  • Page 254: Testing Of An Installed Direct Connected 4-Wire Meter Up To 120A

    17.1.7 Testing of an installed direct connected 4-wire meter up to 120A PTS 400.3 PLUS Operation Manual_R02 Page 254/306...
  • Page 255 Connections to meter under test (example for IEC-type meter) Attention! The meter must be disconnected from mains and load during the time the tests are performed and during the connections to the PTS 400.3 PLUS are made or re- leased. Switch off mains and load circuit breakers.
  • Page 256: Testing Of An Installed Direct Connected 3-Wire Meter Up To 120A

    17.1.8 Testing of an installed direct connected 3-wire meter up to 120A PTS 400.3 PLUS Operation Manual_R02 Page 256/306...
  • Page 257 Connections to meter under test (example for IEC-type meter) Attention! The meter must be disconnected from mains and load during the time the tests are performed and during the connections to the PTS 400.3 PLUS are made or re- leased. Switch off mains and load circuit breakers.
  • Page 258: Prs 600.3 Connection Examples

    PRS 600.3 connection examples 17.2.1 Testing of an installed transformer connected 4-wire meter PTS 400.3 PLUS Operation Manual_R02 Page 258/306...
  • Page 259 Warning! The current path on secondary side of an active current transformer must al- ways remain closed. Dangerous high voltages can occur and the current transformer and the instrument can be damaged, if the current path is opened during measure- ments. PTS 400.3 PLUS Operation Manual_R02 Page 259/306...
  • Page 260: Testing Of An Installed Transformer Connected 3-Wire Meter

    17.2.2 Testing of an installed transformer connected 3-wire meter Connections to test terminals (see explanations in chapter 17.2.1) ---- Optional connection to protected earth (PE) PTS 400.3 PLUS Operation Manual_R02 Page 260/306...
  • Page 261: Testing Of An Installed Direct Connected 4-Wire Meter With Clamp-On Ct (120A)

    17.2.3 Testing of an installed direct connected 4-wire meter with clamp-on CT (120A) PTS 400.3 PLUS Operation Manual_R02 Page 261/306...
  • Page 262 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 262/306...
  • Page 263: Testing Of An Installed Direct Connected 3-Wire Meter With Clamp-On Ct (120A)

    17.2.4 Testing of an installed direct connected 3-wire meter with clamp-on CT (120A) PTS 400.3 PLUS Operation Manual_R02 Page 263/306...
  • Page 264 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 264/306...
  • Page 265: Testing Of An Installed Direct Connected 2-Wire Meter With Clamp-On Ct (120A)

    17.2.5 Testing of an installed direct connected 2-wire meter with clamp-on CT (120A) PTS 400.3 PLUS Operation Manual_R02 Page 265/306...
  • Page 266 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 266/306...
  • Page 267: Testing Of A Direct Connected 4-Wire Meter Up To 12A With Source

    17.2.6 Testing of a direct connected 4-wire meter up to 12A with source PTS 400.3 PLUS Operation Manual_R02 Page 267/306...
  • Page 268 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 268/306...
  • Page 269: Testing Of A Direct Connected 3-Wire Meter Up To 12A With Source

    17.2.7 Testing of a direct connected 3-wire meter up to 12A with source PTS 400.3 PLUS Operation Manual_R02 Page 269/306...
  • Page 270 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 270/306...
  • Page 271: Testing Of A Direct Connected 4-Wire Meter Up To 120A With Source

    17.2.8 Testing of a direct connected 4-wire meter up to 120A with source PTS 400.3 PLUS Operation Manual_R02 Page 271/306...
  • Page 272 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 272/306...
  • Page 273: Testing Of A Direct Connected 3-Wire Meter Up To 120A With Source

    17.2.9 Testing of a direct connected 3-wire meter up to 120A with source PTS 400.3 PLUS Operation Manual_R02 Page 273/306...
  • Page 274 Test links closed For other type of meters (ANSI Form S, Form A; British Standard BS etc.) consult the documentation delivered by the manufacturer and adapt the connections to the meter regarding your needs. PTS 400.3 PLUS Operation Manual_R02 Page 274/306...
  • Page 275: 17.2.10 Burden Measurement Of Voltage Transformer

    17.2.10 Burden measurement of voltage transformer Example A: Secondary current measured direct PTS 400.3 PLUS Operation Manual_R02 Page 275/306...
  • Page 276 Example B: Secondary current measurement with clamp-on CTs PTS 400.3 PLUS Operation Manual_R02 Page 276/306...
  • Page 277: 17.2.11 Burden Measurement Of Current Transformer

    17.2.11 Burden measurement of current transformer Example A: Secondary current measured direct PTS 400.3 PLUS Operation Manual_R02 Page 277/306...
  • Page 278 Example B: Secondary current measurement with clamp-on CTs PTS 400.3 PLUS Operation Manual_R02 Page 278/306...
  • Page 279: 17.2.12 Transformer Ratio Measurement Of Current Transformer

    17.2.12 Transformer ratio measurement of current transformer Example A: Primary current measured with clamp-on CTs (1000 A) Secondary current measured direct (12 A) PTS 400.3 PLUS Operation Manual_R02 Page 279/306...
  • Page 280 Example B: Primary current measured with clamp-on CTs (1000 A) Secondary current measured with clamp-on CTs (120 A) PTS 400.3 PLUS Operation Manual_R02 Page 280/306...
  • Page 281 Example C: Primary current measured with clamp-on CTs (3000 A) Secondary current measured direct (12 A) PTS 400.3 PLUS Operation Manual_R02 Page 281/306...
  • Page 282 Example D: Primary current measured with clamp-on CTs (3000 A) Secondary current measured with clamp-on CTs (120 A) PTS 400.3 PLUS Operation Manual_R02 Page 282/306...
  • Page 283: 17.2.13 Ratio Measurement Of Current Transformer With Amplitewire 2000A

    3-phase 4-wire installation. Check phases L2, L3 in the same way phase by phase (blue marked). Attention! Regard the instructions for the use of the AmpLiteWire high voltage current sensor and observe local safety regulations for measurements on high voltage poten- tial. PTS 400.3 PLUS Operation Manual_R02 Page 283/306...
  • Page 284 Example B: Three phase measurement, secondary current measurement with clamp-on CTs PTS 400.3 PLUS Operation Manual_R02 Page 284/306...
  • Page 285: 17.2.14 Ratio Measurement Of Voltage Transformer With Voltlitewire 40Kv

    3-phase 4-wire installation. Check phases L2, L3 in the same way phase by phase (blue marked). Attention! Regard the instructions for the use of the VoltLiteWire high voltage voltage sensor and observe local safety regulations for measurements on high voltage poten- tial. PTS 400.3 PLUS Operation Manual_R02 Page 285/306...
  • Page 286 Example B: Three phase measurement PTS 400.3 PLUS Operation Manual_R02 Page 286/306...
  • Page 287: 17.2.15 Testing Of A 3-Phase Reference Meter In 4-Wire Mode

    17.2.15 Testing of a 3-phase reference meter in 4-wire mode PTS 400.3 PLUS Operation Manual_R02 Page 287/306...
  • Page 288: 17.2.16 Testing Of A 3-Phase Reference Meter In 3-Wire Mode

    17.2.16 Testing of a 3-phase reference meter in 3-wire mode ---- Optional connection to ground the source in measuring set-up, if the source is completely gal- vanically isolated (e.g. PPS 400.3) PTS 400.3 PLUS Operation Manual_R02 Page 288/306...
  • Page 289: 17.2.17 Testing Of A 3-Phase Reference Meter With A Single Phase Source

    17.2.17 Testing of a 3-phase reference meter with a single phase source Single-phase connection PTS 400.3 PLUS Operation Manual_R02 Page 289/306...
  • Page 290 Series / parallel connection PTS 400.3 PLUS Operation Manual_R02 Page 290/306...
  • Page 291: 17.2.18 Testing Of A Single Phase Reference Meter

    17.2.18 Testing of a single phase reference meter Single-phase connection PTS 400.3 PLUS Operation Manual_R02 Page 291/306...
  • Page 292 Series / parallel connection PTS 400.3 PLUS Operation Manual_R02 Page 292/306...
  • Page 293: 17.2.19 Testing Of A Reference Meter With Several Impulse Outputs

    17.2.19 Testing of a reference meter with several impulse outputs PTS 400.3 PLUS Operation Manual_R02 Page 293/306...
  • Page 294: 17.2.20 Verification Of Prs 600.3 Internal Reference Voltages Against Ext. Dc-Standard

    Make short circuit connections between the two red 2mm sockets and the two black 2mm sockets before starting the test Remove the short circuit connections between the red and black 2mm sockets after fin- ishing the test PTS 400.3 PLUS Operation Manual_R02 Page 294/306...
  • Page 295: 17.2.21 Verification Of Prs 600.3 Internal Time Base Against Ext. Frequency Standard

    17.2.21 Verification of PRS 600.3 internal time base against ext. frequency standard Remove all cables connected to the PRS 600.3, except the power supply cable, before starting the test PTS 400.3 PLUS Operation Manual_R02 Page 295/306...
  • Page 296: Verification Of Accuracy Of Prs 600.3

    17.2.22 Verification of accuracy of PRS 600.3 PTS 400.3 PLUS Operation Manual_R02 Page 296/306...
  • Page 297: Technical Details

    1 mA ... 12 mA 18.7 mA 0.1 VA / 3.89 V 0.1 VA / 10.4 V Resolution at the final range value 0.01 % Adjustment error at the final range value < 0.05 % PTS 400.3 PLUS Operation Manual_R02 Page 297/306...
  • Page 298 EN 61010-1 Degree of protection IP-40 Storage temperature -20°C ... +55°C  85 % at Ta  21°C Relative humidity Relative humidity  95 % at Ta  21°C at 30 days / year PTS 400.3 PLUS Operation Manual_R02 Page 298/306...
  • Page 299: Prs 600.3

    Power factor per phase 4-wire Total power factor 4-wire / 3-wire 1 2 3 Angle between current and voltage U1 U2 U3 Angle between voltage and voltage I12 I23 I31 Angle between current and current Frequency PTS 400.3 PLUS Operation Manual_R02 Page 299/306...
  • Page 300   −   3 , 1 −  −  QK41   −  QK42 QK43  −   −   −  QK31  QK33   PTS 400.3 PLUS Operation Manual_R02 Page 300/306...
  • Page 301  P4  P3  QK4  QK3  QN4  QN3         1 I , 2 I , , 3 I , , 1 P PTS 400.3 PLUS Operation Manual_R02 Page 301/306...
  • Page 302 Example: in the case of 50 Hz with a measuring signal period Tm = 20 ms and a time base T = 1s, an average is calculated over 50 RMS values or average values for each period. PTS 400.3 PLUS Operation Manual_R02 Page 302/306...
  • Page 303: Technical Data

    60 mA 0.02 1 mA … 6 mA 0.02 600 mA … Current direct up to 120 A 120 A 0.01 60 mA … 600 mA 0.02 10 mA … 60 mA 0.02 PTS 400.3 PLUS Operation Manual_R02 Page 303/306...
  • Page 304 Drift / year Measuring Quantity Range Power / Energy (PQS) I direct 0.008  ± TC [%/°C] Temperature coefficient (TC): Range Cl. 0.02 -10° C ... +15°C 0.0015 +35° C ... +50°C 0.0015 PTS 400.3 PLUS Operation Manual_R02 Page 304/306...
  • Page 305 = CPZ * P(Q, S) (e.g. Output 1) = CPZ * 3 * Un * In = 0.25 imp/Ws * 3 * 520V * 120A = 46’800 [imp/s] Factor 3 for 3-phase system PTS 400.3 PLUS Operation Manual_R02 Page 305/306...
  • Page 306 ● Power Factor ● Energy Communication ● ● ETHERNET Other functions ● Removable Compact Flash CF card memory ○ GPS time synchronization (integrated) Notes ■ Function according IEC 61000-4-30 Class A ○ Option PTS 400.3 PLUS Operation Manual_R02 Page 306/306...

Table of Contents