SolarPower24 Voltronic LIO II-4810 Manual

SolarPower24 Voltronic LIO II-4810 Manual

Standalone lithium-iron phosphate battery module 5.16kw

Advertisement

User Manual
Voltronic LIO II-4810
Standalone Lithium-Iron
Phosphate Battery Module
5.16kW
Version: 1.1
1
Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia
Tel/What's up +39 05431995799 – web
www.solarpower24.it
– email
solarpower24@solarpower24.it

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Voltronic LIO II-4810 and is the answer not in the manual?

Questions and answers

Summary of Contents for SolarPower24 Voltronic LIO II-4810

  • Page 1 User Manual Voltronic LIO II-4810 Standalone Lithium-Iron Phosphate Battery Module 5.16kW Version: 1.1 Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 2: Table Of Contents

    4.1 Start up the battery module ............. 22 4.2 Shut-off the battery module ............. 22 5. Trouble Shooting ................23 Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email...
  • Page 3: Safety Precautions

    6) Please do not open, repair, or disassembly the battery except staff authorized. We do not undertake any consequences or related responsibility which because of violation of safety operation or violating of design, production, and equipment safety standards. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it...
  • Page 4: Introduction

    PDU module can be purchased separately. Following contents will be included in its separately package: PDU Module Cable Gland (x2) Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 5: Specifications

    Charge : 0ºC ~ 50 ºC Temperature Discharge : 0ºC ~ 50 ºC Communication RS485 (RJ45), extension port (RJ11) Certifications UN38.3, IEC 62619 Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 6: Product Indicator & Setting

    RS485 Port (BMS Communication Port) Connector type: RJ45  Function: communication between battery module and inverter module.  Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 7 Function: BMS signal transmission for battery module and for battery capacity extension in parallel.  Pin Definition  Definition CANH CANL PresentA PresentB Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 8 Maximum 10 battery modules can be operated in parallel.  Definition 0x0F 0x0E 0x0D 0x0C 0x0B 0x0A 0x09 0x08 0x07 0x06 Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 9: Installation

    0°C to 50°C. Frequent exposure to harsh temperatures may deteriorate the performance and shorten the life cycle of the battery module. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it...
  • Page 10: Mounting The Modules

    Wall 612 .5 mm 410 .00mm 85.00mm 85.00mm 583 .00mm Floor Remove nut, spring washer and flat washer. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 11 Install one fixing plate to fix two battery modules with four screws as following the picture shown. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 12 Additional Battery Module Follow the same procedure as step (b) to fix the other side. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 13: Wiring Configuration

    Step 2 (If multiple battery modules are in parallel): Insert RJ11 cable to connect the extension port of the master battery module*. The other end connects to the extension port of the #2 battery module. If there are more Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it...
  • Page 14 RJ11 cable RJ11 cable BAT- BAT- BAT+ BAT- BAT+ BAT+ BAT- BAT+ BAT- BAT+ BAT- BAT+ Master battery module Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 15 "Master battery module". Be sure to set ID number for Master battery module as "0". Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it...
  • Page 16 If more than one battery modules are connected, use battery cable to connect master battery module and remaining battery module one by one. Master battery module Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 17 (e) After connecting all cables, the battery modules are ready for DC output. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 18: Wiring Diagrams Of Diverse Applications

    3.4 Wiring Diagrams of Diverse Applications Single battery module connection with a max 150A current wiring: (suitable for ≤6KW Inverter) Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 19 Inverter RJ45 cable RJ11 Jumper BAT- BAT+ RJ11 cable Master Battery Module BAT- BAT+ BAT+ BAT- BAT+ BAT- Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 20 Optional output II: Master BAT- BAT+ Battery Module RJ11 cable BAT+ BAT- BAT+ BAT- BAT+ BAT- BAT+ BAT- Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 21 RJ11 cable RJ11 cable BAT- BAT+ BAT+ BAT- RJ11 cable BAT+ BAT- BAT- BAT+ BAT+ BAT- BAT- BAT+ Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...
  • Page 22: Start-Up/Shut-Off The Battery Module

    4.2 Shut-off the battery module When battery module is in the operating mode, press manual ON/OFF button for 5 seconds. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it...
  • Page 23: Trouble Shooting

    Communication ID switch conflict. setting and correct them. failure is detected Shut down system and call maintenance System failure detected. service. Solarpower24.it by Barba S.r.l. – via Locchi, 3F – 47122-Forlì – Italia Tel/What’s up +39 05431995799 – web www.solarpower24.it – email solarpower24@solarpower24.it...

Table of Contents