The installation (water and electrical work) cOntent and commissioning, as well as the mainte- nance of this equipment, must only be carried out by an authorised qualified contractor in Operating instructions for users and accordance with these instructions. contractors Equipment description Maintenance and care Important information What to do if ..?
H -30 L or H -30 LS, via the SOKI filler. The Stiebel Eltron solar heating system is to the DHW cylinder. The inside of the collector designed so that no special measures are...
Page 4
Fault Cause Remedy The pump is running, but no flow Flow meter with balancing valve stuck or Check the function of the flow meter with balancing valve. A rate is discernible at the flow meter faulty. jammed ring can block the display in the sight glass, even if the with balancing valve.
2. installatiOn instructiOns fOr cOntractOrs 2.1 Reference to other applicable 2.4 Specification documents Type SOL 27 plus SOL 27 plus C34 Observe the detailed operating and control Part no. 220455 227584 instructions in the separate installation instructions of the control units, compact...
2.5 Accessories 2.6 Installation 2.5.1 Fixing accessories To protect the system against frost and Item Standard delivery Part no. corrosion, fill the solar heating system SMR1 Quick mounting frame for one portrait col- 1 x collector support (top), 1 x collector sup- 22 13 67 exclusively with H -30 L or H -30 LS (section lector.
Page 7
Thermal insulation System diagram: Installation example Use temperature and UV-resistant thermal Temperature sensor inside the collector sensor well insulation to insulate the external pipework, - mineral wool backed by aluminium mesh foil - flexible EPDM hose Manual air (e.g. type Aeroflex , Armaflex ®...
Page 8
Air vent valve Install a manual air vent valve (lockab- Rope le) at the high points of the system; Never secure on the ends of pipes. alternatively route a ventilation line to a ma- nual air vent valve. Never use automatic air vent valves.
2.7 Installation on tiled roofs Screws M10 (6) Roof tile fixing kit BP (18 55 44) portrait side-by-side (up to 20 m installation height) Two tiled roof fixing kits (18 55 44) are Nuts M10 (5) required when installing a collector in portrait orientation on a tiled roof;...
Page 10
Fit the collector strip (1) to the roof hooks Installation situation (3) (set of bolts, washers and screws M10 from the BP kit, 18 55 44). Roof hooks (3) Initially, secure the collector strip (1) through the second hole to the first lower roof hook.
2.8 Installation on tiled roofs, Screws M10 (6) Roof tile fixing kit BP (18 55 44) landscape, side-by-side Separate at the (up to 20 m installation height) marking for landscape installation For landscape installation on tiled roofs, the BP fixing kit (18 55 44) is always required Nuts M10 (5) in twice the number of collectors.
Page 12
Fit the collector strip (1) to the roof hooks Installation situation (3) (set of bolts, washers and nuts M10 from the 18 55 44 BP). Roof hooks (3) For dimension 1232 mm, separate the collector strip (1) from below at the marking. Initially, secure the collector strip (1) through the second hole to the first lower roof hook.
2.9 Installation on tiled roofs, Screws M10 (6) Roof tile fixing kit BP (18 55 44) landscape, above each other (up to 20 m installation height) Separate at the marking, for landscape installation The frame connection set RV-W (22 06 13) supplements the BP fixing kit (18 55 44) for the Nuts M10 (5) landscape installation of collectors above each...
Page 14
First push the screws (5) for securing View collector back Gusset plate (13) the collector strip (1) into the profile rails (7) of the mounting frame R2. There will be no opportunity to fit these later. Collector strip (1) The collector strips (1) for the next collector (3) are fitted to this profile rail (7) using the next roof hooks (3).
2.10 Flat roof installation Mounting frame R1 (22 04 56) Locking brackets (9) up to 20 m installation height Two mounting frames are available: R1 for 1 collector, portrait (22 04 56) R2 for 2 collectors, portrait or 1 collector, landscape (22 04 57) Two flat roof/wall fixing kits BF S (18 55 43) are required when installing a collector...
2.11 Wall installation Forces per collector Vertical support (up to 20 m installation height) Brace Install. height Shearing force Tensile force Two mounting frames are available: up to 8 m 2.1 kN 1.1 kN R1 for 1 collector, portrait (22 04 56) Cross support up to 20 m 3.5 kN...
2.12 Installation on corrugated roofs Mounting frame R1 (22 04 56) Locking bracket (9) (up to 20 m installation height) Two mounting frames are available: for 1 collector, portrait (22 04 56) for 2 collectors, portrait or 1 collector, land- scape (22 04 57) Two corrugated roof fixing kits (18 56 59) are required when installing a collector in por-...
Page 18
Then fit the collector strip (1) on the AD AE channel profiles. Initially, secure the collector strip (1) through the second hole to the first channel profile. The second channel profile is secured with a suit- Channel strip 3 able slot to the collector strip. The first and second holes in the collector strip Channel strip 4 are provided for securing the profile rail (7).
2.13 Frame connection set Frame connection set RV (18 56 60) Screws M10 (5) The frame connection set RV (18 56 60) AG AH is designed to join several mounting frames. It comprises of the following: - 2 no. frame connectors (31) - 1 set of bolts and nuts M10 (SW 15/17) - 1 no.
Page 20
Then continue with the support installation as described below. Fitting the support Then assemble the ends of the collector strips (1) on the profile rails (7). For this, observe Pivoting bracket (34) ) that respectively two screws must be pushed into the channel of the upper and the lower Angle strip (36) profile rails, prior to securing the collector...
2.14 Quick installation on tiled Quick fixing kit for tiled roofs SBP (22 13 66) roofs portrait side-by-side (up to 20 m installation height) The quick installation on tiled roofs requires the quick installation frame SMR1 (22 13 67) for 1 collector, SMR2 (22 13 68) for 2 collectors, Roof hooks (37) the quick frame connection set...
Page 22
For the roof hook clearances, see Fig. AV. Installation situation The pre-assembled roof hooks (37) must Roof hooks (37) Wing nut only be pushed over the rafter and the tile. The roof hook clip then clips in behind the batten. Tighten the wing nut accordingly.
Page 23
Then position the collectors on the collector supports (38/39). When positioning the collectors, start with the l.h. collector. After the l.h. collector has been BA BB positioned, plug the centre lock (42) into the slots provided for this in the upper collector strip (38).
Page 24
Connection of two mounting frames To join two mounting frames (collector supports), push the frame connection strip (45) up to the marking in the chamber of the lower collector support (39). Then push the second collector support onto the frame connection strip (45).
2.16 Lightning protection and Lightning protection earthing In existing lightning protection systems, contractors should include the collector casings, the mounting frames and the pipework. Collector casing Drill into the face of each collector and attach it to the lightning protection system via a screw fitting.
2.17 Positioning of and intercon- nection between collectors Secure the collectors respectively with BH BI two locking brackets (9) at the top and bottom. For this, insert the screw (6) (from set 22 04 56 or 22 04 57) into the side of the profile rail channel and push it to the required position where the locking bracket is to be located.
2.18 Filling the heat transfer circuit 2.19 Pressure test Connect the hose to the filling pump: - From the pump (pressure side) to the top After the pipework has been installed and the Observe the EC safety datasheet for fill & drain valve collectors have been connected, pressure test H -30 L, and fit a copy somewhere - From the bottom fill &...
Has the solar storage system been installed to the water mains in accordance with the Stiebel Eltron installation example and the appropriate regulations? Installation in accordance to the Stiebel Eltron Has the temperature sensor in the solar storage system...
GUARANTEE Guarantee For guarantees please refer to the respective terms and conditions of supply for your country. The installation, electrical connection and first operati- on of this appliance should be carried out by a qualified installer. The company does not accept liability for failure of any goods supplied which have not been installed and ope- rated in accordance with the manufacturer‘s instructions.