Download Print this page

Base Station Setup - FJ DYNAMICS AT1 Quick Manual

Advertisement

1 Base Station Setup

1.1 preparation
a
V1 receiver
b
Adaptor with 5/8-inch screw
c
Radio antenna
1.2
Select the erection position of the reference station; The
requirements are as follows:
1. Choose a place with high terrain and no trees or power towers nearby;
2. Choose the land with dense soil to ensure that the position does not
move after installation;
3. This position will not be affected by the rolling and collision of working
machinery;
d
Alignment pole
e
Tripod
f
Marking pin
2

Advertisement

loading
Need help?

Need help?

Do you have a question about the AT1 and is the answer not in the manual?

This manual is also suitable for:

At2B1